COMPANY PROFILE
Transkript
COMPANY PROFILE
COMPANY PROFILE ACD ACD Insaat Tes. Tar. Hay. San. Ve Tic. Ltd. Sti. Ceyhun Atuf Kansu Cad. No:137/4-5 Balgat – Cankaya / ANKARA-TURKEY Tel: +90 312 473 41 81/82 Fax: +90 312 473 41 83 http://www.acd-insaat.com ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com BRIEFLY ABOUT ACD ACD is an international construction company established in 2002. The company specialized in oil pipeline construction, gas pipeline construction, water pipeline construction, pump station & compressor station construction, natural gas RMS station construction, oil field development projects, process piping works, hot-tap and stopple operations. ACD successfully performed numerous projects for the last ten years. These projects have been performed in four different countries and the list includes 17 pipeline construction projects, 7 pump station & 2 compressor station construction projects, 3 oil field development projects, 15 RMS-A station construction projects, 4 industrial & plant piping, 2 power station piping projects and more than 50 hot-tap & stopple operations. The company has a professional team of experts specialized in their fields and has its own construction equipment to perform pipeline and piping works. The head office is located in Ankara and the warehouse & equipment park is located in Haymana. The purpose of ACD Construction Company is to complete the commitments it undertakes, and further stand reliable and trustworthy in this competitive market. In order to succeed these core values and missions, ACD Construction Company is determined to become an indispensable organization by creating additional values for its clients. Company Profile 2 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com TOOLS & EQUIPMENT Units Capacity / Model Brand Pipelayer (Sideboom) 1 1983 / TD 25 CS 65 tons International Pipelayer (Sideboom) 2 1992 / D7 45 tons Caterpillar Pipelayer (Sideboom) 5 1974 - 1986 / D6 30 – 36 tons Caterpillar Pipelayer (Sideboom) 1 1987 / D65 A 20 tons Komatsu Pipelayer (Sideboom) 1 1990 / D4 12 tons Caterpillar Hydraulic Pipe Bending Machine 1 22” – 36” 1998 CRC-Evans Hydraulic Pipe Bending Machine 1 4” – 20” 1990 CRC-Evans Pneumatic Internal Clamp 8 12”-14”-16”-24” 28”-30”-48”-80” Vietz / CRC Mobile Crane 1 1975 / LT1030 30 tons Liebherr Boom truck (Hi-up) 1 25 Tons 2008 Hidrokon / BMC Boom truck (Hi-up) 1 20 Tons 2005 Kocoglu / Man Paywelder (4 welding sets) 2 2003 Vietz – Arcotrac 4 Paywelder (4 welding sets) 3 2008 2009 Volvo Excavator 2 2012 / HMK300 30 tons Hidromek Excavator 1 2005 / D 320L 20 tons Caterpillar Excavator 1 2011 30 tons JCB Tools and Equipment Company Profile 3 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com Tools and Equipment Units Capacity / Model 2012 /HMK200W 20 tons D7R XR 2003 938 H 2012 140G 1988 Caterpillar Brand Wheel Excavator 1 Hidromek Bulldozer 1 Loader 1 Grader 1 Dump Truck 1 2008 / 30 tons BMC Fuel Tanker 1 2010 / 7 tons Iveco Tractor 4x4 2 2008 Tümosan Welding Machine (Redresor) 20 WTU 455 RKM 450 / 650 Fronius (Gedik) Welding Machine (Redresor) 16 405 SA Lincoln Diesel Generator 2 72 KVA Perkins (Genpower) Diesel Generator 4 GVP 142 142 kVA Volvo ABB (Genpower) Hydrotest Filling Pump 1 12 bar 500 m3/h Tempo Hydrotest Pressurizing Pump 1 160 bar 16 m3/h HPP Italy Total Station 2 2010 Leica Holiday Detector 4 20 KVA SPY External Clamp 12 Multiple sizes - Jeep 4x4 3 2012 2009 2011 Mitsubishi Nissan Jeep Pick-Up 4x4 6 2012 2010 2003 Mitsubishi Nissan Ford Car 5 2012 Hyundai Minibus 2 2005 Ford Caterpillar Caterpillar Company Profile 4 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com TOOLS & EQUIPMENT Company Profile 5 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com TOOLS & EQUIPMENT Company Profile 6 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com REFERENCES No 1 Project Description Tuzgölü Fresh Water Pipeline & Natural Gas Pipeline Construction Project / Turkey 24” – 28” - 30” – 36” Total 150 km Pipeline Construction, Line Valve, Drain Valve and Relief Valve Chambers Construction (total 267 each) 2 Erbil - Kalak - Dohuk Natural Gas Pipeline Construction Project / Iraq 24” and 36” Total 60 km Pipeline Construction 3 Kırsehir / Mucur Compressor Station Construction