(CDM-PDD) Version 03
Transkript
(CDM-PDD) Version 03
PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 1 0CLEAN DEVELOPMENT MECHANISM PROJECT DESIGN DOCUMENT FORM (CDM-PDD) Version 03 - in effect as of: 28 July 2006 CONTENTS A. General description of project activity B. Application of a baseline and monitoring methodology C. Duration of the project activity / crediting period D. Environmental impacts E. Stakeholders’ comments Annexes Annex 1: Contact information on participants in the project activity Annex 2: Information regarding public funding Annex 3: Baseline information Annex 4: Monitoring plan PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 2 SECTION A. General description of project activity A.1. Title of the project activity: >> Project Title: Sayalar Wind Farm Capacity Addition Project, Turkey PDD version: 1.0 Date: 13.10.2011 A.2. Description of the project activity: >> Summary: The Sayalar Wind Farm is located in Agean Region, Manisa – Akhisar Province, Sayalar District in Turkey and is currently operational with an installed capacity of 34.2 MW (Hereafter referred as existing power plant. The existing power plant consists of 38 turbines with a capacity of 900 kW each. The existing 34.2 MW capacity of Sayalar Wind Farm has been registered as a Gold Standard VER project on 01/11/2007 under the registration number GS369 by “Doğal Enerji Elektrik Üretim A.Ş.”1. The Project Participant is planning to increase the existing 34.2 MW capacity to 54.2 MW installed capacity with a 20MW capacity addition (hereafter referred as the proposed project activity) to the existing power plant2. The proposed project activity is developed by “Doğal Enerji Elektrik Üretim A.Ş.” (Hereafter referred as the project participant) and involves the installation of 10 wind turbines. The electricity generation from the capacity addition is estimated to reach approximately 55 GWh/year3 and will be delivered to the national grid via Akhisar Transformer Station. The project activity aims to reduce GHGs by replacing electricity generation from the Turkish national grid system with electricity generation from wind energy, which has zero emissions. In accordance with the applicable methodology ACM0002 “Consolidated baseline methodology for grid connected electricity generation from renewable sources” v.12.1.0, the baseline emissions include only CO2 emissions from electricity generation in fossil fuel fired power plants that are displaced due to the project activity. The methodology assumes that all project electricity generation above baseline levels would have been generated by existing grid-connected power plants. The annual emission reductions, which will result from the capacity addition, are estimated as 34,477 tCO2eq/year. Contribution to Sustainable Development: Renewable wind energy is an energy source that offers various environmental benefits. It does not result in emissions of pollutants into the atmosphere, nor does it emit residuals that can have an impact on soil 1 Reference: The Gold Standard Foundation Official Webpage, Public Reports, VER Projects / https://gs1.apx.com/myModule/rpt/myrpt.asp?r=111 2 Reference: Generation License available to the DOE. 3 Reference: Technical Feasibility (micrositing) available to the DOE PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 3 and water. The net result is a reduction of fossil fuel consumption that would occur in power stations connected to the national grid so as to produce an equivalent amount of energy. At the same time, wind energy is a renewable source. So it does not endanger the supply of energy for future generations. The project contributes significantly to the region’s sustainable development in the following ways: • Wind energy is a renewable energy source. Unlike fossil fuels, it does not reduce the availability of energy for future generations. • Reduction of greenhouse gas emissions and other pollutants in Turkey by replacing electricity otherwise generated by the Turkey’s national grid, which has a large share of fossil fuel power generation4. • The project also reduces other emissions than GHG such as emissions of sulfur dioxide, nitrogen oxides, and particulates. In turn it contributes to local improvement of air quality. • The project will enable the use of renewable energy in Turkey and attract foreign and private investment into the Turkey’s power sector. • The project strengthens the involvement of Turkey in renewable energies and low carbon power production through the use of market mechanisms. • Creation of local employment both during the construction and operational phase. Based on 2010 figures, the unemployment rate is above 11% in Turkey5. • Technology and know-how transfer. • Power supply improvement to the national grid both for domestic and commercial consumers. • Diversification of electricity generation technologies in Turkey, which is currently dominated by natural gas fired power plants. Additionally, no major negative impacts are expected as confirmed by the Local Stakeholders Consultation Meeting. A.3. Project participants: >> Name of Party involved (*) (host indicates a Host Party) Turkey (host) Private and/or public entity(ies) project participants (*) (as a applicable) Doğal Enerji Elektrik Üretim A.Ş. Kindly indicate if the Party involved wishes to be considered as project participant (Yes/No) No Doğal Enerji Elektrik Üretim A.Ş. is a special purpose company established jointly by Demirer Enerji Üretim Sanayi ve Ticaret A.Ş.6 and Polat Enerji Sanayi ve Ticaret A.Ş7. 4 80% of the total electricity generation of Turkey is from thermal power plants. Reference: TEIAS (Turkish Electricity Transmission Co) official webpage, 2009 statistics / http://www.teias.gov.tr/istatistik2009/32(75-09).xls 5 Reference: TUĐK (Turkish Stastical Institute) 2010 Statistical Yearbook Section 11 p193 http://www.teias.gov.tr/istatistik2009/32(75-09).xls 6 Reference: www.demirer.com.tr 7 Reference: http://www.polatenerji.com/polat.php PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 4 OakDanışmanlık is the carbon consultant for this project8. Full contact information for the project participants are provided in Annex 1. A.4. Technical description of the project activity: A.4.1. Location of the project activity: A.4.1.1. >> Republic of Turkey A.4.1.2. Host Party(ies): Region/State/Province etc.: >> Aegean Region, Manisa Province A.4.1.3. City/Town/Community etc.: >> The proposed project is located in Manisa – Akhisar Province Sayalar District. The closest residential area is the Deremahallesi Village. 8 OakDanışmanlık is not a project participant PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 5 A.4.1.4. Details of physical location, including information allowing the unique identification of this project activity (maximum one page): >> Figure 1: The geographic location of the proposed project activity The coordinates of the centre point of the proposed project activity is 39°11'52.45" N; 27°57'45.55"E. The coordinates of the turbines are available to the DOE. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 6 A.4.2. Category(ies) of project activity: >> Table 1. Categories of the project activity Applicable rules and Category definitions UNFCCC Sectoral scope 1, Energy Industries (renewable/nonrenewable sources)9. Gold Standard Large scale Renewable Energy Supply10. Justification The proposed project activity involves grid connected electricity generation from renewable sources. The project exceeds the small scale project threshold of 15 MW installed capacity and involves generation and delivery of energy services from non-fossil and nondeplatable energy sources. A.4.3. Technology to be employed by the project activity: >> The proposed project activity involves the installation of 10 units of additional wind turbines with a total installed capacity of 20 MW. The project activity is expected to generate approximately 55 GWh/year of net electricity. The total capacity addition will be reached by installation of Enercon gearless turbines. The key technical specifications of the turbines are as follows: Table2. Key technical specifications of wind turbines Parameter Value Rated Power 2MW Rotor Diameter 71 - 82 m Turbine Concept Gearless, variable speed, single blade adjustment Rotor Type Upwind rotor with active pitch control Number of blades 3 Swept Area 3959 - 5281 m2 Hub Height 78 – 85 m Blade Material GRP (epoxy resin); built in lightning protection Rotational speed Variable, 6-21 rpm Pitch Control Enercon single blade pitch system; one independent pitch system per rotor blade with allocated emergency supply Generator Enercon direct drive annular generator Brake Systems - 3 independent pitch control systems - Rotor brake - Rotor lock Yaw System Active via yaw gear, load dependent damping Cut out wind speed 28-34m/s 9 Sectoral scopes related approved methodologies and DOEs: http://cdm.unfccc.int/DOE/scopes.html 10 Gold Standard Toolkit, Chapter 1.2, p 20: http://www.cdmgoldstandard.org/fileadmin/editors/files/6_GS_technical_docs/GSv2/GSV2_Toolkit.pdf PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 7 A.4.4. Estimated amount of emission reductions over the chosen crediting period: >> Years 2012 2013 2014 2015 2016 2017 2018 2019 Total emission reductions (tonnes of CO2eq) Total number of crediting years Annual average over the crediting period of estimated reductions (tonnes of CO2-eq) Annual estimation of emission reductions in tonnes of tCO2-eq 14,36511 34,477 34,477 34,477 34,477 34,477 34,477 20,11112 241,338 7 34,477 A.4.5. Public funding of the project activity: >> No public funding from the Annex I countries is provided to the proposed project. 