raised access floor
Transkript
raised access floor
raised access floor All rights reserved. No part of this catalogue may be reproduced or copied, without prior written permission. Producing spare parts for automotive industry since 1980 in metal industry, our company began manufacturing the understructure of Raised Access Floor Systems in 1999. With the experience we gained on the understructure of raised access floor systems, we established our panel production band and started the sales of the complete systems by 2003. Regarding product quality and honesty as main principles, our company has certified its product quality with the tests carried out abroad in England, Russia and in Turkey METU and TSE. Formfloor, operating with a completely computer-aided production band, has the ability of carrying out the dimensional and load bearing tests in its own laboratories. Formfloor and Formmetal have certified their activities in accordance with the ISO 9001:2000 Quality Management System Standard. Improving its production capacity and technology continuously, our firm activated the new facilities founded in a 6.500 m2 in door and 10.000 m2 total area in 2008. By strong machinery, expert production and engineering staff and sales and installation staff in Ankara and Istanbul, Formfloor serves quality and confidence to you. Formfloor aims to be the leader of the sector with high-quality products, on time delivery, customer focused work, suitable price policy and renovative manner. TPAO System Room as it comes to raised access floor... Today, developing information technologies, rapid change in business life, has brought out a necessity for f lexibility in buildings and falling in step to changes. Application of advanced communication technologies, has brought about an increase in power, voice and data cables. Usage of advanced technology has become more meaningful with the low cost, accessibility and changeable construction. At installed places, Formf loor Raised Access Floor Systems not only hide the cables, but also make access to the understructure easier and help the under warming and cooling systems work effective. It forms the place on the ground which will provide the circulation of all the services in building in the required directions. Formf loor Raised Access Floor Systems serve together a wide range of alternatives having different load bearings and addressing the customer pleasure. Grid Telecom Areas of Use: • Offices • Bank sections and centers • UPS rooms • System Rooms (Banks, Companies, Factories etc.) • Control Rooms (Dams, Powerhouses etc.) • Signalization Rooms (Subway Systems) • Laboratories • Computer Rooms (Educational Institutions, Internet Cafes etc.) • The places which need to be modified regularly (Fairs, Showrooms, Shopwindows etc.) Advantages: • Flexibility in design • Modular structure • Variety of options on surface coverings • Easiness in design and changing plans • Providing required service room for installation systems • Easy reachability of the system • Understructure systems of different heights • Easy fitting • High load resistance • Possibility of electrostatic discharge • Decreasing the changing costs. • Time saving Panels The core material of panels is high density and load resistant special product “chipboard”. The thickness is applied 30 or 38 mm according to the purpose of use. The standard size of the panels is 600x600 mm. If required, it can be produced with 400x600 mm special size and with the understructure stringer or without it. The angle on the edge of panels not only provides easy fitting but also provides easier