Project / Turkey 4 Batı Raman & Raman Oil Field Development Project / Turkey 90 km Flowline (Steel, PE & Stainless) Construction, 12 each Manifold Construction 5 6 Pendik Pig Station 30” Valve Replacement Project / Turkey 30” Hottap / Stopple and Valve Replacement Yeni Elektrik 850 MWe CCGT Natural Gas Feed Line Construction / Turkey 24” x 20” Hottap and Take-Off Valve Group Construction 7 Extending Water Pipeline form Sherkozh Storage to Suli Quarter / Iraq 48” – 17 km, 24” – 3 km Pipeline & 3 each Pump Station Construction 8 Oguz - Gabala - Baku Water Pipeline Project / Azerbaijan 80” - 47 km Pipeline Construction, 3 each Flow and Pressure Control Chamber Construction 9 Sayda Province Natural Gas Pipeline Project / Algeria 8” - 25 km Pipeline Construction 10 Kesikkopru Dam to Ankara Ivedik Treatment Plant Pipeline Project / Turkey 64” - 30 km Pipeline Construction, Pump Station Construction 11 12 Baku – Tbilisi – Ceyhan (BTC) Crude Oil Pipe Line / Azerbaijan 42” - 430 km Pipeline Construction, 19 Block Valve Station, 2 Pumping Station, 1 Pigging Station, 2 Check Valve Station Construction Cankırı – Gerede Natural Gas Pipeline Project / Turkey 24” - 33 km Pipeline Construction Company Profile 7 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com No Project Description 13 Ankara - Kazan Water Pipeline Project / Turkey 28” – 36” - 28 km Pipeline Construction 14 Ingaz High Pressure Natural Gas Pipeline / Turkey 8” – 2,5 km Pipeline Construction 15 Teksem Factory Natural Gas Conversion Works / Turkey 16 Turkey – Greece Natural Gas Pipeline Project / Turkey/Greece 36” – Pipeline Critical Welding Works and Hot-taps 17 Aliaga Pigging Station - RMS Station Natural Gas Pipeline / Turkey 20” - 8 km Pipeline Construction 18 Yozgat Sugar Factory RMS Station / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction 19 PETKIM - 40 MW Gas Turbines and 14” Natural Gas Pipeline Construction Project 20 Yumurtatepe - Seckoy Natural Gas Pipeline Project / Turkey 24” - 13 km Pipeline Construction 21 CS-5 Eskisehir Natural Gas Compressor Station Cyclone Filter Installation 22 Iran Natural Gas Pipeline Project / Turkey/Iran Gas Distribution to Ardahan City and 48”x12” Hot -Tap Works 23 Bursa Natural Gas Pipeline Project / Turkey Botas Displacement Works for 36” - 250 m 24 Botas Karacabey RMS Station Project / Turkey 50.000 Nm3/h Natural Gas RMS-A Station Construction 25 Botas M.K. Pasa RMS Station Project / Turkey 60.000 Nm3/h Natural Gas RMS-A Station Construction 26 Botas Malatya OIZ RMS Station Project / Turkey 15.000 Nm3/h Natural Gas RMS-A Station Construction 27 Botas Kahramanmaras OIZ RMS Station Project / Turkey 75.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 8 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com No Project Description 28 Botas Payas OIZ RMS Station Project / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction 29 Botas Iskenderun OIZ RMS Station Project / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction 30 Natural Gas Utility Pipeline Infrastructure Works for Kocaeli – Gebze IVth Istanbul Machinery and Manufacturing Organized Industrial Zone 31 Izmit - Kosekoy Bogging Area Displacement Works / Turkey Botas Displacement Works 16” - 1250 m 32 Botas Mersin OIZ RMS Station Project / Turkey 20.000 Nm3/h Natural Gas RMS-A Station Construction 33 Botas Adana OIZ RMS Station Project / Turkey 75.000 Nm3/h Natural Gas RMS-A Station Construction 34 35 Botas Baser Kimya OIZ RMS Station Project / Turkey 2.000 Nm3/h Natural Gas RMS-A Station Construction Botas Gaziantep OIZ RMS Station Project / Turkey 150.000 Nm3/h Natural Gas RMS-A Station Construction 36 Botas Adana West RMS Station Project / Turkey 50.000 Nm3/h Natural Gas RMS-A Station Construction 37 Botas Adana East RMS Station Project / Turkey 40.000 Nm3/h Natural Gas RMS-A Station Construction 38 Botas Mersin City OIZ RMS Station Project / Turkey 150.000 Nm3/h Natural Gas RMS-A Station Construction 39 Ingaz Inegol RMS Station Project / Turkey 50.000 Nm3/h Natural Gas RMS-A Station Construction 40 41 42 EGO Revision Works / Turkey Revision of 18 each Natural Gas RMS-A Station and Integration of Scada System Turkuaz Ceramic Factory Natural Gas Conversion Project / Turkey Blue Stream Pipeline Project (EGO – Ankara) / Turkey 48” x 36” Hot-Tap Works Company Profile 9 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com No 43 44 45 46 Project Description Aksaray - Mercedes Truck Factory Natural Gas Conversion Project / Turkey Anadolu Textile Factory Natural Gas Conversion Project / Turkey TPIC (Turkish Petroleum Company) / Emity Oil - Natural Gas Distribution System / Turkey Construction of Pipelines from Natural Gas Wells to the Factories at Corlu and Cerkezkoy Area, 4’’-6’’-8’’-10’’, 40 km Pipeline Construction EGO Natural Gas Distribution System, Ankara / Turkey 36”-24”-18’’, 36 km Pipeline Construction, Compressor Station Construction Company Profile 10 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com ACD Hot-Tap & Line Stop Works Reference List / 2009 - 2012 No Owner Client Operator Company Date Location BOTAŞ Türkerler İnşaat TDW October 2012 Kırşehir TDW October 2012 Kırşehir 1 Work Description 40"x36"x36"x40" Line Stop / Replacement 36" By-pass line (120 meters) 2 40"x36"x36"x40" Split Body Tee / Hot-Tapping BOTAŞ Türkerler İnşaat 3 16"x16"x16"x16" Split Body Tee / Hot-Tapping İZMİRGAZ 4 30"x30"x30" Hot-tap Tee / Line Stop BOTAŞ Kolin İnşaat BOTAŞ İstanbul İşletme Müdürlüğü 5 22"x22"x22"x22" Split Body Tee / Line Stop ESGAZ Ulusoy İnşaat 6 16"x16"x16" Hot-Tap Tee / Line Stop ARMAGAZ Mekaser Tecpesa August 2011 Yalova 7 24"x20"x20"x24" Split Body Tee / Hot-Tapping BOTAŞ Ekon / Ansaldo Energia Furmanite/Ipsco October 2011 Kocaeli 8 48"x24"x24"x48" Split Body Tee / Hot-Tapping BOTAŞ Fernas / OMV TDW November 2011 Samsun 9 16"x10"x10"x16" Split Body Tee / Hot-Tapping İZMİRGAZ Kolin İnşaat 36"x24"x20"x36" Split Body Tee / 10 Hot-Tapping BURSAGAZ Arsan İnşaat Furmanite/Ipsco July 2012 İzmir Furmanite/Ipsco May 2012 İstanbul Furmanite/Ipsco April 2012 Eskişehir Furmanite/Ipsco July 2011 İzmir Tecpesa February 2011 Bursa 16"x16"x16"x16" Split Body Tee / 11 Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco December 2010 Antalya 12"x12"x12"x12" Split Body Tee / 12 Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco September 2009 Adana 18"x18"x18"x18" Split Body Tee / 13 Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco September 2009 Adana 24"x16"x16"x24" Split Body Tee / 14 Hot-Tapping BOTAŞ Aksa Gaz Furmanite/Ipsco September 2009 Osmaniye Aksa Gaz September Furmanite/Ipsco 2009 40"x16"x16"x40" Split Body Tee / 15 Hot-Tapping BOTAŞ Ceyhan Company Profile 11 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com CONTACT INFORMATION Contact Person: Enver Selim BOLUKBASI, Business Development Manager Address and Contact Information: Head Office Address : Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – ANKARA / TURKEY Tel : +90 312 473 41 81 Mobile : +90 533 688 55 71 Fax : +90 312 473 41 83 E-mail : [email protected] Web Address : http://www.acd-insaat.com Warehouse & Equipment Yard Address : Bumsuz Beldesi Girişi 2. km Haymana – ANKARA / TURKEY ANNEXES ISO 9001, ISO 14001, OHSAS 18001, EMRA – Energy Market Regulatory Authority Construction and Service Certificate Detailed Project Description Sheets Company Profile 12 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com Company Profile 13 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com Company Profile 14 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com Company Profile 15 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com Company Profile 16 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Tuzgölü Fresh Water Pipeline & Natural Gas Pipeline Construction Project Project Location: Aksaray - Konya / Turkey Client: BOTAS / TCC China Tianchen Engineering Corporation Project Start Date (month/year): Completion Date (month/year): 05/2012 On going Project Scope: 24” – 28” - 30” – 36” Total 150 km Pipeline Construction, Line Valve, Drain Valve and Relief Valve Chambers Construction (total 225 each) Company Profile 17 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Erbil - Kalak - Dohuk Natural Gas Pipeline Construction Project Project Location: Erbil / Iraq Client: KAR Group / 77 Construction - Pikaron Joint Venture Project Start Date (month/year): Completion Date (month/year): 06/2012 12/2012 Project Scope: 24” and 36” Total 60 km Pipeline Construction Company Profile 18 