Tedaş Bilal Simsek TEDAS_v3
Transkript
Tedaş Bilal Simsek TEDAS_v3
Solarex İstanbul Mevzuatın Değerlendirilmesi 08 Nisan 2016 İstanbul Bilal Şimşek GES Proje Müdürü www.tedas.gov.tr TEDAŞ GENEL MÜDÜRLÜĞÜ 1 Kurulu Güç – 2015 Sonu YAKIT TÜRÜ KURULU GÜCÜ (MW) SANTRAL SAYILARI TERMĠK HĠDROLĠK RÜZGAR JEOTERMAL GÜNEġ TOPLAM 41.903,0 25.867,8 4.503,2 623,9 449 560 122 248,8 362 1.514 73.146,7 21 KURULUġLAR KAMU KURULU GÜÇ KATKI 20.322,6 27,8 ÖZEL SEKTÖR TOPLAM 52.824,2 73.146,7 72,2 100,0 Kaynak: TEİAŞ, www.teias.gov.tr TEDAŞ GENEL MÜDÜRLÜĞÜ 2 Kurulu Gücün Yakıtlara Dağılımı KAYNAKLAR KURULU GÜÇ KATKI MW % KÖMÜR(TaĢ+Ġthal+Linyit+Asfaltit) 15.492,5 20,6 DOĞALGAZ + LNG 21.260,9 29,1 HĠDROLĠK 25.867,8 35,4 RÜZGAR 4.503,2 6,2 YENĠLENEBĠLĠR+ATIK +JEO 986,3 1,3 DĠĞER-1- (Fueloil+Nafta+Motorin) 461,3 1,2 4.325,9 5,9 248,8 0,3 73.146,7 100,0 DĠĞER-2- (Çok Yakıtlı Katı+Sıvı) GÜNEġ TOPLAM Kaynak: TEİAŞ, www.teias.gov.tr TEDAŞ GENEL MÜDÜRLÜĞÜ 3 Üretimin Kaynaklara Dağılımı (2015 Sonu) KAYNAKLAR KÖMÜR (TaĢ+Ġthal+Linyit+Asfaltit) DOĞALGAZ+LNG HĠDROLĠK RÜZGAR YENĠLENEBĠLĠR ATIK + JEO 2015 YILI 73.872,6 98.193,4 66.903,2 11.552,1 4.831,8 DĠĞER-1-(Fueloil+Motorin+Nafta) 4.243,2 DĠĞER-2-(Çok Yakıtlı+Katı+Sıvı) TOPLAM 94,1 KAMU ÖZEL TOPLAM 259.690,3 2015 YILI 55.368,8 204.321,5 259.690,3 BR:GWh KATKI 28,4 37,8 25,8 4,4 1,9 1,6 0,0 100,0 KATKI % 21,3 78,7 100,0 Kaynak: TEİAŞ, www.teias.gov.tr TEDAŞ GENEL MÜDÜRLÜĞÜ 4 TEDAġ Genel Müdürlüğü Türkiye elektrik dağıtım sisteminde serbest piyasa düzenine geçiĢ çalıĢmaları çerçevesinde, dağıtım bölgeleri baz alınarak Kamu mülkiyetindeki elektrik iĢletmelerinin yeniden yapılandırılması suretiyle elektrik dağıtım ve perakende satıĢ hizmetlerinin özelleĢtirilmesine karar verilmiĢ ve TEDAġ 2004 yılında ÖzelleĢtirme Yüksek Kurulu kararı ile özelleĢtirme kapsam ve programına alınmıĢtır. Bu kapsamda Türkiye 21 dağıtım bölgesine ayrılmıĢtır. Dağıtımda ilk özelleĢtirmeler 2009 yılında 3 bölgede yapılmıĢtır. 30.09.2013 tarihi itibarıyla dağıtım tesislerinin mülkiyeti TEDAġ’a ait olmak kaydıyla 21 dağıtım bölgesinin tamamında iĢletme hakkı özel sektöre devredilmiĢ durumdadır. ÖzelleĢtirme sonunda 12.744.750.000 ABD Doları gelir elde edilmiĢtir. ÖzelleĢtirme sonrası TEDAġ Genel Müdürlüğü, Ankara bulunan merkez teĢkilatı ve 21 Dağıtık Verimlidağıtım sektöründe çalıĢmalarını dağıtım bölgesindeDağıtım bulunan 21 Temsilciliği ile elektrik Üretim Tüketim yürütmektedir. TEDAġ’ın Yeni Misyonu; Eğitim, Mühendislik ve DanıĢmanlık, Koordinasyon ve Standardizasyon, Kontrol ve Denetim olarak belirlenmiĢtir. Kamunun TEDAġ’a verdiği birtakım görevleri yerine getirmektedir. TEDAŞ GENEL MÜDÜRLÜĞÜ 5 Dünya’da Yenilenebilir Enerjinin Son On Yılı Tespitler Yenilenebilir enerji tüm beklentileri aşarak büyüme kaydetmiştir. Yenilenebilir enerji teknolojilerinden elektrik üretim kapasitesi önemli ölçüde artmıştır. Pahalı teknoloji yerini