11 It is estimated that the crediting period will start on 01.08.2012 12 It is estimated that the first crediting period will end on 01.08.2019 PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 8 SECTION B. Application of a baseline and monitoring methodology B.1. Title and reference of the approved baseline and monitoring methodology applied to the project activity: >> Applied approved baseline and monitoring methodologies: • Approved consolidated baseline methodology ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources”, version 12.1.0 Used tools: • “Tool for the demonstration and assessment of additionality”, version 5.2.1 • “Tool to calculate the emission factor for an electricity system”, version 2.2.0 For more information regarding the methodology please refer to http://cdm.unfccc.int/methodologies/PAmethodologies/approved.html B.2. Justification of the choice of the methodology and why it is applicable to the project activity: >> The project activity involves capacity addition by installation of new wind turbines additional to the existing power plant and units. The existing power plant/units will continue to operate after the implementation of the proposed project activity. The applicability of the methodology and tools have been discussed below. Applicability of ACM0002 version 12.1.0 The methodology ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” is applicable to grid-connected renewable power generation project activities that a) install a new power plant at a site where no renewable power plant was operated prior to the implementation of the project activity (greenfield); b) involve a capacity addition c) involve a retrofit of (an) existing plant(s); or d) involve a replacement of (an) existing plant(s). Since the proposed project activity involves grid connected renewable power generation that involve a capacity addition, ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” version 12.1.0 is applicable. The applicability criteria and conditions are discussed in more detail as follows: Ref. A) Applicability Criteria The project activity is the installation, capacity addition, retrofit or replacement of power plant/unit of one of the following types: hydro power plant/unit (either with a run-of-river reservoir or an accumulation reservoir), wind power plant/unit, geothermal power plant/unit, solar power plant/unit, wave power plant/unit or tidal Justification The project activity involves capacity addition of an existing power plant by installation of new wind power units. The existing power plant is currently in operation with 34.2 MW and the capacity will reach approximately 54.2 MW with an addition of 10 new wind turbine units. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 9 B) C) D) power plant/unit; In case of capacity additions, retrofits or replacements (except for wind, solar wave and tidal power capacity addition projects which use Option 2 to calculate the parameter EGPJ,y): the existing plant started commercial operation prior to the start of minimum historical reference period of five years, used for the calculation of baseline emissions and defined in the baseline section, and no capacity expansion or retrofit of the plant has been undertaken between the start of this minimum historical reference period and the implementation of the project activity. In case of hydro power plants, one of the following conditions apply: - The project activity is implemented in an existing reservoir, with no change in the volume of reservoir; or - The project activity is implemented in an existing reservoir, where the volume of reservoir is increased and the power density of the project activity, as per definitions given in the Project Emissions sections under the methodology, is greater than 4W/m2; or - The project activity result in new reservoirs and the power density of the power plant, as per definitions given in the Project Emissions sections under the methodology, is greater than 4W/m2. The methodology is not applicable to the following: - Project activities that involve switching from fossil fuels to renewable energy resources at the site of project activity, since in this case the baseline may be the continued us use of fossil fuels at the site; - Biomass fired power plants; - Hydro power plants that result in new reservoirs or increase in The proposed project activity involves wind power capacity addition and use Option 2 for the calculation of EGPJ,y, where EGPJ,y = EGPJ_ADD,y. Since the proposed project is the capacity addition to a wind power plant, this criteria is not applicable to the proposed project activity. The proposed project is the capacity addition to a wind power plant and not involving switching from fossil fuels to renewable energy resources neither involved in biomass fired power plants. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 10 existing reservoirs where the power density of the power plant is less than 4W/m2. Based on the above arguments it could be concluded that the methodology ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” version 12.1.0 is applicable to the proposed project activity. In addition, the methodologies also refer to several tools described under section B.1 “Title and reference of the approved baseline and monitoring methodology applied to the project activity”. The applicability of these tools has been discussed below: Applicability of “Tool for the demonstration and assessment of additionality” v 05.2: The tool for demonstration and assessment of additionality provides a general framework demonstrating and assessing additionality and is applicable to a wide range of project types. As referred in ACM0002, the additionality tool is applicable for the proposed project activity. Applicability of “Tool to calculate the emission factor for an electricity system” v 02.2: This methodological tool determines the CO2 emission factor for displacement of electricity generated by power plants in an electricity system, by calculating the “combined margin” emission factor (CM) of the electricity system. This tool maybe applied to estimate the OM, BM and/or CM when calculating baseline emissions for a project activity that substitutes grid electricity. As the proposed project activity supplies electricity to the national grid, the “Tool to calculate the emission factor for an electricity system” v 02.2 is applicable to the project activity. B.3. Description of the sources and gases included in the project boundary: >> Spatial Boundary: As per ACM0002 version 12.1.0, the spatial extent of the proposed project boundary includes the project power plant and all power plants connected physically to the electricity system, which the proposed project activity is connected to13. Emission Sources: The greenhouse gases and emission sources included in or excluded from the project boundary are shown in Table 2 as followed: Table 3 Emission sources included in or excluded from the project boundary Source Gas Included? Justification/Explanation CO2 emissions from CO2 Yes Main emission source Baseline electricity generation in CH4 No Minor emission source fossil fuel fired power N2O No Minor emission source plants that are displaced 13 Reference: Turkish National Grid Line Diagram http://www.teias.gov.tr/4grupmd/atcharita.htm PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 11 Project activity due to the project activity. For geothermal power plants, fugitive emissions of CH4 and CO2 from noncondensable gases contained in geothermal steam. CO2 emissions from combustion of fossil fuels from electricity generation in solar thermal power plants and geothermal power plants For hydro power plants, emissions of CH4 from the reservoir CO2 CH4 N2O CO2 CH4 N2O CO2 CH4 N2O No No No No No No Since the proposed project activity involves energy generation from wind energy, project emissions from project activity is assumed to be zero. This is also in line with the requirements of ACM0002 (version 12.1.0) No No No Figure 2: Project Boundary Existing Power Plant 34.2 MW Private Electricity Meter Capacity Addition (Proposed Project Activity) 20 MW Private Electricity Meter TEIAS Electricity Meter Akhisar Transformer Station Electricity System Project Boundary PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 12 B.4. Description of how the baseline scenario is identified and description of the identified baseline scenario: >> The proposed project activity is a capacity addition to an existing grid-connected renewable power plant/unit. The baseline scenario in accordance with ACM0002 v12.1.0 is defined as followed: In the absence of the proposed VER project activity, the existing facility will continue to supply electricity to the grid at historical