The Example of Malaysia
Transkript
The Example of Malaysia
A Unique Policy Development Outside Europe: The Example of Malaysia Ir. Ahmad Hadri Haris [email protected] National Project Leader MBIPV Project Malaysia Energy Centre (PTM) MBIPV in 2006: Positioning the Cornerstone 2 Potential of Solar Power in Malaysia Malaysia: Total electricity consumed in 2005 = 85 TWh Total land area = 328,550 km2 Average irradiance =1,643 kWh/m2/yr If PV is to supply the total electricity, it will occupy only 431 km2 or 0.13% total land area! MBIPV in 2006: Positioning the Cornerstone 3 Malaysia: Net Oil & Gas Exporter Malaysia Source: Petronas MBIPV in 2006: Positioning the Cornerstone 4 Cheap Electricity Price due to Subsidy 1,000.00 Subsidised NG price: RM6.40/mmBTU (market RM22-30/mmBTU) 900.00 800.00 700.00 600.00 RM/MWh Petronas subsidised natural gas prices for electricity generation, amounting to RM11.7 billion (€2.5 billion) in 2006 500.00 400.00 300.00 200.00 100.00 Peak - OC (gas) Capacity Cost MBIPV in 2006: Positioning the Cornerstone Inter - CC (gas) Base - gas (gas) Energy Cost Base - PC (Coal) Subsidy 5 Development of Solar Programme 2 LFA (Logical Framework Analysis) workshops 1 stakeholders seminar >200 participants total Stakeholders: Government, industry, finance, NGOs, R&D, universities, etc. MBIPV in 2006: Positioning the Cornerstone 6 …via Logical Framework Analysis PROBLEM ANALYSIS Stakeholder analysis - classification ACEM, SNO, Redha, JKR, TNB, UNITEN, MECM, MHLG, Consumer, Putrajaya Holding, SIRIM Pro GHG lead to Global Warming Shell Solar, Poul (LEO Building), Building Council, UM, BP Solar, MAVCAP, Grenidea, MEPA, NGO, AES, MOSTE Fossil Fuel is Polluting PV cannot be implemeted widely People do not buy PV 2 1 Petronas, Banks, Policy makers, 3 4 IPPs, other RE industries, EPU Active Passive BIPV Not Attractive Not Aware of PV Technologies BIPV is still research in M alaysia Electricity price is low Finance Expensive Implementation of RE Policy Progessing Slow Too much emphasis on other RE forms other than PV Lack of (a) publicity (b) training (c) sucess stories (d) environment impact of use (e) cultural acceptance PV is expensive Competing sources of power supply Finance not obtainable not available No Malaysian Standardization PV Utility inter ties Accreditation programme for solar companies No policy on buying rate from PV (a) insufficient comformity of back up supprt (b) lack of iincentives Small Volume has high m anufacturing costs No Finance Scheme No by laws gazetted regarding connected PV Contra Reduce Global warming and pollution OBJECTIVE ANALYSIS Minimise use of fossil fuel Strategy analysis – summary Energy source sustainable PV implemented widely GOAL (long term >20 y) To contribute to sustainable development through cheaper energy use, less reliance & more selfefficiency OUTCOME / PURPOSE (long term 10-20y) To contribute towards sustainable commercial BIPV market in Malaysia (without subsidies) People will buy BIPV is attractive PV energy price reflect cost OUTPUT (for project 5 y) ESTABLISHED NATIONAL TARGETS AFFORDABLE BIPV SYSTEM IN MALAYSIA TECHNICALLY DEVELOPED MARKET INCREASED PUBLIC ACCEPTANCE OF BIPV All power source treated equally PV affordable High Volume Low Manufacturing Cost More PV players become competent Low Transaction Cost Financing is cheap Funding Available RE Policy Implemented Successfully Malaysian standard on interconnected established PV Given Priority By back rate reasonable low gazeted and enforced MBIPV in 2006: Positioning the Cornerstone 7 …created Comprehensive Programme Project Planning Matrix MBIPV in 2006: Positioning the Cornerstone 8 MBIPV Project (2005 - 2010) Objective: To reduce GHG emission by reducing long-term cost of BIPV technology via development of a sustainable BIPV market Component 1: BIPV information services, awareness and capacity building programme Component 2: BIPV market enhancement & infrastructure development programme Component 3: BIPV policies and financing mechanisms programme Component 4: BIPV industry development and technology localisation programme Targets: 330% increased of BIPV capacity against baseline 20% reduction of BIPV unit cost from baseline BIPV Programme in 10th Malaysia Plan (10MP) Post MBIPV Project: Sustainable & widespread BIPV applications, National BIPV programme with 30% annual BIPV growth and further cost reduction MBIPV in 2006: Positioning the Cornerstone 9 C2: financial & technical support C1, C2: quality installations (ISP accredited training) C4: quality products, C1: quality services C1: consumer awareness & appreciation C3: grid access, net-meter, license C2: monitoring MBIPV in 2006: Positioning the Cornerstone C1: policy makers C3: RE-FIT (future) 10 BIPV Showcase: Office PTM-ZEO (zero energy office): 92 kWp System A: 47.28kWp (polycrystalline) System B: 6.08kWp (amorphous) B A C D D System C: 11.6kWp (glass-glass, mono) System D: 27kWp (monocrystalline) MBIPV in 2006: Positioning the Cornerstone 11 BIPV Showcase: University Monash University (Malaysia) 7.36 kWp amorphous thin-film MBIPV in 2006: Positioning the Cornerstone 12 BIPV Showcase: Residential Homes Multiple BIPV bungalows at Precinct 16, Putrajaya by Senandung Budiman S/B MBIPV in 2006: Positioning the Cornerstone 13 BIPV Demonstration: Private Buildings MBIPV in 2006: Positioning the Cornerstone 14 SURIA 1000: Public Programme Results to date: (For 1st and 2nd Calls) 30 houses 151.98 kWp total (vs 100 kWp) RM 2,049,123 of rebate RM 2,025,383 of public contributions (50%) 3rd Call: 90 kWp 4th Call: 120 kWp 5th Call: 140 kWp 6th Call: 160 kWp 7th Call: 180 kWp Suria for Developer: 340 kWp MBIPV in 2006: Positioning the Cornerstone 15 SURIA 1000: Capacity Impact SURIA 1000: BIPV Capacity 180 387% 160 246% 140 kWp 120 156% 100 80 154.66 100% 60 40 147.87 146% 100% 93.72 60 20 58.26 40 0 Planned Received 1st Call Successful (Approved) 2nd Call MBIPV in 2006: Positioning the Cornerstone 16 SURIA 1000: Impact on WTP SURIA 1000: Average Willingness to Pay 2,500,000 50.2% 2,000,000 38.3% 1,500,000 RM 51.7% 2,015,479 1,000,000 46.7% 1,703,990 30% 500,000 1,264,189 25% 761,194 522,000 300,000 0 Planned Received 1st Call Successful (Approved) 2nd Call MBIPV in 2006: Positioning the Cornerstone 17 SURIA 1000: Encourages Healthy Competition SURIA 1000: Average BIPV Unit Price 31,000 30,000 30,000 28,793 29,000 28,006 RM/kWp 29,000 28,000 GCPV System 6 months 27,000 27,165 26,000 -7% PV Modules -11% Inverter -15% M&E Works +10% 26,067 25,000 24,000 Planned Received Successful (Approved) 1st Call MBIPV in 2006: Positioning the Cornerstone 2nd Call 18 Impact of Programme: Cost Reduction > Target 35,000 (Baseline) 31,410 31,410 31,096 30,782 Target 30,154 Actual 29,525 30,000 28,583 27,641 26,384 28,817 27,769 25,000 25,128 (Target) Dec 09 Jun 09 Dec 08 Jun 08 Dec 07 June 07 Jun 06 20,000 Dec 06 26,094 2006 Prices: • Japan: RM21/Wp • Germany: RM23/Wp • USA: 27/Wp • South Korea: 29/Wp Jun 10 29,300 Dec 05 Unit Cost Grid Connected PV System [RM/kWp] Unit Cost of