CONCRETE CANOE PASSED THE FLOATING TEST
Transkript
CONCRETE CANOE PASSED THE FLOATING TEST on 20 January 2012 Concrete canoe which was constructed as a Capstone Project has passed the floating test at Glapsides Lake, Famagusta. Concrete canoe produced is 610 cm in length with a width of 79.1 cm and 40.6 cm height completed after 4 months hard work. Three students under the supervision of Dr. Özgür Eren & Dr. Mustafa Ergil started the project as a “capstone project”. Project was divided five sections as design of dimensions of canoe, design of concrete for canoe, design of formwork for canoe, pouring concrete in formwork, curing concrete for 28 days and lastly float testing of canoe at Glapsides Lake. Floating test took place on 20 January 2012 and satisfactorily completed the last stage of production. Pictures related to project stages are given below. Photo 1. Timber form of canoe Photo 2. Reinforcing mesh in the formwork. Photo 3. Concreting completed Photo 4. Concrete canoe moving onto the lake Photo 5. Concrete canoe floating in Glapsides Lake
Benzer belgeler
SIMPEX® WALL FORM HT 20 Plus Girder
• Variety in panel sizes, possibility in gang forming,
• Flexibility in tie and timber beam spacing allows for higher design loads.
SIMPEX KOLON KALIPLARI İLE HIZLI VE ÇOK YÖNLÜ KALIPLAMA KOLAYLIĞI...
02 - Teknik-El
buildings
Teknik-El designs and manufactures
formwork systems for dams and water
retaining buildings which could be rotated
manually or by crane for single or double
sided applications according to...
aci 306,1
6. Beton dökülecek kalıpların sıcaklığı ile dökülen betonun sıcaklığı
arasındaki farkın büyük olmamasına dikkat edilmelidir.
7. Isıtılmış yerlerde dökülen betonun ani kuruması gerekli kür uygulamas...
firma adı adresi
124 Beşparmaklar Cad., Çatalköy / Girne
Atatürk Cad., 9A, Özenköy / Girne
Ziye Rızkı Cad., No3 / Girne
Kordonboyu Cad., / Girne
Ziye Rızkı Cad., No195 / Girne
Kings Leasure Centre üzeri, yeni çevre...