access to the system under the floor. Top Surface Coverings: One of the most important features of the raised floors is providing rich covering alternatives. By covering the surface of chipboard with a variety of materials such as laminate, pvc, aluminum sheet or foil, sheet steel and carpet, users’ needs are met totally. Bottom Surface Coverings: The material used at the bottom of the panel changes according to the class of required load. There are alternatives as 0,5 mm thick sheet steel, 0,2 mm thick aluminum sheet or 0,05 mm thick aluminum foil, according to their high resistance, protection against moisture, conductivity or antistatic features. Panel Tests: Formfloor marked panels have been tested and approved by the expert foundations in our country and abroad. Load bearing, fire-resistance, corrosion-resistance, electrical conductivity and antistatic features have been certified by institutions like England authorized laboratories, METU and TSE. Our company keeps on research and developing activities in its own laboratories. • All experiments are carried out in accordance CLASSES OF LOAD AND DEFLECTION ACCORDING TO EN 12825 STANDARD: with EN 12825 Standard. • The working load is evaluated by dividing the ultimate load to the k=3 safety factor. Classes of Elements Ultimate Load (kN) 1 ≥4 2 ≥6 3 ≥8 Classes of Deflection 4 ≥9 A 2,5 5 ≥10 B 3,0 6 ≥12 C 4,0 • Residual deflection, permitted by the Standard, is 0,5 mm at most. Max. Deflection (mm) • All panels’ dimensional deviation class is 1. • Load bearing tests are carried out on 32 cm height systems without stringers. Laminate Covered Panels (HPL) Core Material : According to the desired load capacity, 30 or 38 mm thick and min 650 kg/m3 density chipboard is used. Top Covering : 1 mm thick, overlay covered HPL laminate resistant to abrasion. Bottom Covering : Depending on the needs, 0,5 mm thick sheet steel, 0,2 mm thick aluminum sheet or 0,05 mm thick aluminum foil are used. Edge Covering : 0,4 mm thick hard PVC. It can be applied in colors appropriate to the top covering. PANEL TYPE STATIC LOAD DYNAMIC LOAD Range of Load Resisstance Load-Deflection Class Residual Deflection (max.) Hard Body Impact Test Soft Body Impact Test 3,2 9,7 - 16,4 4A 0,00 mm √ √ 3,0 8,8 - 15,9 3B 0,00 mm √ √ Aluminum Foil 2,6 7,9 - 15,0 2B 0,00 mm √ √ Sheet Steel 2,6 7,8 - 11,5 2B 0,08 mm √ √ 30 Aluminum Sheet 2,0 6,1 - 9,8 2C 0,14 mm √ √ 30 Aluminum Foil 1,6 4,9 - 8,5 1B 0,14 mm √ √ Bottom Covering Working Load (kN) 38 Sheet Steel 38 Aluminum Sheet 38 30 Chipboard Thickness (mm) PVC Covered Panels Core Material : According to the desired load capacity, 30 or 38 mm thick and min 650 kg/m3 density chipboard is used. Top Covering : In various thicknesses and as appropriate to the aim, PVC can be used in features like homogeneous, heterogeneous, antistatic, conductive, linoleum, etc. Bottom Covering : Depending on the needs, 0,5 mm thick sheet steel, 0,2 mm thick aluminum sheet or 0,05 mm thick aluminum foil are used. Edge Covering : 0,4 mm thick hard PVC. It can be applied in colors appropriate to the top covering. PANEL TYPE STATIC LOAD Load-Deflection Class Residual Deflection (max.) Hard Body Impact Test Soft Body Impact Test 4B 0,00 mm √ √ 4C 0,00 mm √ √ 9,2 - 14,0 4C 0,00 mm √ √ Bottom Covering Working Load (kN) 38 Sheet Steel 3,2 38 Aluminum Sheet 3,0 9,1 - 13,8 38 Aluminum Foil 3,1 Chipboard Thickness (mm) DYNAMIC LOAD Range of Load Resisstance 9,7 - 13,0 30 Sheet Steel 2,1 6,2 - 12,2 2B 0,08 mm √ √ 30 Aluminum Sheet 2,2 6,5 - 11,1 2C 0,14 mm √ √ 30 Aluminum Foil 1,7 5,2 - 7,9 1C 0,14 mm √ √ Galvanized Sheet Steel Covered