levels. Since the project activity is based on wind energy and Option 2 is chosen for the determination of EGPJ,y, the baseline scenario for the proposed project is the equivalent annual net electricity generation supplied to the grid by the power units that have been added under the project activity. B.5. Description of how the anthropogenic emissions of GHG by sources are reduced below those that would have occurred in the absence of the registered CDM project activity (assessment and demonstration of additionality): >> Timeline of the Project: An overview of the implementation time line of the proposed project is presented in table 3 as followed: Table 4 Timeline of the proposed project activity Event Actual / Expected Revision of the Generation License Actual Board Decision on VER Project Actual Development Local Stakeholders Meeting Actual Turbine Purchase Contract Expected Start of Construction Expected Project Commissioning Expected Date 08.04.2010 15.01.2010 06.06.2011 Q4 2011 Q4 2011 Q3 2012 Based on the events listed above, the project entity has been aware of the VER and the decision was based on VER revenues taken into account. The potential carbon revenue was vital for the project owner to go ahead with the implementation of the proposed project activity. Approved consolidated baseline methodology ACM0002 “Consolidated baseline methodology for gridconnected electricity generation from renewable sources” version 12.1.0, requires the use of the latest “Tool for demonstration and assessment of additionality” (v05.2.1) agreed by the CDM Executive Board to demonstrate and assess the additionality of the proposed project. The tool provides for a step-wise approach to demonstrate and assess additionality. These steps include: • Identification of alternatives to the project activity; • Investment analysis to determine that the proposed project activity is either 1) not the most economical or financial attractive, or 2) not economically or financially feasible; • Barrier analyses; and • Common practice analysis. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 13 Step 1. Identification of alternatives to the project activity consistent with current laws and regulations According to CDM Validation and Verification Manual14 (version 01.2), the PDD shall identify credible alternatives to the project activity in order to determine the most realistic baseline scenario, unless the approved methodology that is selected by the proposed CDM project activity prescribes the baseline scenario and no further analysis is required. Alternatives to the proposed project is not needed to be identified as the baseline scenario has been prescribed according to ACM0002 (v12.1.0) under section B.4. Step 2. Investment analysis According to “Tool for the demonstration and assessment of additionality” version 5.2.1, the economical or financial attractiveness of the proposed project should be determined without taking into consideration the VER revenues. It should be noted that the guidance provided by the Executive Board on investment analysis has been taken into account15. The following sub-steps are conducted in order to do the investment analysis. Sub-step 2a. Determination of an appropriate analysis method: According to “Tool for the demonstration and assessment of additionality” version 5.2.1, simple cost analysis can only be applied to projects that do not generate any other financial benefits than the VER related incomes. Considering that the electricity produced by the proposed project will be sold to the national grid and is expected to create revenues, the simple cost analysis is discarded. A benchmark analysis (option III) has been chosen as the appropriate analysis method. Sub-step 2b. Option III. Apply benchmark analysis The following benchmark analysis applies the equity IRR as financial indicator. The Equity IRR is considered to be a suitable and widely used financial indicator to determine the attractiveness of equity investments. When analysing a potential project, investors compare the equity IRR of the project against their required rate of return. The approach to determine the benchmark against which the equity IRR shall be evaluated is option (a) from the “Tool for the demonstration and assessment of additionality” (Version 05.2.1): "Government bond rates, increased by a suitable risk premium to reflect private investment and/or the project type, as substantiated by an independent (financial) expert or documented by official publicly available financial data; ..." 14 Reference: CDM Validation and Verification Manual, page 20 paragraph 105 15 Reference: “Guidelines on The Assessment of Investment Analysis” version 3, EB 51 Annex 58. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 14 In line with the requirements of “Tool for the demonstration and assessment of additionality” (Version 05.2.1) and its supporting guidelines, the expected return on equity is calculated based on; risk free rate, equity risk premium and the country risk premium. Risk Free Rate: The risk free rate of return is the best rate that does not involve a risk. Both the return of the original capital and the payment of interest are completely certain. Government bonds are considered a risk free investment option, and their yields can be seen as a risk free rate of return. TCMB (Central Bank of Turkey) publishes Financial Stability Report periodically, which also includes data on long term bond rates. The latest and most up to date report is from March 2011. According to the official report the bond rates are 6.5%16. Equity Risk Premium: The equity risk premium is the historical risk premium for a mature equity market. The US stock return over a long term provides the most ideal figure since this is by far the largest and most liquid market and one which provides data over the longest term. A value of 6.5% is used for the equity risk premium17. Country Risk Premium: The risk premium for the host country is derived from Moody’s rating for Turkey. Turkey has a long-term rating of Ba2 which corresponds to a country risk premium of 4.1%18. Based on the above data set the required rate of return could be calculated as 17.1% for Turkey. Table 6 Benchmark for Turkey Parameter Value Risk Free Rate 6.5% Equity Risk Premium 6.5% Country Risk 4.1% Premium Required Rate of Return 17.1% 16 Reference: TCMB Financial Stability Report March 2011 Section II page 16 http://www.tcmb.gov.tr/yeni/evds/yayin/finist/bolumII-12.pdf 17 Reference: Guidelines on the assessment of investment analysis version 5 http://cdm.unfccc.int/Reference/Guidclarif/reg/reg_guid03.pdf 18 Reference: New York University Stern School of Business, Risk Premiums for other markets July 2011 http://www.stern.nyu.edu/~adamodar/pc/datasets/ctrypremjuly11.xls PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 15 Sub-step 2c: Calculation and comparison of financial indicators The main financial indicators are presented in the below table: Table 5 Key parameters applied in the calculation of the proposed project’s equity IRR: Parameter Unit Value Total investment € 24,000,000 Loan % 85 Equity % 15 General Overheads € / year average 900,000 Yearly electricity Generation GWh/year 55 Installed capacity MW 20 Electricity feed in tariff €cent/kWh 5.07 €cent/kWh Corporate Tax % 20 The key assumptions for the calculation of the equity IRR are as follows: - - - The calculation of the equity IRR of the proposed project activity includes all relevant costs and revenues19. The revenue from yearly electricity generation is based on the guaranteed feed in tariff applicable at the time of the investment decision20. According to the Law, the guaranteed feed in tariff for electricity generated from wind energy is 7.3 USDcent/kWh, which corresponds to approximately 5 €cent/kWh21 for the first 10 year period. For the remaining years a conservative market price of 6€cent/kWh has been applied. Input values used in the investment analysis are values valid and applicable for 2011. Only the portion of investment costs which is financed by equity have been considered as the net cash outflow and the portion of the investment cost which is financed by dept have not been considered as a cash outflow. 8 €/tCO2eq value has been taken for the GS VER credits, which is an average price for the GS VERs in the market. The result of the equity IRR calculation with and without VER revenues are: Equity IRR without VERs -12% Equity IRR with VERs -2% It could be seen that the equity IRR of the project activity is below the financial benchmark of 17.1 % and cannot be considered to be a financially attractive alternative. With the introduction of expected revenues from VERs, although the equity IRR is still below the benchmark, the feasibility is increases, which has a positive impact on access to finance and has been the bases of the investment decision. 