OPERATION AND MAINTENANCE Akyazı Wastewater Treatment
Transkript
OPERATION AND MAINTENANCE Akyazı Wastewater Treatment
OPERATION AND MAINTENANCE DOMESTIC WASTEWATER TREATMENT PLANTS Location Akyazı, Sakarya / TÜRKİYE Client Bank of Provinces Contractor MASS Contract Date 2006 Completion Date 2007 Akyazı Wastewater Treatment Plant Akyazı Wastewater Treatment Plant Scope: Maintenance-repair and operation services of described wastewater treatment plant for 12 months including operational personnel and maintenance staff, disposal of screening and sludge, supply of chemicals, maintenance of electrical and automation system and pumping station and energy supply of the plant. Plant Description: Pre-Treatment • Screening and Pumping Station • Grit & Grease Removal • Primary Sedimentation Biological Treatment • Activated Sludge System with Surface Aerators • Secondary Sedimentation Financial Resource Abu Dhabi Fund Sludge Treatment • Sludge Thickening • Aerobic Sludge Digestion with Surface Aerators • Sludge Dewatering with Beltpress Capacity Scope Operation of the plant for one year. Flow Population Equivalent Parameter BOD5 (mg/lt) TSS (mg/lt) 14,000 m3/day 70,000 PE Influent 255 258 Effluent 30 30 MASS ARITMA SİSTEMLERİ İNŞAAT SANAYİ VE TİCARET A.Ş. Gebze Organize Sanayi Bolgesi, 700. Sok., Gebze 41480 Kocaeli - Turkiye Phone: +90 (262) 751 2210 pbx Fax: +90 (262) 751 0730 e-mail: [email protected] www.massaritma.com
Benzer belgeler
domestıc wastewater treatment plants
Menteş Ege Military Bulwark Battle Troop
Wastewater Treatment Plant
MAN 4020 Broşürü
Savak sistemi: DIN19558 normuna uygun V tipi dişli savaklar, opsiyonel olarak sıyırıcı sistemlere dahil
edilmektedir. Köpük sıyırma sistemi olan tanklarda V savaklara ilave olarak, çıkış suyuna köp...
Nazareth – Ancient City Wastewater Treatment Plant
Quality effluent needed for irrigation without compromising aquifer.
The contract agreement provided for the process design, supply and delivery of 20 x
EK400 membrane units.
Additional s...