daha uygun maliyetlere bırakmıştır. Yenilenebilir enerji kaynaklarını destekleyen politik gelişmeler artış göstermiştir. REN21 Renewables 2015 Global Status Report TEDAŞ GENEL MÜDÜRLÜĞÜ 6 Photovoltaik (PV) – Toplam Kapasite PV TEDAŞ GENEL MÜDÜRLÜĞÜ Son bir yılda 40 GW’lık güç ilavesi oldu. Toplam kapasite 177 GW Dünya çapında tüm PV kapasitesinin %60’ı son üç yılda kuruldu. Asya ülkelerinde yüksek miktarda kurulum gerçekleĢti. 7 Photovoltaik (PV) – Ülkeler Sıralaması PV Kurulum (Ülkeler) TEDAŞ GENEL MÜDÜRLÜĞÜ Çin 2014 yılında en fazla kurulum yapan ülke oldu. Japonya ve Amerika takip eden ülkeler. BeĢ ülke 1 GW kurulum gerçekleĢtirdi. 8 CSP (Concentrating Solar Power) TEDAŞ GENEL MÜDÜRLÜĞÜ 9 Dağıtım ġebekeleri ve Üretim Merkezi santrallerden son kullanıcılara doğru tek yönlü güç akıĢı Bilindiği üzere mevcut dağıtım Ģebekesi tek yönlü güç akıĢı varsayılarak, Talebin karĢılanması, Teknik kalitenin yükseltilmesi, Tedarik sürekliliğinin artırılması, Dağıtım Dağıtık Üretim Ġletim tesisleri ile bütünlük Verimli sağlaması,gibi kriterlere göre Tüketim dizayn ediliyordu. Dağıtım Ģebekeleri üretim santrallarının bağlantısı için değil tüketiciler için planlanıyordu. TEDAŞ GENEL MÜDÜRLÜĞÜ 10 AG ve OG’den Bağlı Santraller Artmakta 380 kV EİH Ototrafolar 380kV ve 154 kV seviyesinden bağlı büyük güçlü, Hidrolik, Kömür, Doğalgaz, Rüzgar Santralleri 154 kV EİH 34,5 kV OG ENH Orta Gerilimden Bağlı/Bağlanacak Santraller (Hidrolik, Rüzgar, Doğalgaz, Güneş, vs) 154/OG TM Küçük güçte dağıtılmış üretim (PV Ağırlıklı) 0,4 kV AG Dağıtım Trafosu Enerji alanında farkında olmasak da sessiz bir devrim gerçekleĢiyor. TEDAŞ GENEL MÜDÜRLÜĞÜ Yeraltı AG Hattı 11 ġebeke Ġhtiyaçları YEK Entegrasyonu (asenkron, senkron ve evirici tabanlı sistemler), Yüklerdeki değiĢim (elektrikli araç, depolama imkanları), Tedarik sürekliliği gereklilikleri (otomatik uzaktan izleme ve kontrol sistemleri), Enerji kalitesi ölçüm sistemleri, Elektrik kesinti sayısı ve süreleri, Akıllı ölçümler (OSOS) Herkesin serbest tüketici olacağı bir piyasa yapısı (Dağıtım ve Perakende AyrıĢımı), Varlık Dağıtık Dağıtım yönetim sistemi,Üretim Verimli Tüketim Akıllı ev, iĢyeri ve rezidans sayısında artıĢ (ısıtma, soğutma, havalandırma ve aydınlatma sistemleri sabit saatlerde değil, ihtiyaca göre anında devreye giren sistemler), TEDAŞ GENEL MÜDÜRLÜĞÜ 12 Aktif ġebekelere GeçiĢ 34 34 Radyal şebeke Tek yönlü güç akışı Aşırı akım koruma röleleri ve sigortalar ile şebeke işletimi, Arıza akımının büyüklüğü ve yönü değişebilir. Fiderler için yanlış açma Koruma cihazları arasındaki koordinasyonun değişmesi Başka sorunlar olabilir. TEDAŞ GENEL MÜDÜRLÜĞÜ 13 Çözüm: Akıllı ġebeke? Talep Yönetimi Akıllı Sayaçlar YEK Entegrasyonu Saha Uygulamaları (Varlık Yönetimi, CBS vb.) SMART GRID Dağıtım Arıza Yönetim Sistemi TEDAŞ GENEL MÜDÜRLÜĞÜ Dağıtık Üretim Otomasyon (SCADA, DMS) Verimli Tüketim Yük Profil