19 The full financial calculation is available to the DOE. 20 Reference: EMRA (Electricity Market Regulatory Authority) Law on Utilization of Renewable Energy Resources http://www.epdk.gov.tr/documents/10157/4b360128-53aa-4174-8104-a6c10434ac9c 21 As per 09.09.2011, the euro/dollar exchange rate is observed to fluctuate between 1.43 and 1.45 for the past three months. An average exchange rate of 1.44 €/USD has been used. Reference: Central Bank of Republic of Turkey http://www.tcmb.gov.tr/ PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 16 Sub-step 2d: Sensitivity Analysis The objective of the sensitivity analysis is to show whether the conclusion regarding the financial attractiveness is robust to reasonable variations in the critical assumptions. According to the Annex 5 of EB 62 “Guidelines on the assessment of Investment analysis” version 5, only variables including the initial investment cost, that constitute more than 20% of either total project costs or total project revenues should be subjected to reasonable variation. In line with the guidelines, important parameters for the feasibility of the proposed project activity are defined as total investment, electricity price, electricity generation and general overheads. The mentioned parameters have been tested with a range of ±10% for the sensitivity analysis. The following table demonstrates the results for a ±10% deviation of selected parameters which increase the equity IRR. Table 6 Sensitivity Analysis of the equity IRR with variations in total investment, electricity price, electricity generation, investment and general overheads. Parameter Value Applied Equity IRR Equity IRR Reached Reached Without VER WithVER 8,03 USDcent/kWh (+10%) 2% 8% Electricity Price 60,500 MWh/year (+10%) -4% 5% Electricity Generation 794,000 €/year average (-10%) -9% 0% General Overheads -6% 4% Total investment 21.6 million € (-10%) Discussion on the probability of the deviations: Electricity Price: One of the most important parameter that has an impact to the equity IRR of the project is the electricity sales price. For the sensitivity analysis the electricity price was increased 10% from the guaranteed price of 7,3 to 8,03 USDcent/kWh for the whole assessment period and observed that the equity IRR reaches to 2% without taking into the VER revenues and to 8% taking into account the VER revenues, which is still below the benchmark value. The Law on Utilization of Renewable Energy Resources, provides a guaranteed electricity tariff of 7.3 USDcent/kWh to the electricity generated from wind energy resources, which is applicable for a 10 year period. In addition to this guaranteed price, the Law also introduces an additional incentive to projects benefiting from local equipment in their project activity. According to the Law, wind energy projects using local equipment could be rewarded by a plus incentive as indicated under Table II of the Law on top of the guaranteed price of 7,3 USDcent/kWh. Although it is not for certain that the proposed project will be eligible for this plus incentive, since the blades and turbine masts used in the proposed project activity are produced locally, the project activity has a significant chance to be rewarded a +1.4 PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 17 USDcent/kWh22. This plus incentive will be applicable only for a 5 year period. If this would be the case the electricity tariff applicable to the project activity for the first 5 years will be 8.7 USDcent/kWh. If the equity IRR calculation is re-executed for this price the equity IRR reaches to -9%, which is within the sensitivity range. Electricity Generation: Another important parameter that has an impact on the equity IRR is the net electricity generation delivered to the electricity system. For the sensitivity analysis, the electricity generation is increased by 10% from the value of 55GWh/year to 60.5GWh/year and observed that the equity IRR reaches to -4% without taking into the VER revenues and to 5% taking into account the VER revenues, which is still below the benchmark value. It should be noted that the equity IRR doesn’t reach to the benchmark even with a net electricity generation of 74.25GWh/year, which corresponds to a 35% of increase. An average annual electricity generation of 55GWh/year has been estimated based on micro-siting23, which corresponds to a load factor of 31,4%. Since the existing capacity of 34.2 MW is operational since 2008, an accurate performance of the project location is known to the Project Participant. The actual readings indicate a capacity factor of approximately 27% load factor for the project and therefore an increase over 35% of the expected generation (corresponding to a load factor of 42%) is not realistic. General Overheads: The impact of a deviation in general overheads is relatively insignificant compared to changes in other parameters. For the sensitivity analysis, the general overheads are decreased by 10% from the value of approximately 900,000 €/year average to approximately 794,000 €/year average and observed that the equity IRR reaches to -9% without taking into the VER revenues and to 0% taking into account the VER revenues, which is still below the benchmark value. Even if the general overheads are considered to be “0”, the equity IRR does not reach to the benchmark. Total Investment: For the sensitivity analysis, the total investment costs are decreased by 10% from the value of 24 million € to 21.6 million € (approximately 1 million €/MW) and observed that the equity IRR reaches to -6% without taking into the VER revenues and to 4% taking into account the VER revenues, which is still below the benchmark value. The equity IRR cannot even reach to the benchmark when the total investment is considered to be as low as 16.8 million €s, which is 30% lower than the estimated investment. Taking into account the fact that the investment cost of an average turbine is 1.23 million/MW24, a major deviation from the estimated investment costs is not realistic. 22 According to Table II of the Law on Utilization of Renewable Energy Resources, +0.8 USDcent/kWh is rewarded for locally produced turbine blades and +0.6 USDcent/kWh is rewarded for locally produced turbine masts. 23 24 Technical feasibility is available to the DOE. Reference: EWEA (European Wind Energy Association) “Wind Energy –The Facts Report, page 13 Part III, The Economics of Wind Power. http://www.ewea.org/fileadmin/ewea_documents/documents/publications/WETF/1565_ExSum_ENG.pdf PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 18 Outcome of Step2: The sensitivity analysis shows that the equity IRR of the proposed project does not overcome the financial benchmark despite favourable conditions. The sensitivity analysis further substantiates that the project activity is not a financially attractive alternative and therefore additional. Step 3. Barrier analysis Sub-step 3a. Identify barriers that would prevent the implementation of the proposed CDM project activity: Without being registered as a VER project, the proposed project activity faces barriers that would prevent its implementation. The main barrier towards the implementation of the project activity could be characterized as “limited access to financing” due to unfavourable investment and financial structure which results in high risks and limited access to project financing. Limited access to project financing: Waste management projects need a high level of financing and long repayment periods. In the proposed project activity, it is envisaged that 85% of the investment will be realised with debt funding and 15% from equity. However the project participants face barriers to secure loan from finance institutions / creditor banks. The additional revenues from potential VER sales are considered to be an important revenue stream and play an important role on securing a debt funding. Wind energy investments are still perceived as investments with high risks and unfavourable investment and finance structure. Although there is a guaranteed electricity tariff for wind energy in Turkey, it is still not enough to secure an attractive feasibility and therefore extra revenues such as VERs are considered to have a positive impact on the bankability of the project from the creditors point of view. Outcome of Step 3a: “Investment Barriers” is identified as one of the major barriers that prevent the Project Participant from carrying out the proposed project activity Step 4: Common practice analysis Sub-step 4 a: Analyse other activities similar to the proposed project activity: As per the “Tool for the demonstration and assessment of the additionality” version 5.2.1, an analysis of any other activities that are operational and that are similar to the proposed project activity must be provided. Projects are considered similar if they are in the same country/region and/or rely on a broadly similar technology, are of similar scale, and take place in a comparable environment with respect to regulatory framework, investment climate, access to technology, access to financing, etc. The project activities have been tracked from EMRA (Electricity Market Regulatory Authority) Generation Licenses25. Currently there are 41 wind farm projects that are connected and operational in 25 Reference: EMRA / Development of Wind Energy in Turkey http://www2.epdk.org.tr/lisans/elektrik/yek/ruzgarprojeleriningelisimi.xls PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 19 Turkey26. The total installed capacity reaches to 1493 MW, which constitutes less than 3% of the total installed capacity of Turkey27. A list of the operational wind farms are presented below: Table 8. Operation wind farms in Turkey # Location Company 1 Đzmir - Çeşme 2 Çanakkale - Đntepe 3 Manisa - Akhisar 4 Çanakkale - Gelibolu 5 Manisa - Sayalar 6 7 8 9 Đstanbul – Çatalca Izmir - Aliağa Istanbul - Gaziosmanpaşa Izmir - Çeşme 10 Istanbul - Hadımköy 11 12 13 14 Đstanbul - Silivri Balikesir - Bandırma Balikesir - Şamlı Muğla - Datça 15 16 17 Hatay - Samandağ Aydın - Didim Çanakkale - Ezine 18 Balikesir - Susurluk 19 20 Osmaniye - Bahçe Izmir Bergama 21 Đzmir - Çeşme 22 23 Balıkesir - Bandırma Balikesir - Bandırma 26 Alize Enerji Elektrik Üretim A.