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Kırsehir / Mucur Compressor Station Construction Project Project Location: Kırsehir / Turkey Client: BOTAS / Turkerler Insaat A.S. Project Start Date (month/year): 08/2011 Project Scope: Completion Date (month/year): On Going Construction of Compressor Station with 2 Turbocompressor / Turbine Sets Company Profile 19 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Batı Raman & Raman Oil Field Development Project Project Location: Batman / Turkey Client: Turkish Petroleum Corporation (TPAO) Project Start Date (month/year): Completion Date (month/year): 09/2011 10/2012 Project Scope: 90 km Flowline (Steel, PE & Stainless) Construction, 12 each Manifold Construction Company Profile 20 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Extending Water Pipeline from Sherkozh Storage to Suli Quarter Project Location: Suleymaniah / Iraq Client: Pikaron - Zozik Joint Venture Project Start Date (month/year): Completion Date (month/year): 03/2010 02/2011 Project Scope: 48” - 17 km , 24” – 3 km Pipeline Construction 3 each Pump Station Construction Company Profile 21 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Oguz – Gabala – Baku Water Pipeline Project Project Location: Oguz – Gabala – Baku / Azerbaijan Client: Azersu (Project Owner) / HTG JV (Turan Haznedaroglu – Tekser – Gence Korpu Joint Venture) Project Start Date (month/year): Completion Date (month/year): 03/2008 06/2010 Project Scope: 80” - 47 km Pipeline Construction Flow Control Chamber, Pressure Control Chamber & Pressure Break Chamber Construction Company Profile 22 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Sayda Province Natural Gas Pipeline Project Project Location: Sayda City / Algeria Client: Sarl Nafco – Sonelgaz Project Start Date (month/year): 04/2008 Project Scope: Completion Date (month/year): 08/2008 8” - 25 km Pipeline Construction Company Profile 23 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Kesikkopru Dam to Ankara Ivedik Treatment Plant Pipeline Project Project Location: Ivedik - Ankara / Turkey Client: ASKİ (Ankara Water and Sewage Administration) Project Project Start Date (month/year): Completion Date (month/year): 05/2007 04/2008 Project Scope: 64” - 30 km Pipeline Construction, Pump Station Construction Company Profile 24 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Baku – Tbilisi – Ceyhan (BTC) Crude Oil Pipeline Project Project Location: Baku - Azerbaijan Client: BP – BOTAS Consortium Project Project Start Date (month/year): 05/2004 Project Scope: Completion Date (month/year): 08/2005 42” - 430 km Pipeline Construction, 19 Block Valve Station, 2 Pumping Station, 1 Pigging Station, 2 Check Valve Station Construction Company Profile 25 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Cankırı – Gerede Natural Gas Pipeline Project Project Location: Gerede - Bolu / Turkey Client: BOTAS Project Project Start Date (month/year): 08/2007 Project Scope: Completion Date (month/year): 12/2007 24” - 33 km Pipeline Construction Company Profile 26 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Ankara - Kazan Water Pipeline Project Project Location: Kazan – Ankara / Turkey Client: ASKI (Ankara Water and Sewage Administration) Project Project Start Date (month/year): Completion Date (month/year): 03/2007 12/2007 Project Scope: 28” – 36” - 28 km Pipeline Construction Company Profile 27 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Ingaz High Pressure Natural Gas Pipeline Project Location: Inegol - Bursa / Turkey Client: Ingaz Inc. Project Start Date (month/year): 01/2007 Project Scope: 8” – 2,5 km Pipeline Construction Completion Date (month/year): 03/2007 Company Profile 28 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Teksem Factory Natural Gas Conversion Works Project Location: Cerkezkoy - Corlu / Turkey Client: TEKSEM Inc. Project Start Date (month/year): Completion Date (month/year): 01/2007 03/2007 Project Scope: Teksem Factory all natural gas conversion works. Company Profile 29 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Turkey – Greece Natural Gas Pipeline Project Project Location: Kesan / Turkey Client: BOTAS - Atilla Dogan Inc. Project Start Date (month/year): Completion Date (month/year): 12/2006 02/2007 Project