Değişimleri Güç Kalitesi ve Planlama 14 Bağlantı Noktası OG ġebeke OG ġebeke Bağlantı Noktası TEDAġ Trafo MüĢteri Trafo AG ġebeke Bağlantı Noktası AG Tüketiciler Dahili Yükler G G Üretim tesisi şebekeye hangi gerilim seviyesinden bağlı ise kurallar ona göre değişir. Şebeke bağlantı noktasının neresi olduğu çok önemlidir. TEDAŞ GENEL MÜDÜRLÜĞÜ 15 GES ve Güç Kalitesi Konvansiyonel ve modern dağıtım sistemi yapıları Dağıtım Sistemi Pasif (Konvansiyonel) Tüketim Tesisi Var Dağıtık Enerji Santrali Yok Güç Kalitesi 𝑓 𝑇𝑢𝑘𝑒𝑡𝑖𝑚 Aktif (Modern) Var Var 𝑓 𝑇𝑢𝑘𝑒𝑡𝑖𝑚, 𝑈𝑟𝑒𝑡𝑖𝑚 Aktif bir dağıtım sisteminde güç kalitesi sorumluluk matrisi Parametre TTB V Fliker DC Akım Enjeksiyonu İlgili Elektriksel Büyüklük Toplam Talep (Akım) Bozuşması (Harmonik) Gerilim Düşümü/Yükselmesi Gerilim Salınımı (f < 50 Hz) DC Akım (Amper veya % Inom) Sorumlu GES GES GES GES Pasif bir dağıtım sistemi için tanımlanan teknik kalite sorumluluk matrisi Güç Kalitesi Parametresi f V V-/V+ THB TTB Fliker İlgili Elektriksel Büyüklük Frekans Gerilim Düşümü Gerilim Dengesizliği Gerilim Bozuşması Talep (Akım) Bozuşması Gerilim Salınımı (f < 50 Hz) Sorumlu TEİAŞ Dağıtım Şirketi Dağıtım Şirketi Dağıtım Şirketi Tüketici Tüketici Mevzuat “Elektrik piyasasında lisanssız elektrik üretimine ilişkin yönetmeliğin uygulanmasına dair tebliğ” ve “Elektrik piyasasında dağıtım sisteminde sunulan elektrik enerjisinin tedarik sürekliliği, ticari ve teknik kalitesi hakkında yönetmelik” TEDAŞ GENEL MÜDÜRLÜĞÜ 16 GES ve Güç Kalitesi - Akım harmonik bozuşması sorumluluğu kullanıcıya ve ilgili fidere bağlı GES sahibine, - Gerilim Düşümü/Yükselmesi (V) sürekli çalışmada dağıtım şirketine, devreye girip çıkma nedeniyle ise ilgili fidere bağlı GES sahibine, - Düşük frekanslı gerilim salınımı (f < 50 Hz) flicker sorumluluğu kullanıcıya ve ilgili fidere bağlı GES sahibine, - DC akım enjeksiyonu ilgili fidere bağlı GES sahibine ve tüketicilere aittir. - Aynı fidere birden fazla GES’in bağlı olması durumunda herbir bağlantı noktasında ölçüm yapılarak güç kalitesi bozulmasının kaynağı tespit edilebilir. Ölçümler yapılırken fidere bağlı diğer santrallerin kapalı olması gerekir. TEDAŞ GENEL MÜDÜRLÜĞÜ 17 Uyulması Gereken Temel Standartlar Santral Kurulu Gücü Standart Adı < 16 A TS EN 50438 > 16 A ve AG’den Bağlı TSE K 191 > 16 A ve YG’den Bağlı TSE K 192 TSE K 191 Faz akımı 16 A’den büyük olan jeneratörler için bağlantı kuralları Dağıtım sistemine ag seviyesinden bağlanan TSE K 192 Faz akımı 16 a’den büyük olan jeneratörler için bağlantı kuralları Dağıtım sistemine og seviyesinden bağlanan TEDAŞ GENEL MÜDÜRLÜĞÜ 18 Akım Harmonikleri ITEPE Toplam IRMS Temel Bileşen 50 Hz Temel Bileşen 50 Hz IH1 + 3. Harmonik 3. Harmonik 150 Hz IH3 5. Harmonik 250 Hz IH5 7. Harmonik 250 Hz IH7 9. Harmonik 250 Hz IH9 Bozuk dalga şeklinin harmoniklere ayrıştırılması = Harmoniksel bozuk dalga şekli Üçüncü harmoniğin akım dalga şekline bozucu etkisi Faz akımı ≤ 16 A olan ve AG seviyesinden bağlanan tesisler için akım harmonikleri Harmonik No 2 3 5 7 9 11 Sınır 1,08 2,3 1,14 0,77 0,4 0,33 ª % 50 veya en yüksek ve en düşük arasında orta noktaya yakın diğer beyan edilen değerler. 