Ş. Anemon Enerji Elektrik Üretim A.Ş. Deniz Elektrik Üretim Ltd. Şti Doğal Enerji Elektrik Üretim A.Ş. Doğal Enerji Elektrik Üretim A.Ş. Ertürk Elektrik Üretim A.Ş. Innores Elektrik Üretim A.Ş. Lodos Elektrik Üretim A.Ş. Mare Manastır Rüzgar Enerjisi Santrali San. Ve Tic. A.Ş. Sunjüt Sun’i Jüt San. ve Tic. A.Ş Teperes Elektrik Üretim A.Ş. Yapısan Elektrik Üretim A.Ş. Baki Elektrik Üretim Ltd Şti Dares Datça Rüzgar Enerji Santralı Sanayi ve Ticaret A.Ş Deniz Elektrik Üretim A.Ş. Ayen Enerji A.Ş. Alize Enerji Elektrik Üretim A.Ş. Alize Enerji Elektrik Üretim A.Ş. Rotor Elektrik Üretim A.Ş. Ütopya Elektrik Üretim Sanayi ve Ticaret A.Ş. Mazı-3 Rüzgar Enerjisi Santrali Elektrik Üretim A.Ş. Akenerji Elektrik Üretim A.Ş. Borasco Enerji ve Kimya Installed Capacity (MW) Business Model28 1.5 BOT 30.4 VER 10.8 VER 14.9 VER 34.2 VER 60 42.5 24 39.2 VER VER VER VER 1.2 BOT 0,85 30 90 29.6 VER VER VER VER 30 31.5 20.8 VER VER VER 20.7 VER 135 30 VER VER 30 VER 15 57 VER VER As per 17.08.2011. 27 The total installed capacity of Turkey is 44,761 MW for year 2009. Reference: TEIAS (Turkish Electricity Transmission CO) Annual development of Turkeys Installed capacity 2009 http://www.teias.gov.tr/istatistik2009/1.xls 28 Reference: Gold Standard Foundation VER Project Registry Page https://gs1.apx.com/myModule/rpt/myrpt.asp?r=111 PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 20 24 Manisa - Soma 25 26 Hatay - Belen Tekirdağ - Şarköy 27 Izmir – Urla 28 Balıkesir - Bandırma 29 30 Mersin Mut Edirne - Enez 31 Izmir - Bergama 32 Hatay - Belen 33 Hatay - Samandağ 34 Manisa - Soma 35 Manisa – Kırkağaç 36 Çanakkale - Ezine 37 38 39 40 Aydin - Çine Çanakkale - Ezine Balikesir - Susurluk Balikesir – Havran 41 Balikesir - Bandırma Sanayi ve Ticaret A.Ş. Soma Enerji Elektrik Üretim A.Ş. Belen Elektrik Üretim A.Ş. Alize Enerji Elektrik Üretim A.Ş. Kores Kocadağ Rüzgar Enerji Santralı Üretim A.Ş. As Makinsan Temiz Enerji Elektrik Üretim San. ve Tic. A.Ş. Akdeniz Elektrik Üretim A.Ş. Boreas Enerji Üretim Sistemleri A.Ş. Bergama RES Enerji Üretim A.Ş. Bakras Enerji Elektrik Üretim ve Tic. A.Ş. Ziyaret RES Elektrik Üretim San. ve Tic. A.Ş. Bilgin Rüzgar Santrali Enerji Üretim A.Ş. Alize Enerji Elektrik Üretim A.Ş. Garet Enerji Üretim ve Ticaret A.Ş. Sabaş Elektrik Üretim A.Ş. Enerjisa Enerji Üretim A.Ş. Alentek Enerji A.Ş. Alize Enerji Elektrik Üretim A.Ş. Galata Wind Enerji Ltd. Şti TOTAL 79.2 VER 36 28.8 VER VER 15 VER 24 VER 33 15 VER VER 90 VER 15 VER 35 VER 90 VER 25.6 VER 22.5 VER 24 29.9 45 16 VER VER VER VER 90 VER 1493.15 In line with the requirements of the “Tool for the demonstration and assessment of the additionality” version 5.2.1, the following scope of assessment has been applied in selecting the “similar project activities”: - Turkey as the geographical scope - Project activities with an installed capacity over 2 MW (project activities with an installed capacity smaller than 2 MW could be considered as pilot or demo project since it only involves 1 or 2 turbine units) - In line with the requirements of the tool, VER project activities will be excluded from the common practice analysis29. Based on the above information it is clear that there are no similar project activities in Turkey, which are not developed with a business model excluding VER revenues, hence it can be concluded that wind projects are not a common practice and the technology has not yet diffused in Turkey. 29 The term CDM and UNFCCC under the tool is interpreteed as VER and Gold Standard respectively (Sub step 4a: Analyze other activities similar to the proposed Project activity). PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 21 Substep 4 b: Discuss any similar options that are occurring: There are no similar options occurring which do not rely on VER revenues for their implementation. The proposed project activity is therefore not common practice and hence proves to be additional. B.6. Emission reductions: B.6.1. Explanation of methodological choices: >> The emission reductions for the proposed project activity are calculated according to ACM0002 “Consolidated baseline methodology for grid connected electricity generation from renewable sources” version 12.1.0. Emission Reductions The emission reductions are calculated based on the following formula: ER y = BEY − PEY Where: ERy BEy PEy (1) Emission reductions in year y (tCO2e/year) Baseline emissions in year y (tCO2e/year) Project emissions in year y (tCO2e/year) Project Emissions In accordance with the methodology ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” (version 12.1.0), no project emissions need to be considered. Project emissions apply only for geothermal power plants, solar thermal power plants and for some hydro power plants. Therefore PEy = 0 Baseline Emissions According to the methodology ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” (version 12.1.0), baseline emissions include only CO2 emissions from electricity generation in fossil fuel fired power plants that are displaced due to the project activity. The methodology assumes that all project electricity generation above baseline levels would have been generated by existing grid-connected power plants and the addition of new grid-connected power plants. The baseline emissions are calculated as follows: BE y = EG PJ , y ⋅ EFgrid ,CM Where: (2) PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 22 BEy EG PJ,y EFgrid,CM = Baseline emissions in year y (tCO2/year) = Quantity of net electricity generation that is produced and fed into the grid as a result of the implementation of the CDM project activity in year y (MWh/yr) = Combined margin CO2 emission factor for grid connected power generation calculated using the latest version of the “Tool to calculate the emission factor for an electricity system”. The combined margin is calculated ex-post and has been fixed for the first crediting period. Calculation of EGPJ,y The calculation of EGPJ,y is different for (a) greenfield plants; (b) retrofits and replacements and; (c) capacity additions. Since the proposed project activity falls under the description capacity addition, the following method has been adopted. Capacity addition to an existing renewable energy power plant In case of wind energy, it is assumed that the addition of new capacity does not significantly affect the electricity generated by existing power plant(s) or unit(s). In this case, the electricity fed into the grid by the added power plant(s) or unit(s) could be directly metered and used to determine EGPJ,y. If the project activity is a capacity addition, project participants may use one of the following options to determine EGPJ,y: Option 1: Use the approach applied to retrofits and replacements as described in the ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” (version 12.1.0). EGFacility,y corresponds to the total electricity generation of the existing plant(s) or unit(s) and the added plant(s) and unit(s). A separate metering of the electricity fed into the grid by the added plant(s) or unit(s) is not necessary under this option. Option 2: For wind, solar, wave and tidal power plant(s) or unit(s), the following approach can be used provided that the electricity fed into the grid by the added power plant(s) or unit(s) addition is separately measured: EG PJ , y = EG PJ _ ADD , y Where: EGPJ,y EGPJ_ADD,y (3) Quantity of net electricity generation that is produced and fed into the grid as a result of the implementation of the VER project activity in year y (MWh/yr) Quantity of net electricity generation supplied to the grid in year y by the project plant/unit that has been added under the project activity (MWh/yr) The Project Participants choose Option 2, and the electricity fed into the grid by the added power plant(s) or unit(s) addition will be separately measured. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 23 Leakage In line with the requirements of ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” (version 12.1.0), no leakage emissions are considered. The main emissions potentially giving rise to leakage in context of electric sector projects are emissions arising due to activities such as power plant construction and upstream emissions from fossil fuel use (e.g. extraction, processing and transport). These emission sources are neglected. Calculation of EFgrid,CM As referred in ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” (version 12.1.0), EFgrid,CM is calculated according to the “Tool to calculate the emission factor for an electricity system” version 02.2.0. This tool provides the following steps to calculate combined margin (CM) emission factor: Step 1. Identify the relevant electric systems; Step 2. Choose whether to include off-grid power plants in the project electricity system (optional); Step 3. Select an operating margin (OM) method; Step 4. Calculate the operating margin emission factor according to the selected method; Step 5. Calculate the build margin (BM) emission factor. Step 6. Calculate the combined margin (CM) emissions factor. Step 1. Identification of the relevant electric power system According to the “Tool to calculate the emission factor for an electricity system” (version 02.2), a project electricity system has to be defined by the spatial extent of the power plants that are physically connected through transmission and distribution lines to the project activity and that can be dispatched without significant transmission constraints. Similarly, a connected electricity system, e.g. national or international, is defined as an electricity system that is connected by transmission lines to the project electricity system. Power plants within the connected electricity system can be dispatched without significant transmission constraints but transmission to the project electricity system has significant transmission constraint. The transmission lines in Turkey are operated by TEĐAŞ (Turkish Electricity Transmission CO), which is a state owned company. The grid is 48.971 km long and constitutes of 606 transformer stations with a total transformer capacity of 98,852 MVA and 10 interconnections to neighbour countries30. The interconnected grid system is operated continuously and there are no electricity price differences throughout the regions31. Therefore the relevant electric power system is defined as the national grid system of Turkey. 30 In compliance with the requirements of the applicable tool, the emission factor from neighbouring countries is considered 0 tCO2eq/MWh for determining the OM. 31 Reference: TEIAŞ (Turkish Electricity Transmission Co) official webpage http://www.teias.gov.tr/ PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 24 Step 2. Choose whether to include off-grid power plants in the project electricity system (optional). According to the applicable tool, Project Participants may choose between the following two options to calculate the operating margin and build margin emission factor: Option I: Only grid power plants are included in the calculation. Option II: Both grid power plants and off-grid power plants are included in the calculation. The Project Participant chooses Option I and therefore only grid power plants are included in the calculation. Step 3. Selection of an operating margin (OM) method According to the applicable methodological tool, the operating margin emission factor (EF grid, OM, y) is based on one of the following methods: a) b) c) d) Simple OM; or Simple adjusted OM; or Dispatch data analysis OM; or Average OM. Options b) and c) are not selected since there is no data available for these options. Option d) is not selected since low-cost/must-run resources do not constitute more than 50% of total grid generation. According to the tool, Simple OM can only be if low-cost/must-run resources constitute less than 50% of total grid generation. The low-cost/must-run resources include hydro, geothermal, wind, low-cost biomass, nuclear, and solar power generation. The share of the installed capacity of renewable energy sources excluding hydro power is 1.1% of the total electricity generation and is therefore not taken into consideration. There is no indication that coal is used as a must-run and no nuclear energy plants are located in Turkey. That leaves hydro power as the only relevant low-cost must run source for electricity. The electricity generation from hydro power is 18.5% of the total electricity generation. Therefore the requirements for the use of the Simple OM calculations are satisfied. Table 9 Breakdown by sources of the electricity generation from the Turkish grid, 200932 2009 Generation Power plants by fuel type Generation (MWh) Natural Gas 96,094,700 Coal 55,685,100 Hydro power 35,958,400 Fuel Oil 4,803,500 Geothermal + Wind 1,931,100 Other Renewable 340,100 Total 194,812,900 32 Share (%) 49.3 28.6 18.5 2.5 1 0.1 100 TEIAS (Turkish Electricity Transmission Company) 2009: http://www.teias.gov.tr/istatistik2009/32(75-09).xls PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 25 For the simple OM, the emissions factor can be calculated using either of the two following data vintages: • Ex ante option: If the ex ante option is chosen, the emission factor is determined once at the validation stage, thus no monitoring and recalculation of the emissions factor during the crediting period is required. For grid power plants a 3-year generation-weighted average, based on the most recent data available at the time of submission of the VER-PDD to the DOE for validation. • Ex post option: If the ex post option is chosen, the emission factor is determined for the year in which the project activity displaces grid electricity, requiring the emissions factor to be updated annually during monitoring. For the proposed project activity the ex ante option is selected. Data for calculating the three year average is obtained from the period 2007 – 2009 which are the most recent data available at the time of submission of the PDD to DOE.33 Step 4. Calculating the operating margin emission factor according to the selected method The simple OM emission factor is calculated as the generation-weighted average CO2 emissions per unit net electricity generation (tCO2e/MWh) of all generating power plants serving the system, not including low-cost / must-run power plants / units. It may be calculated: Option A: Based on the net electricity generation and a CO2 emission factor of each power unit; or Option B: Based on the total net electricity generation of all power plants serving the system and the fuel types and total fuel consumption of the project electricity system. As the fuel consumption and the average efficiency data for each power plant / unit is not available Option B is used for simple OM calculation.34 Option B: Calculation based on total fuel consumption and electricity generation of the system As Option B is used, the simple OM emission factor is calculated based on the net electricity supplied to the grid by all power plants serving the system, not including low-cost/must run power plants/units, and based on the fuel type(s) and total fuel consumption of the project electricity system as follows: ∑ FC i, y EFgrid ,OMsimple, y Where: EFgrid,OMsimple,y FCi,y × NCVi , y × EFCO2 ,i , y i EGy (4) Simple operating margin CO2 emission factor in year y (tCO2/MWh) Amount of fossil fuel type i consumed in the project electricity system in year y (mass 33 The index “y” in the equations refers to the years 2007-2009 to calculate the emission factor ex-ante. 34 There are no nuclear power plants in Turkey and the share of the renewable energy is very small. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 26 NCVi,y EFCO2, i,y EGy i y or volume unit) Net calorific value (energy content) of fossil fuel type i in year y (GJ / mass or volume unit) CO2 emission factor of fossil fuel type i in year y (tCO2/GJ) Net electricity generated and delivered to the grid by all power sources serving the system, not including low-cost/must run power plants/units, in year y (MWh) All fossil fuel types combusted in power sources in the project electricity system in year y The three most recent years for which data is available at the time of submission of the PDD to the DOE for validation (ex-ante option) For this approach (simple OM) to calculate the operating margin, subscript m refers to the power plants/units delivering electricity to the grid, not including low-cost/must run power plants/units, and including electricity imports to the grid. Step5. Calculation of the build margin emission factor In terms of vintage of data, project participants can choose between one of the following two options: Option 1: For the first crediting period, calculate the build margin emission factor ex ante based on the most recent information available on units already built for sample group m at the time of VER PDD submission to the DOE for validation. For the second crediting period, the build margin emission factor should be updated based on the most recent information available on units already built at the time of submission of the request for renewal of the crediting period to the DOE. For the third crediting period, the build margin emission factor calculated for the second crediting period should be used. This option does not require monitoring the emission factor during the crediting period. Option 2: For the first crediting period, the build margin emission factor shall be updated annually, ex post, including those units built up to the year of registration of the project activity or, if information up to the year of registration is not yet available, including those units built up at the latest year for which information is available. For the second crediting period, the built