Scope: 36” – Pipeline Critical Welding Works and Hot-taps Company Profile 30 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Aliaga Pigging Station - RMS Station Natural Gas Pipeline Project Location: Aliaga -Izmir / Turkey Client: BOTAS – Atilla Dogan Inc. Project Start Date (month/year): Completion Date (month/year): 09/2006 01/2007 Project Scope: 20” - 8 km Pipeline Construction Company Profile 31 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Yozgat Sugar Factory RMS Station Project Location: Bogazlıyan - Yozgat / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 09/2006 10/2006 Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 32 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: PETKIM - 40 MW Gas Turbines and 14” Natural Gas Pipeline Construction Project Project Location: Aliaga - Izmir / Turkey Client: Petkim – Tokar Inc. Project Start Date (month/year): Completion Date (month/year): 08/2006 12/2006 Project Scope: Construction works for conversion of solid fuel to natural gas with turbine piping works. Company Profile 33 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Yumurtatepe - Seckoy Natural Gas Pipeline Project Project Location: Yumurtatepe - Seckoy – Bursa / Turkey Client: BOTAS – Atilla Dogan Inc. Project Start Date (month/year): Completion Date (month/year): 07/2006 12/2006 Project Scope: 24” - 13 km Pipeline Construction Company Profile 34 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: CS-5 Eskisehir Natural Gas Compressor Station Cyclone Filter Installation Project Location: Eskisehir / Turkey Client: BOTAS Project Start Date (month/year): Completion Date (month/year): 07/2006 09/2006 Project Scope: Revision of 16“ – 36” natural gas pipeline filters, additional cyclone filtering installation and commissioning works. Company Profile 35 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Iran Natural Gas Pipeline Project Project Location: Ardahan / Turkey Client: BOTAS Project Start Date (month/year): 03/2006 Completion Date (month/year): 05/2006 Project Scope: Gas Distribution to Ardahan City and 48”x12” Hot -Tap Works Company Profile 36 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Karacabey RMS Station Project Project Location: Karacabey – Bursa / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 04/2006 05/2006 Project Scope: 50.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 37 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas M.K. Pasa RMS Station Project Project Location: M. K. Paşa – Bursa / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 04/2006 05/2006 Project Scope: 60.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 38 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Malatya OIZ RMS Station Project Project Location: Malatya / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 04/2006 05/2006 Project Scope: 15.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 39 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Kahramanmaras OIZ RMS Station Project Project Location: Kahramanmaras / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 02/2006 03/2006 Project Scope: 75.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 40 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Payas OIZ RMS Station Project Project Location: Payas – Iskenderun / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 02/2006 03/2006 Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 41 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Iskenderun OIZ RMS Station Project Project Location: Iskenderun / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 01/2006 02/2006 Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 42 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Natural Gas Utility Pipeline Infrastructure Works for Kocaeli – Gebze IVth Istanbul Machinery and Manufacturing Organized Industrial Zone Project Location: Gebze – Kocaeli / Turkey Client: Palgaz Inc. Project Start Date (month/year): 01/2006 Project Scope: Natural gas utility piping works. Completion Date (month/year): 12/2006 Company Profile 43 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Mersin OIZ RMS Station Project Project Location: Mersin / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 10/2005 Completion Date (month/year): 11/2005 Project Scope: 20.