Panels Core Material : According to the desired load capacity, 30 or 38 mm thick and min 650 kg/m3 density chipboard is used. Top Covering : 0,5 mm thick sheet steel. It is used in places where high resistance required, and is suitable for covering with carpet. Bottom Covering : 0,5 mm thick sheet steel. Edge Covering : 0,4 mm thick hard PVC. PANEL TYPE STATIC LOAD DYNAMIC LOAD Residual Deflection (max.) Hard Body Impact Test 4A 0,00 mm √ √ 2A 0,04 mm √ √ Bottom Covering Working Load (kN) Range of Load Resisstance Load-Deflection Class 38 Sheet Steel 3,2 9,6 - 18,0 30 Sheet Steel 2,4 7,2 - 18,3 Chipboard Thickness (mm) Soft Body Impact Test Aluminum Sheet/ Foil Covered Panels Aluminum Sheet Core Material : According to the desired load capacity, 30 or 38 mm thick and min 650 kg/m3 density chipboard is used. Top Covering : 0,2 mm thick aluminum sheet. It is an ideal solution for bare or carpet covered places. Bottom Covering : Depending on the needs, 0,5 mm thick sheet steel, 0,2 mm thick aluminum sheet or 0,05 mm thick aluminum foil are used. Edge Covering : 0,4 mm thick hard PVC. PANEL TYPE STATIC LOAD DYNAMIC LOAD Chipboard Thickness (mm) Bottom Covering Working Load (kN) Range of Load Resisstance Load-Deflection Class Residual Deflection (max.) Hard Body Impact Test 38 Aluminum Sheet 3,4 10,3 - 14,8 5C 0,00 mm √ √ 30 Aluminum Sheet 2,2 6,5 - 11,9 2C 0,14 mm √ √ Soft Body Impact Test Aluminum Foil Core Material : According to the desired load capacity, 30 or 38 mm thick and min 650 kg/m3 density chipboard is used. Top Covering : 0,05 mm thick aluminum foil/0,2 mm thick aluminum sheet is generally used in places to be covered with carpet. Bottom Covering : Depending on the needs, 0,5 mm thick sheet steel, 0,2 mm thick aluminum sheet or 0,05 mm thick aluminum foil are used. Edge Covering : 0,4 mm thick hard PVC. PANEL TYPE STATIC LOAD DYNAMIC LOAD Chipboard Thickness (mm) Bottom Covering Working Load (kN) Range of Load Resisstance Load-Deflection Class Residual Deflection (max.) Hard Body Impact Test 38 Aluminum Foil 2,4 7,2 - 13,2 2C 0,00 mm √ √ 30 Aluminum Foil 1,9 5,6 - 8,9 1C 0,14 mm √ √ Soft Body Impact Test ri ng er d oar ipb Ch B te ne r et sk Ga Edg eB an tto m C ding o ve r in g St er ng ri St Bo To Pan p Co el ve ri ng Understructure e Sc at Pl re w ss Fa s ra d ea H Pe de st al B as e N ut M 14 Pi pe H et sk ea d Ga Nr Part Name Material Piece/m2 1 Pedestal Base 2 mm Galvanized Steel 3,4 2 Nut M14 Special Product 3,4 3 Pipe Galvanized Steel Ф 25 x 1,5 mm 3,4 4 Pedestal Head 3 mm Galvanized Steel 3,4 5 Head Gasket Plastic 3,4 6 Stringer 1 mm Galvanized Steel 5,5 7 Stringer Gasket Plastic 5,5 8 Screw Fastener Galvanized Steel M6 11 No collapse for the pedestals under four times the working load according to the Standard EN 12825. M14 Pedestal Heights FM Code Nr Pedestal Height (mm) Minimum (mm) Maximum (mm) 30040 40 35 50 30080 80 55 80 30100 100 80 120 30120 120 90 140 30150 150 120 170 30180 180 150 200 30210 210 180 230 30240 240 210 260 30270 270 240 290 30300 300 270 320 30330 330 300 350 30360 360 330 380 30390 390 360 410 30420 420 390 440 30450 450 420 470 30480 480 450 500 30510 510 480 530 30540 540 510 560 30570 570 540 590 30600 600 570 620 30630 630 600 650 30660 660 630 680 30690 690 660 710 30720 720 690 740 30750 750 720 770 30780 780 750 800 30810 810 780 830 30840 840 810 860 30870 870 840 890 30900 900 870 920 30930 930 900 950 30960 960 930 980 990 960 1010 30990 M14 Technical Features 3. Pipe: It is a galvanized steel pipe with a thickness of 1,5 mm and diameter of 25 mm pressed to the pedestal head. 2 1 4 3 1. Pedestal Base: 2. Nut M14: 4. Pedestal Head: It is made of 2 mm galvanized steel At heights of 80 mm and above, it is It is made of 90 mm diameter and 3 plate with the 100x100 mm square used for adjusting the pedestal height mm galvanized steel plate. It provides riveted to a M14 threaded rod. and fixing it at required height by its fixing the stringers easily and is special locker. produced in a suitable shape to lock the pedestal head and stringers. If required, a second fixing can be done using the screw fastener. 