indir
Transkript
indir
Session: Turbine Manufacturers and New Technologies Istanbul November 2014 A.Beyer THE VALUE CHAIN - NORDEX IS MORE THAN A TURBINE MANUFACTURER Project Development Turbine Delivery Civil Works Electrical Infrastructure Installation & Commissioning Hand over Service Selection of location Ownership Optimal siting Wind measurements Soil survey Noise / shade emission Economic viability Grid connection Special purpose registration Environmental permitting Building permitting Project Development, Marketing, Financing Wind Farm System Planning Leading company in France Review customer micro-site planning Active also in Poland, Sweden, USA and LatAm Support customers (co-development) to receive approvals and to optimise park layouts Production and Technical Implementation Assemble WTG Produce selected components Install onsite Carry out initial operation Wind Farm Operations Offer additional services: increased demand due to new wind farm investors interested in stable cash flows Service and Maintenance ~3,000 turbines currently under Nordex service Full service contract offerings up to 15 years Product Development; Turbines, SCADA and Windfarm features TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 2 NORDEX MULTI MEGAWATT TURBINES – AN EVOLUTIONARY DEVELOPMENT 14 years and more than 7,600 MW Windpower Monthly’s criteria: Generation Gamma Generation Beta N90/2500 N90/2500 N100/2500 N117/2400 Generation Alpha clever use of technology innovation product-market impact and relevance fitness for purpose reliability record grid connectivity installation and upkeep N80/2500 Global fleet availability in 2013 ~98 % Turbines under Nordex Service 2000 2007 TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 2010 2013/14 3 NORDEX MULTI MEGAWATT TURBINES – AN EVOLUTIONARY DEVELOPMENT 14 years and more than 7,600 MW Generation Delta Generation Gamma Generation Beta N90/2500 N100/3300 N117/3000 N131/3000 N90/2500 N100/2500 N117/2400 Generation Alpha N80/2500 Global fleet availability in 2013 ~98 % Turbines under Nordex Service 2000 2007 TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 2010 2013/14 4 25% MARKET SHARE* – REFERENCES IN TURKEY IN OPERATION CUSTOMER DOST ENERJİ DOST ENERJİ DOST ENERJI DOST ENERJİ DOST ENERJİ BİLGİN ENERJİ BİLGİN ENERJİ BİLGİN ENERJİ BURSA TEMİZ ENERJİ ENER HOLDING EKSIM ALENTEK KARESİ ENERJİ KARDEMIR EKSİM HOLDİNG BİLGİN ENERJİ CAN ENERJİ EKSİM HOLDİNG BİLGİN ENERJİ EDINCIK ENERJI TEKTUG ELEKTRIK EKSİM HOLDİNG BOYDAK HOLDING DOST ENERJI EKSİM HOLDİNG EKSİM HOLDİNG AKÇA ENERJİ PROJECT YUNTDAĞ YUNTDAĞ EXT. YUNTDAG EXT. II KORES KORES EXT. BERGAMA SOMA MAZI III BANDIRMA-3 ENEZ SUSURLUK AKRES BOZYAKA TOKAT BANDIRMA EXT. METRISTEPE AMASYA ZEYTINELİ EDINCIK SINCIK SUSURLUK EXTENSION ÇANTA GERES HASANBEYLI SILIVRI ALIAGA LOCATION Izmir, Bergama Izmir, Bergama İzmir,Bergama İzmir, Çeşme İzmir, Çeşme Izmir, Bergama Manisa, Soma Izmir, Bergama Balıkesir, Bandırma Edirne, Saroz Balıkesir, Susurluk Manisa, Akhisar Izmir, Yeni Foça Tokat Balıkesir, Bandırma Bilecik Amasya Izmir, Çeşme Bandırma, Balıkesir Adıyaman Bandırma, Balıkesir Catalca, Istanbul Manisa, Gelenbe Osmaniye Silivri, Istanbul İzmir, Aliaga # WT 17 6 1 6 1 36 36 12 10 6 18 18 5 16 2 16 16 20 12 11 6 19 11 20 18 4 343 WTG TYPE N90/2500 N90/2500 N100/2500 N90/2500 N90/2500 N90/2500 N90/2500 N90/2500 N90/2500 N90/2500 N100 (15) +N90 (3) N90/2500 N100/2500 N100/2500 N90/2500 N100/2500 N100/2500 N100(14)+N90(6) N100/2500 N100/2500 N100/2500 N100/2500 N90/2500 N100/2500 N100/2500 N117/2400 Generation Beta Beta Gamma Beta Gamma Beta Beta Beta Beta Beta Gamma Beta Gamma Gamma Gamma Gamma Gamma