margin emission factor shall be calculated ex ante, as described in Option 1 above. For the third crediting period, the built margin emission factor calculated for the second crediting period should be used. For the proposed project activity the Project Participant chooses Option 1 in terms of vintage of data. The sample group of power units m used to calculate the build margin should be determined as per the following procedure, consistent with the data vintage selected above: (a) Identify the set of five power units, excluding power units registered as VER project activities, that started to supply electricity to the grid most recently (SET5-units) and determine their annual electricity generation (AEGSET-5-units, in MWh). (b) Determine the annual electricity generation of the project electricity system, excluding power units registered as VER project activities (AEGtotal, in MWh). Identify the set of power units, excluding power units registered as VER project activities, that started to supply electricity to the grid most recently and that comprise 20% of total AEGtotal (if 20% falls on part of the generation PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 27 of a unit, the generation of that unit is fully included in the calculation) (SET>20%) and determine their annual electricity generation (AEGSET>20%, in MWh); (c) From SET5-units and SET>20% select the set of power units that comprise the larger annual electricity generation (SETsample); Identify the date when the power units in SETsample started to supply electricity to the grid. If none of the power units in SETsample started to supply electricity to the grid more than 10 years ago, then use the SETsample to calculate the build margin. The most recent information available belongs to 2009 and based on TEIAŞ statistics which is the official information source for the grid35. According to TEIAŞ figure, the annual electricity generation of the project electricity system excluding power units registered as VER project activities (AEGtotal) is 194,912,900 MWh36. Based on the AEGtotal, the set of power units, excluding power units registered as VER project activities, that started to supply electricity to the grid most recently and that comprise 20% of total AEGtotal, have been defined and the AEGSET>20% is determined as 39,022,327 MWh37 and includes 239 units of power plants under SET>20%. Without the need of any further assessment it can be concluded that the SET5-units << SET>20% and therefore the SET>20% is selected as SETsample38 for the calculation of the build margin (BM)39. The built margin (BM) emission factor is the generation-weighted average emission factor (tCO2/MWh) of all power units m during the most recent year y for which power generation data is available40, calculated as follows: ∑ EG × EF = ∑ EG m, y EFgrid , BM , y EL , m , y m m, y m Where: EFgrid,BM,y EGm,y 35 (5) Build margin CO2 emissions factor in year y (tCO2/MWh) Net quantity of electricity generated and delivered to the grid by power unit m in year y (MWh) Reference: www.teias.gov.tr 36 Reference: Turkish Electricity Transmission Co / http://www.teias.gov.tr/istatistik2009/41.xls 37 Reference: Turkish Electricity Transmission Company / http://www.teias.gov.tr/istatistikler.htm; year 2009-20082007-2006. 38 None of the power units in SETsample started to supply electricity to the grid more than 10 years ago. 39 Please refer to Annex 3 of the PDD for more detailed information on SETsample. 40 The most recent year for which power generation data is available is 2009. Reference: TEIAŞ Generation and Transmission Statistics www.teias.gov.tr PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 28 EFEL,m,y m y CO2 emission factor of the power unit m in year y (tCO2/MWh) Power units included in the build margin Most recent historical year for which power generation data is available As per the “Tool to calculate the emission factor for an electricity system” (version 02.2.0), the CO2 emission factor of each power unit m (EFEL,m,y) should be determined as per the guidance from the tool in step 4 for simple OM, using options A1, A2 or A3, using for y the most recent historical year for which power generation data is available, where m is the power units included in the build margin. As plant specific fuel consumption data is not available for Turkey, option A2 has been selected for the calculation of the CO2 emission factor of each power unit m (EFEL,m,y) as follows: EFEL ,m, y = Where: EFELm,y EFCO2,m,i,y ηm,y m y EFCO2 ,i , y ⋅ 3.6 η m, y (6) CO2 emission factor of the power unit m in year y (tCO2/MWh) Average CO2 emission factor of fuel type i used in power unit m in year y (tCO2/GJ) Average net energy conversion efficiency of power unit m in year y (ratio) All power units serving the grid in year y except low-cost/must-run power units The most recent year for which power generation data is available at the time of submission of the VER-PDD to the DOE for validation (ex-ante option) Where several fuel types are used in the power unit, the lowest CO2 emission factor for EFCO2,m,i,y has been used. Step 6. Calculation of the combined margin emission factor According to the applicable methodological tool, the calculation of the combined margin (CM) emission factor (EFgrid, CM) is based on one of the following methods: (a) Weighted average CM; or (b) Simplified CM. In line with the requirements of the applicable tool, the Project Participant chooses option (a), weighted average CM. The combined margin emissions factor is calculated as follows: EFgrid ,CM , y = EFgrid ,OM , y ⋅ wOM + EFgrid , BM , y ⋅ wBM Where: EFgrid,CM,y EFgrid,OM,y (7) Combined Margin emission factor (tCO2/MWh) Operating margin emission factor (tCO2/MWh) PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 29 EFgrid,BM,y wOM wBM Build margin emission factor (tCO2/MWh) Weight of the operating margin emission factor Weight of the build margin emission factor As stated in the “Tool to calculate the emission factor for an electricity system” (version 02.2.0), the default weights for the operating margin and build margin emission factors for wind power generation is defined as: wOM=0.75 wBM=0.25 for the first crediting period and for subsequent crediting periods. Changes required for the methodology implementation in 2nd and 3rd crediting periods At the start of the second and third crediting period the Project Proponents will address two issues as required by the applicable methodology: • Assess the continued validity of the baseline; and • Update the baseline as defined above B.6.2. Data and parameters that are available at validation: Data/ Parameter: Data unit: Description: Source of data used: Value applied: Justification of the choice of data or description of measurement methods and procedures actually applied: Any comment: Data/ Parameter: Data unit: Description: 41 ID.1 / EGgross MWh Gross electricity production by fossil fuel power sources (2007-2009) TEIAS (Turkish Electricity Transmission Company) The distribution of gross electricity generation by primary energy resources and the electricity utilities in Turkey (2007, 2008, 2009). http://www.teias.gov.tr/ist2007/40.xls http://www.teias.gov.tr/istatistik2008/41.xls http://www.teias.gov.tr/istatistik2009/37(06-09).xls See calculations of emission factor (B.6.1) According to “Turkish Statistics Law and Official Statistics Program”41 TEIAS, the Turkish Electricity Transmission Company is the official source for the related data, hence providing the most up-to-date and accurate information available. The average correction factor between gross/net generation is 95.8%. Its determination is presented in the Ex-ante calculation sheets. ID.2 / FCi,y m3 / tonnes (m3 for gaseous fuels) Amount of fossil fuel type i consumed in the project electricity system by TEIAS 2005: http://rega.basbakanlik.gov.tr/Eskiler/2005/11/20051118-1.htm PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 30 Source of data used: generation sources in year y (2007-2009) TEIAS (Turkish Electricity Transmission Company) Fuels consumed in thermal power plants in Turkey by the electricity utilities (2007-2009) Value applied: Justification of the choice of data or description of measurement methods and procedures actually applied: Any comment: See calculations of emission factor (B.6.1) According to “Turkish Statistics Law and Official Statistics Program” TEIAS, the Turkish Electricity Transmission Company is the official source for the related data, hence providing the most up-to-date and accurate information available. Data/ Parameter: Data unit: Description: Source of data used: ID.3 / NCVi,y GJ/tonnes (m3 for gaseous fuels) Net calorific value (energy content) of fossil fuel type i in year y TEIAS (Turkish Electricity Transmission Company) Heating values of fuels consumed in thermal plants in Turkey by the electricity utilities (2007- 2009) http://www.teias.gov.tr/istatistik2009/46.xls See calculations of emission factor (B.6.1) According to “Turkish Statistics Law and Official Statistics Program” TEIAS, Turkish Electricity Transmission Company is the official source for the related data, hence providing the most up-to-date and accurate information