8. Screw Fastener: 9. Locking Nut: It is an M6 galvanized screw used for It is used for 40 mm height fixing the stringer and the pedestal pedestals and made of 3 mm thick head. galvanized steel plate. It provides fixing the pedestal height. 5 9 8 5. Head Gasket: 10. Plug Nut: 3 mm thick square plastic gasket It is a M14 threaded special nut used is located on pedestal head and for adjusting height for 40 mm prevents sliding and noise which pedestals. can occur during the contact of panel and metal pedestal. If conductivity is required in the system, a conductor head is additionally located on the head gasket. 10 6. Stringer: 7. Stringer Gasket: It is made from 1 mm thick Made of 1 mm thick plastic and galvanized steel plate. “U” shaped located on the stringers the stringer stringer’s dimensions are 25x26x25 7 mm. Production of the stringer system for use in the panels of that can occur during the contact of stringers and panel. 600x600 mm and 400x600 mm is possible. gasket prevents the sliding and noise 6 Laboratory Dimensional Measurement Load Bearing Test TEİAŞ Hisar Transformer Station Accessories Earthquake Prop Rubber Suction Cup Ramp Sentim Vent Cable Box TPAO Certificates References Medicana Hospital City’s Nişantaşı Onko Ecza Güney Plaza Adayön Mimarlık – Doğuş Otomotiv / NTV Ankara Head Office – İstanbul / İstinye Park / İstanbul • Akbey İnşaat / İstanbul – Oyakbank Branch – TEB Branch – DenizBank Branch – HSBC Branch • Akel Zemin –Sika Yapı Kimya Factory / İstanbul – İş Bankası Şişli Branch Office / İstanbul – Çırağan Kempinsky Hotel/ İstanbul – Fenerbahçe Stadium Securit Room/ İstanbul • Umut İnşaat – Denizbank Branch – Digiturk – Turkcell • Teknik İnşaat – HSBC Branch – Fortisbank Branch • Yapı Konsrtüksiyon – Finansbank Branch – TEB Branch • Orantı Mimarlık – Finansbank Branch – TEB Branch • Bora İnşaat – TEB Branch – HSBC Branch • Turcom – Galatasaray University – Haliç University – Head Office and Regional Ofiices • Altis – GAP INTERNATIONAL Istanbul Head Office – Sea Trade Office – YKK Head Office PİM 3 Plaza • Doğuş Bilgisayar – Efes Pilsen – Nurol Holding • Meit Group – TAYSAD Org.San.Böl. Denso Fb. / İstanbul - İzmir Swiss Hotel – İMKB – Carrefour-Sa Stores – Cıtıbank Branch – Tefken Tower Citi Group – Gima Stores • Alp Yapı –HSBC Branch – Teb Branch • Movipar – Güney Diş Deposu Ofiices- Polaris Plaza – HSBC Branch • Deka Aş. – TAV Information Rooms- İstanbul –Mardin Çimento Factory – Robert High School / İstanbul – Ata Yatırım Dubai Office • Kartur İnşaat – Roche Head Office • Medline Head Office • Özgün Ofis – Grid Telekom Head Office – Grid Telekom Bahreyn Regional Office • Özgün İnşaat – Hyosung Factory – Coca Cola Erbil Factory • Pames Head Office • Yes Yapı – TEB Branch – Finansbank Branch – Yapı Kredi Insurance - Head Office • Grup Eksen – Erzurum Atatürk University / İstanbul – Bank Pozitif Kavacık Branch. / İstanbul – Kale Kalıp Factory- Gebze – İKS IT Room – Ankara – Uşak Kışladağ Gold Mine – Bank Asya Işık Insurance / İstanbul – Hotiç Store / İstanbul – Sakarya Ülker Akgıda Factory –Proline / İstanbul – İst Aydın University – İGDAŞ Alibeyköy Branch. / İstanbul – İİst. B.