Gamma Gamma Gamma Gamma Gamma Gamma Gamma Gamma Gamma WTG Σ MW 42,5 15,0 2,5 15,0 2,5 90,0 90,0 30,0 25,0 15,0 45,0 45,0 12,5 40,0 5,0 40,0 40,0 50 30 27,5 15 47,5 27,5 50 45 9,6 857,1 Contract Type Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Turnkey Clean Selling Clean Selling Clean Selling Turnkey Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling MW UNDER CONSTRUCTION CUSTOMER KARESİ ENERJİ BOREAS ENERJİ ABK CESME ENERJI DOST ENERJİ ERDEM HOLDING BIÇAKÇILAR ELEKTRİK SANCAK ENERJI YENI ENERJI EDİNCİK ENERJİ ERDEM HOLDING KARDEMİR BURSA TEMİZ ENERJİ PROJECT AKRES EXTENSION ENEZ EXTENSION CESME KORES EXTENSION-II ÖDEMİŞ PİTANE URLA YENİHİSAR EDİNCİK EXTENSION BAĞARASI BOZYAKA EXTENSION BANDIRMA-3 EXTENS LOCATION Manisa, Akhisar Edirne, Saroz İzmir,Çeşme İzmir,Çeşme İzmir, Ödemiş İzmir İzmir, Urla Aydın Bandirma, Balikesir Aydın, Söke İzmir, Yeni Foça Bandirma, Balikesir # WT 4 2 6 3 7 2 6 9 11 20 2 7 WTG TYPE N100/2500 N100/3300 N117/3000 N100/2500 N117/3000 N117/2400 N117/3000 N117/2400 N117/2400 N117/2400 N117/2400 N117/2400 Total Units Total Capacity 79 TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 WTG Generation Gamma Delta Delta Gamma Delta Gamma Delta Gamma Gamma Gamma Gamma Gamma Σ MW 10 6,6 18 7,5 21 4,8 18 21,6 26,4 48 4,8 16,8 Contract Type Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling Clean Selling 422 WTG 1060,6 MW 203,5 MW * Cummul. in MW as of end of Q3/2014 5 WITH THE NEW IEC I / II / III TURBINES, NORDEX OFFERS BEST FIT FOR ALL WIND SITES SOP 06/2015 Rotor Ø 117 m N117/2400 100 m N117/3000 N100/2500 N100/3300 90 m +30% AEP Generation GAMMA +30% AEP N131/3000 +25% AEP 131 m Generation DELTA N90/2500 6,0m/s 6,5m/s 7,0m/s 7,5m/s 8,0m/s 8,5m/s 9,0m/s 9,5m/s IEC 3a IEC 2a IEC 1a Light wind Moderate wind Strong wind TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 10,0m/s Wind speed 6 THE NORDEX MULTI-MEGAWATT TURBINES SHARED & PROVEN COMPONENTS OF GAMMA AND DELTA GENERATION Generation Gamma Type N90/2500 IEC 1a Capacity Swept area Generation Delta 6,362 m2 2.5 MW Type N100/2500 IEC 2a 2.5 MW N117/2400 IEC 3a 2.4 MW Capacity Swept area (+23%) 7,823 m2 N100/3300 IEC 1a 3.3 MW 7,823 m2 10,715 m2 N117/3000 IEC 2a 3.0 MW (+37%) 10,715 m2 N131/3000 IEC 3a 3.0 MW (+37%) N117/2400 First installations since 12/2011 (+26%) 13,478 m2 N117/3000 First installations since 8/2013 TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 7 LIGHT WEIGHT DESIGN OF NR58.5M BLADES Rotor Blade NR58.5 – KEY INNOVATION FOR PERFORMANCE INCREASE • Structural & aerodynamic design are based on the experiences of certified inhouse developments of N80/2500 (NR37,5) N90/2500 (NR45) N100/2500 (NR50) • Use of carbon fiber composites (CFRP) in main girder of rotor blade NR58.5 and new NR65,5 is key for turbine load- and weight reduction NR45 NR50 NR58.5 N90 N100 N117 Length 43.8 m 48.8 m 57.3 m Weight 10,300 kg 11,150 kg 10,500 kg Max. Chord 3,220 mm 3,700 mm 3,496 mm WTG Type Swept area Bolt Circle Diameter Weight main girder Materials TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 6.362 m² 7.823 m² 10.715 m² 2,300 mm 2,300 mm 2,300 mm 31% 24% 18% GRP GRP GRP and CFRP 8 NR 58.5 ROTOR BLADE (N117/2400 & N117/3000) confirmed: properties, tests and certifications power curve noise emission power quality according „IEC 61400-12“ (Wind Consult) according „IEC 61400-11“ (GL Garad Hassan, D) according „Technische Richtlinie Teil 3 Rev./Version 22, FGW“ (Wind Consult) Lightning protection Certified according to IEC 61400-24 class I. TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 9 LIGHT WEIGHT DESIGN CONCEPT OF NR58.5 / NR65.5 Key Innovation for significant