13 0,21 15 ≤ n ≤ 39 0,15 ª (15/n) Türkiye’de GES’lerin uymakla yükümlü olduğu akım harmonik sınır değerleri verilmiştir. Bu değerler BS EN 50438 ve IEC 61000-3-2 ile uyumludur. TEDAŞ GENEL MÜDÜRLÜĞÜ 19 Gerilim Dalgalanması (V) Türkiye’de uygulanan gerilim düşümü/yükselmesi sınır değerleri (IEC 61000-3-3) Maksimum Değer (%) GES Devreye Girerken ±3.3 GES Devreden Çıkarken ±3.3 GES devreye girerken oluşturabileceği en büyük gerilim yükselmesi V (pu) GES devreden çıkarken oluşturabileceği en büyük gerilim düşümü V (pu) Dağıtım Şirketi Üst Sınır 1.1 V= + % 10 VGES= + % 3.3 VNOM 1.0 Dağıtım Şirketi Üst Sınır 1.1 VNOM 1.0 0.9 Dağıtım Şirketi Alt Sınır GES OFF tON GES ON zaman V= - % 10 V= + % 10 VGES= - % 3.3 0.9 Dağıtım Şirketi Alt Sınır GES ON tOFF GES OFF V= - % 10 zaman Gerilimin kabul edilebilir sınırlar dışına çıkmaması için bağlanacak GES’lerin en kötü durum analizleri yapılarak özellikle uzun ve kırsal hatlarda gerilim dalgalanması değerlerine bakılmalıdır. En kötü durum analizleri minimum üretim-maksimum yük ve maksimum üretimminimum yük koşullarını içermelidir. TEDAŞ GENEL MÜDÜRLÜĞÜ 20 KırpıĢma (Flicker) Türkiye’de uygulanan flicker sınır değerleri (IEC 61000-3-3) GES (IEC 61000-3-3) Tüketici (IEC 61000-2-2) PST ≤ 1.00 ≤ 1.00 PLT ≤ 0.65 ≤ 0.80 Kırpışma şiddeti zamansal olarak iki farklı parametre ile değerlendirilir: PST: Kısa dönem kırpışma şiddeti. 10 dakikalık ölçüm ile belirlenir. PLT: Uzun dönem kırpışma şiddeti. TEDAŞ GENEL MÜDÜRLÜĞÜ 21 DC Akım Enjeksiyonu Dağıtım sistemine alçak gerilim seviyesinden bağlanan PV GES’lerin eviricilerinin sisteme DC akım verme olasılığı vardır. PV sistemlerde transformatör kullanımı açısından 3 tip evirici vardır: - Yüksek frekans transformatörlü, Alçak frekans (50 Hz) transformatörlü, Transformatörsüz Standard İzin verilen maksimum DC akım (Transformatörsüz) İzin verilen maksimum DC akım (Transformatörsüz Türkiye IEEE 929-2000 Evirici nominal akımının % 0.5’i Evirici nominal akımının % 0.5’i ABD IEEE 929-2000 Evirici nominal akımının % 0.5’i Evirici nominal akımının % 0.5’i AS 4777.2 5 mA 5 mA Almanya DIN VDE 126 - 1000 mA İspanya RD 1663/2000 - - Japonya Tech. Guidline for Grid Interconnection Evirici nominal akımının % 1’i Evirici nominal akımının % 1’i İngiltere ER G83/1 - 5 mA Ülke Avusturalya TEDAŞ GENEL MÜDÜRLÜĞÜ 22 GES Evirici Standartları Güvenlik Standartları Standard No Standard Adı IEC 62109-1 (EN 62109-1) Safety of power converters for use in photovoltaic power systems - Part 1: General requirements IEC 62103 (EN 50178) Electronic equipment for use in power installations AS 3100 Approval and test specification - General