Şehir Governer Merter Branch – İst. Büyükşehir Governer – Halkalı Devlet Hospital / İstanbul - Bitlis Eren University / İstanbul• Maya Center – İstanbul /Sun Plaza – İstanbul • Taş Yapı – Meteorloji Region Office – Medipol • Alarga Mimarlık –Opel Head Office – Gima Store • Uygar Mimarlık – Aktaş Kimya Head Office – Eyüp Sabri Tuncer Office – Arde Klima Head Office • Megaron Mimarlık – HSBC Branch • Berk İnşaat – HSBC Branch • Taşdemir Mühendislik – Şekerbank Branch – Fortisbank • Mes Medikal • Han Zemin –Türktelekom IT Room –Tekirdağ / İstanbul – Taysad Org.San.Böl. Autolive Office / İstanbul – İzmit Kadın Doğum Hospital/ İstanbul – Unılever Algida Factory / İstanbul• Simge Yapı – Türk Telekom ADSL IT Room – Trabzon – Türk Telekom –Giresun • Yüksel İnşaat –Amerikan Military Base Comunication Center – Özbekistan / Ankara • Cevahir İnşaat – Cevahir Alışveriş Merkezi Electrical Rooms – Cevahir Alışveriş Merkezi Power Rooms • Park İnşaat – City's Nişnataşı AVM IT Room • Yeda İnşaat – AKOM Valilik Head Office • B&U Mimarlık – AKOM Head Office – TAV Airport Passport Office • Biat Möble – Tav Airport International Arrivals- Departures • Sentim Head Office • Pekerler İnşaat – Cumhuriyet Museum • ONKO Ecza Head Office • Sistem Yapı – Şişecam Bulgaristan Glass Factory – İSDEMİR Power and Electrical Rooms • Topkara İnşaat – Türktelekom Levent Regional Office/ İstanbul – Türktelekom Gayrettepe Regional Office / İstanbul – Türktelekom Bahçelievler Regional Office / İstanbul – Türktelekom Halkalı Regional Office / İstanbul • İMT – Türktelekom Zeytinburnu Regional Office / İstanbul – Türktelekom Levent Regional Office / İstanbul • MGT – Alamaata Technopark Office • Bektaşlar İnşaat – Türktelekom Bağcılar Regional Office / İstanbul • Ortadoğu Şirketler Grubu – PİM3 Plaza • Aksim İnşaat Kıbrıs Lefke Amerikan University • Eksen Elektrik • Mineteko – Kırklareli Tracim Çimento Factory/ İstanbul – Pendik Goverment / İstanbul – NPI Hospital Üner Plaza Armada Crown Plaza NPI İstanbul SHF Bilgisayar • MRC İnşaat – Tekfen Tower DeutcheBank Istanbul Office • HCN Customer Services - Üner Plaza• Audio Elektronik Head Office • Yapı Merkezi İnşaat – Ulaş Tüneli Tunnel Control Rooms / Alanya – Çamburnu Tunnel Control Rooms / İstanbul • Asya Mobilya – Haliç University Mecidiyeköy Campus • Üçgen İnşaat – Sea Coordination Relations Offices - Sarköy, Mudanya, Bozcaada /Sarköy, Mudanya, Bozcaada • Ford Otosan Tübitak MAM Arge Office • Mentaş – Tuzla Sedef Kalkavan Shipyard Office – Süperonline Head Office – Citibank Branch – Sea Traders Center- Head Office – Paşabahçe Kırklareli Glass Factory – Medicana Hospital •Alcatell Lucent Factory / İstanbul • Tarhan Mimarlık –Telekom Head Office • Atıl Elektronik Head Office• Günay İnşaat – Urfa Airport – 3. Military General Office- Istanbul • Mesa Hospital – Ankara • T.P.A.O General Manager – Ankara • Katü Kampüsü Stem Cell Labrotories– Trabzon • Siemens – Hisar Power Center / Ankara • T.C. Central Bank – Ankara • City Governer Bank Head Office – Ankara • Gate Elektronik – Ankara • Kardemir – Control Rooms – Karabük • Aselsan – Ankara •Gölcük Naval Force Head Office – Gölcük • Karsel Building – Kazakistan • Aysel İnşaat – Novai Airport – Özbekistan • AEC İnşaat – Tübitak Arge – Ankara •Altay Mekanik – Havelsan – İzmit • İncirlik Air Base Commander – Adana • Kcell – Kazakistan •Cepa Shopping Center – Ankara • 112 Emergency Service Control Room – Antalya • Beysupark Shopping Center – Ankara • Henkel Factory – Ankara • K.K.T.C. Ministry Of Communication - K.K.T.C. • Traffic Control And Communication Center • Besa - Rtük It