performance increase • Tested blade designs NR50 / NR58.5 with proven power curves and sound power Blade mass NR50 NR58.5 11.150 kg 10.500 kg Main Girders from carbon fibre composites TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 10 NORDEX TURBINES POWERED BY IN-HOUSE DESIGNED BLADES AEP – Sound power - Efficiency - Time To Market NR50 (N100/2500) NR58.5 (N117/2400) (N117/3000) NR65.5 (N117/3000) Latest stage of evolution: Performance-optimized root section Sound & load-optimized tip section Max. chord moves further towards root to increase yield and limit loads More slender outboard section to optimize load and wake properties Introduction of yield-optimized Nordex flat-back profiles Selection of proven family of profiles with superior sound power properties TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 11 NORDEX TECHNOLOGY, PROVEN IN EXTENSIVE TESTING, PROTOTYPING & MEASUREMENT CAMPAIGNS Nordex in-house test facilities Yaw System Pitch Bearing Rotor Blade Pitch System Dust Vibration Nordex makes comprehensive use of in-house test facilities for important systems Further testing is carried out at external test facilities of system suppliers Tests are complemented by numerous measurement campaigns in the field TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 12 NR 58.5 BLADE PRODUCTION IN TURKEY PROVEN TECHNOLOGY AND STRONG PARTNER FOR LOCAL SUPPLY Leading provider of composite solutions to the transportation & military vehicle markets Global Blade Manufacturer with focus on: › › › › › Solid growth Long term partnerships Major industry players Advanced technology World-class focused factories Track record : > 10 years > 14,000 > 1.3 M m² experience blades supplied to the strictest quality standards global production space USA, Mexico, China, Turkey NR 58.5 BLADE PRODUCTION IN TURKEY PROVEN TECHNOLOGY AND STRONG PARTNER FOR LOCAL SUPPLY TPI Turkey started in March of 2012 as a joint venture with Alke Construction Currently 1000 employees supporting 4 shifts ISO 9001 certified Nordex shop floor approval -> ensuring identical production processes and high quality standards as for Nordex own and all other Nordex rotor blade suppliers 100% support at site during ramp-up phase (SQA and Production personnel) First N117/3000 projects with NR58.5 blades from TPI installed Maximum feed-in tariff [US$ cent/ kWh] Feed-in tariff: Equipment bonus (local content): 1. Blades 2. Generator , Power electronics 3. Turbine Tower 4. All of the mechanical equipment in rotor and nacelle groups (excluding 1 or 2) Total Feed-in tariff (first 5 years to 2020) TÜREK/TWEC 2014 | Nordex Energy GmbH | Istanbul | 11/2014 7,30 0,80 1,00 0,60 1,30 8,70 14 Conclusion: Wide product range, superior technology and high quality standards Strong partner to fulfill local content requirements Competent partner with long track record and high market share Susurluk Wind Farm 21 x N100/2500 R80 Most popular model in Turkey 2013 (navigant research) Thank you very much for your attention Dipl.-Ing. Andreas Beyer Senior Product Manager Nordex Energy GmbH Langenhorner Chaussee 600 22419 Hamburg Email: Web: [email protected] www.nordex-online.com
Benzer belgeler
VMC-1600/2100/3100
1900x900 mm (VMC-1600), 2400x900 mm (VMC-2100), 3400X900 mm (VMC-3100) İŞ MASASI,
2000 kg (VMC-1600), 2500 kg (VMC-2100), 3000 kg (VMC-3100) İŞ PARÇASI YÜK KAPASİTESİ,
1600 / 900 / 850 mm X/Y/Z EKS...
İŞ TECRÜBELERİ ve MÜŞTERİ REFERANSLARI JOB
Periodic Maintenance & Site tests
Erection & Site tests
Periodic Maintenance & Site tests
Tap Changer Overhauling & Tests
Periodic Maintenance & Site tests
Erection & Site tests
Tap Changer Overhau...