Grid Connected PV System in Malaysia Month-Year Status (31/12/2007): RM26,094/kWp ±5% MBIPV in 2006: Positioning the Cornerstone 19 Impact: Progressive Increased of kWp Cumulative Grid Connected PV Capacity in Malaysia (Inclusive of Awarded Suria 1000) (Target) Target 2,000 Actual 1,500 1,000 2,013 1,768 1,608 1,063 943 789 658 663 598 486 473 482 473 468 (Baseline) 468 500 Jun 10 Dec 09 Jun 09 Dec 08 Jun 08 Dec 07 June 07 Dec 06 Jun 06 Dec 05 Grid Connected PV Capcity [kWp] 2,500 Month-Year Status (31/12/2007): 789 kWp (inclusive awarded SURIA 1000) MBIPV in 2006: Positioning the Cornerstone 20 Impact: PV Technology in IMP-3 IMP-3 launched by Prime Minister 19th August 2006 on IMP-3: 15-year industry development plan (2006 to 2020) MBIPV in 2006: Positioning the Cornerstone 21 Incentive to PV & Equipment Manufacturers Special tax incentive Special land & infrastructure packages Reliable, good quality and low cost supply of electricity & water Location between East and West with good political stability Established wafer & media storage manufacturers with highly skilled labours and excellent value chain support Malaysian Industrial Development Authority (MIDA) Block 4, Plaza Sentral, Jalan Stesen Sentral 5, Kuala Lumpur Sentral, 50470 Kuala Lumpur, Malaysia Tel : 603-2267 3633, Fax : 603-2274 7970 Email : [email protected] First Solar (663 MW in Kulim), aluminum frames supply, Website: http://www.mida.gov.my equipment manufacturing & clean room equipment MBIPV in 2006: Positioning the Cornerstone 22 MBIPV Project: Lessons Learned Challenges: Developing country: competition for fund, regulated electricity price Oil/gas net-exporting country: subsidised electricity, cheaper to use fossil fuel based energy Development programme (policy): Creates umbrella to prepare market (public, industry, policy makers) Strengthen public acceptance & industry readiness Stimulates competitive system prices in the market Encourages higher public willingness to pay Leads to transition from capital based incentive to performance based incentive (RE-FIT) MBIPV fund: RM19.6 million Capital based (MBIPV) Performance based 1545 kWp 653 kWp 50% grant For 21 years at RM1.30/kWh MBIPV in 2006: Positioning the Cornerstone 23 Success in MBIPV today builds confidence towards long-term solar target & RE-FIT Market Potential of RE Power Generation Capacity, based on Corresponding Annual Growth Rate 30% 8,000.0 Note: Conservative PV growth rate for Malaysia 7,000.0 25% 5,000.0 Note: Realistic biomass growth rate for Malaysia 15% 4,000.0 3,000.0 10% 2,000.0 5% 1,000.0 RE (Non-PV) Annual Growth Rate (%) BIPV Annual Growth Rate (%) BIPV Cum. MW Capacity MBIPV in 2006: Positioning the Cornerstone 2050 2049 2048 2047 2046 2045 2044 2043 2042 2041 2040 2039 2038 2037 2036 2035 2034 2033 2032 2031 2030 2029 2028 2027 2026 2025 2024 2023 2022 2021 2020 2019 2018 2017 2016 2015 2014 2013 2012 2011 0% 2010 Growth Rate % 20% RE Cumulative MW Capacity 6,000.0 RE (Non-PV) Cum. MW Capacity 24 Thank You Pusat Tenaga Malaysia No.2, Jalan 9/10, Persiaran Usahawan, Seksyen 9, 43650 Bandar Baru Bangi, Selangor Darul Ehsan Tel: 03-8921 0800 Fax: 03-8921 0802 Email: [email protected] Website: www.ptm.org.my/bipv MBIPV in 2006: Positioning the Cornerstone 25
Benzer belgeler
INTERNATIONAL SYMPOSIUM AND WORKSHOP ON `WAQF AND
Moderator: Siti Khadijah Ab Manan
Presentations (12 mins each):
1. Rohayati Hussin et al (UKM), (The Uniformity of Waqf
Implementation in Malaysian Universities: A Way Forward),
2. Anas Yusof, (UN...