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 44 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Adana OIZ RMS Station Project Project Location: Adana / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 10/2005 11/2005 Project Scope: 75.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 45 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Baser Kimya OIZ RMS Station Project Project Location: Osmaniye / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 09/2005 Completion Date (month/year): 10/2005 Project Scope: 2.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 46 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Gaziantep OIZ RMS Station Project Project Location: Gaziantep / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): 08/2005 Completion Date (month/year): 10/2005 Project Scope: 150.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 47 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Adana West RMS Station Project Project Location: Adana / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 07/2005 08/2005 Project Scope: 50.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 48 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Adana East RMS Station Project Project Location: Adana / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 07/2005 08/2005 Project Scope: 40.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 49 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Botas Mersin City OIZ RMS Station Project Project Location: Mersin / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 06/2005 08/2005 Project Scope: 150.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 50 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Ingaz Inegol RMS Station Project Project Location: Inegol - Bursa / Turkey Client: BOTAS, Kale Kalıp Inc. Project Start Date (month/year): Completion Date (month/year): 05/2006 06/2006 Project Scope: 50.000 Nm3/h Natural Gas RMS-A Station Construction Company Profile 51 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: EGO Revision Works Project Location: Ankara / Turkey Client: EGO Project Start Date (month/year): Completion Date (month/year): 01/2005 01/2006 Project Scope: Revision of 18 each Natural Gas RMS-A Station and Integration of Scada System Company Profile 52 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Blue Stream Pipeline Project (EGO – Ankara) Project Location: Ankara / Turkey Client: EGO Project Start Date (month/year): Completion Date (month/year): 12/2003 01/2004 Project Scope: 48” x 36” Hot-Tap Works and equipment installation Company Profile 53 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: Aksaray - Mercedes Truck Factory Natural Gas Conversion Project Project Location: Aksaray / Turkey Client: Troya Limited Company Project Start Date (month/year): Completion Date (month/year): 03/2004 05/2004 Project Scope: Mercedes Truck Factory all natural gas conversion works construction Company Profile 54 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: TPIC (Turkish Petroleum Company) / Emity Oil - Natural Gas Distribution System Project Location: Corlu / Turkey Client: Troya Limited Company Project Start Date (month/year): Completion Date (month/year): 06/2004 06/2005 Project Scope: Construction of Pipelines from Natural Gas Wells to the Factories at Corlu and Cerkezkoy Area, 4’’-6’’-8’’-10’’, 40 km Pipeline Construction Company Profile 55 / 56 ACD İnşaat Tesisat Ticaret Ltd. Şti. Ceyhun Atuf Kansu Cad. No:137/4-5 06520 Balgat – Cankaya / Ankara - Turkey Tel: +90 312 473 41 81 – 473 41 82 Fax: +90 312 473 41 83 http://www.acd-insaat.com DETAILED PROJECT DESCRIPTION Project Name: EGO Natural Gas Distribution System Project Location: Ankara / Turkey Client: EGO Project Start Date (month/year): Completion Date (month/year): 07/2002 12/2003 Project Scope: 36”-24”-18’’, 36 km Pipeline Construction, Compressor Station Construction Company Profile 56 / 56
Benzer belgeler
firma adı salon stand dörtel otomotiv san.paz.tic.ltd
Chongqing Gallop Gear Co., Ltd.
HUDSON-SELİM CEMAL ALEMDAR
TEX MOTOSİKLET AKSESUARLARI VE GİYİM ÜRÜNLERİ-CENGİZ KELEŞ
XIAMEN SONGLI IMPORT AND EXPORT CO.,LTD
HANGZHOU JOYSHINE IMP.&EXP.CO.,LTD.
HAR...