requirements for electrical equipment Inverters, Converters, Controllers and Interconnection System Equipment for Use With Distributed Energy Resources Standard for Interconnecting Distributed Resources with Electric Power Systems UL 1741 IEEE 1547 Etkilenmezlik (immunity) standartları Standard No IEC 61000-6-1 (EN 61000-6-1) IEC 61000-6-2 (EN 61000-6-2) Standard Adı Electromagnetic compatibility (EMC) - Part 6-1: Generic standards - Immunity for residential, commercial and light-industrial environments Electromagnetic compatibility (EMC) - Part 6-2: Generic standards - Immunity for industrial environments Emisyon standartları Standard No IEC 61000-6-3 (EN 61000-6-3) IEC 61000-6-4 (EN 61000-6-4) EN 55022/CISPR 22 TEDAŞ GENEL MÜDÜRLÜĞÜ Standard Adı Electromagnetic compatibility (EMC) – Part 6-3: Generic standards – Emission standard for residential, commercial and light-industrial environments Electromagnetic compatibility (EMC) – Part 6-4: Generic standards – Emission standard for industrial environments Information Technology Equipment - Radio disturbance characteristics - Limits and methods of measurement 23 GES Evirici Standartları Elektromanyetik uyumluluk standartları- Harmonikler Standard No IEC 61000-3-2 (EN 61000-3-2) IEC 61000-3-12 (EN 61000-3-12) IEC 61727 AS 4777 Standard Adı Electromagnetic compatibility (EMC) – Part 3-2: Limits – Limits for harmonic current emissions (equipment input current ≤ 16 A per phase) Electromagnetic compatibility (EMC) - Part 3-12: Limits - Limits for harmonic currents produced by equipment connected to public low-voltage systems with input current >16 A and ≤ 75 A per phase Photovoltaic (PV) systems - Characteristics of the utility interface Grid Connections of Energy Systems via Inverters Inverters, Converters, Controllers and Interconnection System Equipment for Use With Distributed Energy Resources Standard for Interconnecting Distributed Resources with Electric Power Systems UL 1741 IEEE 1547 EMC uyumluluk standartları- Voltaj Salınımı ve Kırpışma Standard No IEC 61000-3-3 (EN 61000-3-3) IEC 61000-3-11 (EN 61000-3-11) TEDAŞ GENEL MÜDÜRLÜĞÜ Standard Adı Electromagnetic compatibility (EMC) – Part 3-3: Limits – Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current ≤ 16 A per phase and not subject to conditional connection Electromagnetic compatibility (EMC) - Part 3-11: Limits - Limitation of voltage changes, voltage fluctuations and flicker in public low-voltage supply systems - Equipment with rated current ≤ 75 A and subject to conditional connection 24 GES Raporu (Lisanssız) Proje Onayı Yapılan Başvurular Toplam Başvurular TESİS TİPİ BIYOGAZ Sayı (Adet) Kurulu Güç (kW) Tesis Geçici Kabul Yapılan Başvurular Onay İşlemi Tamamlanan Başvurular Sayı (Adet) Kurulu Güç (kW) Kabul İşlemi Tamamlanan Sayı (Adet) Kabul Aşamasında Olan Kurulu Güç (kW) Sayı (Adet) Kurulu Güç (kW) 