Rooms– Ankara •Armada Center Office Flats – Ankara – Eczacıbaşı Invest Office – Reis Automotive Office – Karakaya Telecomunication Office – Tarma Architecture Office – Protel Gsm Office • İsdemir (İskenderun Steel Factory) – İskenderun / Hatay • Sistem Yapı / İsdemir Slab-1 • Sistem Yapı / İsdemir Çelikhane Modernizasyon • Gemont İsdemir Renovation And Modernisation Project • Demirtaş Mimarlik – Security Room • Kurtoğlu İnşaat – Isdemir Steel Factory • Türk Telekom – Elazığ Türk Telekom Branch Office – Elazığ – Erzincan Telekom Branch Office – Ankara – Türk Telekom Branch Office – Afyon Türk Telekom Branch Office – Afyon • Ecemiş Yapi - Adana Türk Telekom Branch Office – Adana • Metzan Yapi / Ceyhan Türk Telekom Operation Building – Adana • NİŞ Zemin / İzmir Türk Telekom Branch Office – İzmir – Türk Telekom Branch Office – Tarsus / İçel – Türk Telekom Branch Office İskenderun• Vodafone –Operation Building / Erzurum – Pursaklar Operation Building /Ankara • Forum Shopping Center – Ankara Forum Shopping Center – Mersin Forum Shopping Center – Trabzon Forum Shopping Center • BESA – Sanko Holding – Gaziantep – Police Head Office Telecomunication Center/Ankara – Global Teknik Telecomunication Control Communication Laboratory – Ankara – Ünye Cement Factory – Niğde Telekom Branch Office – Başkent Tv / Ankara – Koski /Konya – Sudan Petrol Head Office – Sudan • Zen Yapı – American Military Base – Iraq – Soda Factory – Mersin – Adana Hippodrome – Adana – Ministry Of Justice Prison - Kırıkkale - Antalya - Mersin - Sanko Cement Factory – Gaziantep – Transformer Building- Ankara – Mersin University – İsdemir • Denge Zemin – Bursa Hippodrome – TRT Ankara – Ministry Of Foreign Affairs/Ankara – Ministry Of Communication Conference Saloon / Ankara – Hıfsısıhha Enstitüsü / Ankara – 29 Mayıs Hospital / Ankara – Behçet Uz Çocuk Hospital / İzmir – Pamukkale University Hearth Disease Center / Denizli – AKP Party General Head Office – Türkiye Statics Institute • A3 İnşaat – Hsbc Branch • Altay Mekanik – National Estate – Ankara – General Directorate Of State Airports Authority – City Governer – Some City’s Branch Office – Havelsan Branch Office– İzmit– Esenboğa Airport Radar Center /Ankara – Naval Forces- Ankara - Naval Forces- Gölcük –Aytemiz Petrol Branch Office/ İstanbul – Mahmudiye Mineral Water It Room / İstanbul – Mit National Intelligence Agency Ankara Branch Office Organize Sanayi Bölgesi Dağıstan Caddesi No: 6 Sincan Ankara Türkiye Tel : +90 312 267 55 61 pbx Fax : +90 312 267 45 21 e-mail : [email protected] İstanbul Branch Office Dr. Mithat Süer Sokak No: 14/24 Erenköy 34730 İstanbul Türkiye Tel : +90 216 355 74 78 pbx Fax : +90 216 355 74 80 e-mail : [email protected] Factory Organize Sanayi Bölgesi Dağıstan Caddesi No: 6 Sincan Ankara Türkiye Tel : +90 312 267 55 61 pbx Fax : +90 312 267 45 21 e-mail : [email protected] www.formfloor.com.tr Products are produced by FORMMETAL MAKİNA SANAYİ LTD. ŞTİ.
Benzer belgeler
referanslarımız 2008
İ.M.K.B. Ana Binası Başkanlık Katı (İstinye)
Lafarge Alçı Levha Duvar ve Asma Tavan Uygulaması
Betek Boya Uygulaması
Deniz Kuvvetleri Komutanlığı Heybeliada Şafak Tesisleri (Heybeliada)
Lafarge Al...
Gundogdu Brosur 2.0.indd
and experience in the machinery industry, is offering
world-renowned brands in tooling under the motto
“Innovative Service”.
Gündogdu is the distributor of leading German
brands Gewefa, EWS, Wohlha...
2009 - Meit Yapı A.Ş.
Gerflor Metallica PVC Yer Döşemesi Uygulaması
Sofra Yemek Üretim ve Yönetim Binası (Beylikdüzü)
Lafarge Alçı Levha Duvar ve Asma Tavan Uygulaması
Armstrong Dune Sahara Tegular Taşyünü Asma Tavan Uy...