32 31.651 24 25.882 11 17.703 1 1.204 GES 6.194 5.213.727 583 2.884.249 501 366.449 155 136.059 RES 247 193.668 14 100.278 7 7.970 6 1.038 TRI/KOJEN 63 180.087 22 111.640 16 42.043 3 22.576 6.536 5.619.133 643 3.122.049 535 434.165 165 160.877 TOPLAM TEDAŞ GENEL MÜDÜRLÜĞÜ 25 GES Proje Durumları TEDAŞ GENEL MÜDÜRLÜĞÜ 26 Dağıtım ġirketlerine Göre Proje Sayısı TEDAŞ GENEL MÜDÜRLÜĞÜ 27 Ġllere Göre Proje Sayısı TEDAŞ GENEL MÜDÜRLÜĞÜ 28 Lisanssız Elektrik Üretimi (Adımlar) Başvuru Yapılması ve Bağlantı Anlaşmasına Çağrı Mektubu Alınması • 1.AŞAMA Proje Onaylanması ve Bağlantı Anlaşması Yapılması • 2.AŞAMA Geçici Kabul ve Sistem Kullanım Anlaşması Yapılması TEDAŞ GENEL MÜDÜRLÜĞÜ • 3. AŞAMA 29 Proje Süreci Dağıtım Şirketi ile Bağlantı Anlaşması İmzalanması Geçici Kabul TEDAŞ ONAY TEDAŞ Başvuru Çağrı Mektubu Tebliğ Tarihi Proje tasarım, yerel onayların alınması 90 gün TEDAŞ GENEL MÜDÜRLÜĞÜ TEDAġ Onayı Bağlantı AnlaĢması Tesisin Yapımı 90 gün 30 gün AG – 1 yıl OG – 2 yıl 30 ÇalıĢmalarımız - 1 Genel Müdürlüğümüze onay için sunulan projeler, “LUY Proje Takip Programı” vasıtasıyla geliş tarihine göre sıralanmakta ve iş durumu uygun olan personelimize (elektrik mühendisi) yönlendirilmektedir. Söz konusu projelerin öncelikle mevzuat çerçevesinde temel belgelerin ön kontrolü yapılmaktadır. Belgelerde eksiklik olması halinde projeler ilgili firmaya iade edilmekte, eksiklik bulunmaması durumunda, proje paftaları, hesapları ENH projeleri kontrol edilmektedir. Bu safhada eksiklik tespit edilmesi sonucunda proje dosyasındaki eksiklikler bir yazı ile ilgili firmaya verilmekte ve eksiklikler süresi içinde tamamlandıktan sonra proje onayı yapılmaktadır. Genel Müdürlüğümüze onay için gelen projeler sadece üretim santralleri olmayıp, bu projeler kapsamında tesis edilecek olan AG/OG bağlantı hatları ENH projeleri de incelenmektedir. Bu projelerin incelenmesi de ayrı bir uzmanlık konusu olup, Genel Müdürlüğümüzdeki bu konuda tecrübeli ve dağıtım tesisi projeleri alanında yetişmiş personel tarafından incelenmektedir. TEDAŞ GENEL MÜDÜRLÜĞÜ 31 ÇalıĢmalarımız - 2 Hem proje hem de kabul aşamasındaki olumsuzlukların önüne geçilebilmesi ve yaşanan sürecin kısaltılarak işlemlerin hız kazanması bakımından ilgili personelin takviyesi, personel eğitimi, belli bir güce kadar projelerin tipleştirilmesi, proje ve kabul dosyalarında gerekli evraklar, teknik dokümanlar ve bilgilerin TEDAŞ’ın Web sayfasında paylaşılarak yatırımcılar ile projecilerin önceden bilgi sahibi olmasının sağlanması için Genel Müdürlüğümüzce gerekli çalışmalar yapılmakta ve yapılmaya devam edecektir. Proje hazırlama sürecinden önce yaşanan olumsuzluklara ilave olarak, lisanssız üretim tesisi kurulması sürecinde proje hazırlayan firmaların/kişilerin de oldukça yetersiz olduğu bugüne kadar Genel Müdürlüğümüze ulaştırılan projelerden görülmektedir. Projelerin, Dağıtım Şirketinin verdiği Bağlantı Anlaşmasına Çağrı Mektubunun tebliğ tarihinden itibaren 90 gün içinde Genel Müdürlüğümüze verilmesi gerekmekteyken, genellikle bu sürenin sonuna doğru 80-85 inci gününde projeler teslim edilmekte, hatta proje dosyasında gerekli hiçbir belge olmaksızın son günde sadece bir dilekçe ile başvuru bile yapılmaktadır. Bu konudaki eksikliği gidermek için Teşekkülümüz elemanlarınca çeşitli ortamlarda eğitimler verilmiş, hem piyasadaki projeci, yatırımcı ve Dağıtım Şirketlerinin elemanları hem de TEDAŞ koordinatörlüklerindeki mühendisler bilgilendirilmiştir. Önümüzdeki süreçte de eğitim çalışmalarına devam edilecektir. Ayrıca proje incelenmesi aşamasında Genel Müdürlüğümüze gelen projeci mühendislere de elden gelen her türlü yardım yapılmış, bir kısım projeci proje hazırlama konusundaki eksikliklerini Genel Müdürlüğümüzdeki incelemeler sırasında gidermiştir. TEDAŞ GENEL MÜDÜRLÜĞÜ 32 ÇalıĢmalarımız - 3 Proje inceleme ve onay sürecini hızlandırmak amacıyla TEDAġ Genel Müdürlüğünde hafta içi ve hafta sonu mesai yapılmıĢtır. 2015 yılının Haziran, Temmuz ve Ağustos aylarında hafta içi akĢam 20.00’ye kadar ve hafta sonları 09.00 ila 17.00 saatleri arası gayretli çalıĢmalar ile proje onayları hızlandırılmıĢtır. Bu fazla mesai sonucunda yaklaĢık 400 GES proje onayı yapılmıĢtır. Ayrıca sahada kabuller gerçekleĢtirilmiĢ ve çok yoğun bir mesai ile santraller devreye alınmıĢ ve alınmaya da devam edilmektedir. Sahada elde edilen tecrübe ve talepler doğrultusunda dağıtım Ģirketlerince; bir parsele ait 1 MW' tan küçük üretim santralleri için yapılacak baĢvurularda ve aynı parsel içerisinde birden fazla farklı gerçek ve tüzel kiĢi için yapılacak baĢvurularda hiçbir kurum veya kuruluĢtan ÇED Raporu yada ÇED Raporuna gerek olmadığına dair herhangi bir belge talep edilmemesi konusunda çalıĢma yapılarak sektörün önü açılmasına katkı sağlanmıĢtır. Ayrıca imar uygulamaları konusunda çalıĢmalar yapılarak sorunun çözümünde katkı sağlanmıĢtır. GES projelerinde statik projelerin onayı konusunda alternatif çözüm olarak üniversite onayları da devreye sokularak proje onay süreci hızlandırılmıĢtır. Sektörün bütün taraflara ile toplantılar yapılarak sorunlar tespit edilmiĢ ve çözümüne yönelik somut adımlar gerçekleĢtirilmiĢtir. Dağıtım ġirketleri ve OSB çalıĢanların bilgilendirilmesi ve eğitilmesi amacıyla etkinliklere katılım sağlanmıĢtır. Küçük güçteki santraller için baĢvuru, izin, proje onay ve kabul iĢlemlerinin kolaylaĢtırılması için Tip ġartname çalıĢmaları yapılmıĢtır. TEDAŞ GENEL MÜDÜRLÜĞÜ 33 Hatalı Uygulamalar TEDAŞ GENEL MÜDÜRLÜĞÜ 34 Hatalı Uygulamalar TEDAŞ GENEL MÜDÜRLÜĞÜ 35 Hatalı Uygulamalar TEDAŞ GENEL MÜDÜRLÜĞÜ 36 Hatalı Uygulamalar Özellikle Avrupa’daki uygulamalar incelendiğinde Almanya, Ġtalya ve Ġspanya gibi ülkelerde ilk yıllarda çok hatalı tesis kurulmuĢ ve birçok olumsuzlukla karĢılaĢtırılmıĢtır. Ancak TEDAġ Genel Müdürlüğünün proje inceleme aĢamasında baĢlamak üzere gösterdiği hassasiyet kabul aĢamasında da sağlanmıĢ ve yaklaĢık 366 MW’lık güç iĢletmeye alınmasında tek bir sorun dahi yaĢanmamıĢtır. Proje onay ve kabul iĢlemleri için standart ve disiplin sağlanmıĢtır. TEDAŞ GENEL MÜDÜRLÜĞÜ 37 Sonuçlar YEK ve enerji verimliliği konusunda bilimsel, kurumsal ve teknolojik kapasitenin artırılması için, TEDAŞ Genel Müdürlüğü olarak dünyadaki teknolojik gelişmeler takip edilmekte, fuarlara katılım sağlanmakta ve uygulamalar yerinde incelenmektedir. Ayrıca üniversite işbirliği ve yurtdışı kurumlar ile ortak projeler geliştirilmektedir. Nitelikli insan gücü yetiştirilmesi amacıyla, teknisyen ve mühendis düzeyinde olmak üzere eğitim konusunda projeler hazırlanmakta ve eğitim çalışmaları yapılmaktadır. Ülkemizde son zamanlarda sıkça gündeme gelen lisanssız elektrik üretiminden kaynaklı kapasitenin hızla artarak enerji sektörüne katkısı küçümsenemez bir gerçektir. Gerek yatırımcıların gerek dağıtım bölgelerinin gerekse TEDAŞ’ın yoğun çalışmaları ve iyileştirmeleriyle lisanssız kurulu gücün toplam kurulu güçteki payı hızla artmaktadır. Sürekli devam eden iyileştirmeler ve bilinçli yatırımcıların artmasıyla birlikte bu süreç daha da kolaylaşacaktır. Yakın bir zamanda tüketicilerin aynı zamanda potansiyel bir üretici olduğu hepimizin kabul edeceği bir gerçek olacaktır. TEDAŞ GENEL MÜDÜRLÜĞÜ 38 Proje Onay Ekibimiz MEHMET MUTLU DAİRE BAŞKANI BİLAL ŞİMŞEK MÜDÜR(G) ÇETİN ÇELİK MÜDÜR YRD (G) [email protected] İBRAHİM ERSOY MÜDÜR YRD (G) İ[email protected] LEYLA ARSLAN E.MÜHENDİS CEM EDİZ BAŞ MÜHENDİS ( E. MÜH) CİHANGİR TOZKOPARAN E.MÜHENDİS [email protected] AYŞEGÜL ETCİ E.MÜHENDİS [email protected] MURAT YILMAZ E.MÜHENDİS [email protected] GÜNER KOÇAK E.MÜHENDİS [email protected] MURAT GÜÇLÜ BAŞ MÜHENDİS ( E. MÜH) [email protected] YÜKSEL BAYKAN E.MÜHENDİS [email protected] VOLKAN TAN E.MÜHENDİS [email protected] FIRAT ÖNCİN E.ÖĞRT. [email protected] SELMA EROĞLU E.MÜHENDİS [email protected] GÖKAY ARSLANOĞLU E.MÜHENDİS [email protected] SAVAŞ TAN E.ÖĞRT. TEDAŞ GENEL MÜDÜRLÜĞÜ [email protected] [email protected] [email protected] [email protected] Savaş[email protected] 39 Teşekkürler! TEDAŞ GENEL MÜDÜRLÜĞÜ © Bilal ġĠMġEK / Tüm Hakları Saklıdır. 40
Benzer belgeler
*BENF4LAZN* Proje Ve Tesis Dairesi Başkanlığı (Proje
projelerin öncelikle mevzuat çerçevesinde temel belgelerin ön kontrolü
yapılmaktadır. Belgelerde eksiklik olması halinde projeler ilgili firmaya
iade edilmekte, eksiklik bulunmaması durumunda, proj...
TEDAŞ Genel Müdürlüğü
karar verilmiş ve TEDAŞ 2004 yılında Özelleştirme Yüksek Kurulu kararı ile özelleştirme
kapsam ve programına alınmıştır.
Bu kapsamda Türkiye 21 dağıtım bölgesine ayrılmıştır. Dağıtımda ilk özelle...
Slayt 1 - SolarBaba
Düşük frekanslı gerilim salınımı (f < 50 Hz) flicker sorumluluğu kullanıcıya ve
ilgili fidere bağlı GES sahibine,