available Value applied: Justification of the choice of data or description of measurement methods and procedures actually applied: Any comment: Data/ Parameter: Data unit: Description: Source of data used: Value applied: Justification of the choice of data or description of measurement methods and procedures actually applied: Any comment: - ID.4 / EFC02,i,y tCO2/GJ CO2 emission factor of fossil fuel type i” used in power unit min year y IPCC default values at the lower limit of the uncertainty at a 95% confidence interval as provided in table 1.4 of Chapter 1 of Volume 2 (Energy) of the 2006 IPCC Guidelines for National Greenhouse Gas Inventory http://www.ipcc-nggip.iges.or.jp/public/2006gl/index.htm See calculations of emission factor (B.6.1) There is no information on the fuel specific default emission factor in Turkey, hence, IPCC values has been used as referred in the “Tool to calculate the emission factor for an electricity system (version 2)”. - PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 31 Data/ Parameter: Data unit: Description: Source of data used: Value applied: Justification of the choice of data or description of measurement methods and procedures actually applied: Any comment: Data/ Parameter: Data unit: Description: Source of data used: Value applied: Justification of the choice of data or description of measurement methods and procedures actually applied: Any comment: ID.5 / EGm,y MWh Net electricity generated by power plant/unit m TEIAS (Turkish Electricity Transmission Company) Generation units put into operation in 2006; 2007; 2008 http://www.teias.gov.tr/ist2006/8.xls, for 2006 http://www.teias.gov.tr/ist2007/8.xls, for 2007 http://www.teias.gov.tr/istatistik2008/8.xls, for 2008 Annex 3 Once for each crediting period using the most recent three historical years for which the data is available at the time of submission of the PDD to the DOE for validation. ID.6 / η m,y % Average net energy conversion efficiency of power unit m in year y “Environmental Map” published by Environmental Inventory Head Department under Ministry of Environment and Forestry / http://www.cedgm.gov.tr/CED/Files/cevreatlas%C4%B1/atlas_metni.pdf (p.197 table X.3.1; Thermal Plants and Environment) See calculations of emission factor (B.6.1) The average values of thermal plants in Turkey are taken from the report “Environmental Map” published by the Ministry of Environment and Forestry. - B.6.3. Ex-ante calculation of emission reductions: >> Estimation of emission reductions prior to validation According to “Consolidated baseline methodology for grid connected electricity generation from renewable sources” version 12.1.0, project participants should prepare an estimate of likely emission reductions for the proposed crediting period. This estimate is based on the same methodology as described under section B.6.1. Calculating the operating margin emission factor: The simple operating margin CO2 emission factor is calculated as per equation (4). PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 32 For the calculation of the Simple OM, the amount of fuel consumption (FCi, y) is taken from website of TEIAS, which is the official source of related data. The fuel consumption values for relevant years are as follows: Table10 Fuel consumption of generation sources connected to the grid (2007-2009) FCi, y Units 2007 2008 2009 3 Natural Gas 1000m 20,457,793 21,607,635 20,978,040 Lignite tonnes 61,223,821 66,374,120 63,620,518 Coal tonnes 6,029,143 6,270,008 6,621,177 Fuel Oil tonnes 2,312,360 2,315,183 1,783,366 Total 63,043,468 191,218,459 18,920,328 6,410,909 Turkish specific net calorific values (NCVi, y) values for fossil fuel types have been calculated, however, data from the IPCC Guidelines for National Greenhouse Gas Inventory have been used as the source of data for the emission factor of the fossil fuel types (EFCO2,i,y). The NCV and emission factors are as follows: Table11 NCV and emission factor of fossil fuel type NCVi (GJ/tonnes) 2007 2008 Natural Gas 36.765 36.634 Lignite 6.861 6.827 Coal 22.303 22.244 Fuel Oil 39.960 39.874 2009 37.177 6.427 22.215 40.091 EFCO2, i (tonnes/GJ) 0,054 0,091 0,095 0,073 The electricity delivered to the grid by all power sources serving the system, not including lowcost/must-run power plants/units (EGgross,y) is obtained from TEIAS (Turkish Electricity Transmission Company). The following table shows the gross electricity production for 2007-2009 produced by fossil fuel power sources. Table 12 Gross electricity generation by fossil fuel power sources 2007-2009 EGgross,y (MWh) 2007 2008 2009 Natural Gas 95,024,800 98,685,300 96,094,700 Lignite 38,294,700 41,858,100 39,089,500 Coal 15,136,200 15,857,500 16,595,600 Fuel Oil 6,526,800 7,518,500 4,803,500 Total 289,804,800 119,242,300 47,589,300 18,848,800 The gross electricity production includes the electricity consumption of the power plants. To be able to calculate the net electricity fed into the grid by specific fuel sources, an average correction factor had to be calculated from the overall gross/net electricity generation data. This relation is derived in in the following table. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 33 Table 13 Relation between net and gross electricity generation 2007-2009 2007 2008 Gross generation [MWh] 191,558,000 198,418,000 Net generation [MWh] 183,339,000 189,761,000 Relation 95.7% 95.6% Average correction factor 95.7% 2009 194,812,900 186,619,300 95.8% The net electricity delivered to the grid by the fossil fuel plants (EGnet,y) is calculated in Table 14. The calculation of EFgrid,OM,y requires the inclusion of electricity imports with an emission factor of 0 tCO2/GWh. By including the imports in the electricity production this requirement is fulfilled. Table 14 Net electricity generation by fossil fuel power plants and electricity imports 2007-2009 2007 2008 2009 Total Net electricity Natural Gas 90,951,136 94,454,712 91,975,170 277,381,017 production EGnet,y Lignite 36,653,026 40,063,665 37,413,753 114,130,444 (MWh) Coal 14,487,319 15,177,697 15,884,155 45,549,171 Fuel Oil 6,246,999 7,196,186 4,597,576 18,040,762 Electricity imports 864,300 789,400 812,000 2,465,700 Electricity supplied to grid EGy 149,202,780 157,681,659 150,682,654 457,567,094 Based on the above values, the simple operating margin CO2 grid emission factor (EFgrid,OMsimple,y) calculated through Equation 4 is 0.657 tCO2/MWh. Calculating the build margin emission factor The average CO2 emission factor of fuel types (EFCO2,m) and the average net energy conversion efficiency of the power plants (ηm,y) used for the calculation of emission factor of the power units (EFEL,m,y) through equation 6 are presented in the below table. Table 15 Emission factor of the power units Average emission factor EFCO2,m,i,y (tCO2/GJ) Natural Gas 0,054 Lignite 0,091 Coal 0,095 Fuel Oil 0,073 Hydro n.a. Wind n.a. Average conversion efficiency ηm,y 45.97% 32.68% 33.57% 33.19% n.a. n.a. Emission factor of the power unit EFEL,m,y (tCO2/MWh) 0.425 1.001 1.014 0.788 0 0 The data on the electricity generated and delivered to the grid by power units (EGm,y) are presented in the below table. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 34 Table 16 Electricity generated by the power units included in the build margin calculation EGm,y (MWh) 2005 2006 2007 2008 2009 Natural Gas 415,000 3,102,795 3,343,903 765,780 13,602,509 Lignite 0 7,020,000 3,084 0 3,000 Coal 0 0 0 0 1,923,333 Fuel Oil 52,000 0 722,473 16,362 4,331,777 Hydro 0 212,339 717,432 128,145 1,402,961 Other 0 69,448 0 0 1,189,986 renewable Total 467,000 10,404,583 4,786,892 910,286 22,453,566 Total 21,229,986 7,026,084 1,923,333 5,122,612 2,460,877 1,259,434 39,022,327 The build margin emission factor EFgrid,BM,y calculated through equation 5 is 0.565 tCO2/MWh. Calculating the combined margin emission factor The combined margin emission factor EFgrid,CM,y calculated through equation 7 is 0.634 tCO2/MWh. Project emissions In accordance with the methodology ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” (version 12.1.0), no project emissions need to be considered. PEy = 0 Leakage In line with the requirements of ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” (version 12.1.0), no leakage emissions are considered LEy=0 Calculating the baseline emissions The baseline emissions are calculated based on the quantity of net electricity generation supplied to the grid in year y by the project plant/unit that has been added under the project activity. The following simplified formula has been applied based on equation (2) and equation (3). BE y = EG PJ _ ADD , y ⋅ EFgrid ,CM Where: BEy EGPJ_ADD,y (8) Baseline emissions reductions in year y (tCO2/year) Quantity of net electricity generation supplied to the grid in year y by the project plant/unit that has been added under the project activity (MWh/yr) PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 35 EFgrid,CM Combined margin emission factor for grid connected power generation (tCO2/MWh) The proposed project activity is estimated to generate 54,404 MWh/year of electricity, which corresponds to 34,477 tCO2/year baseline emissions calculated through equation (8). Calculating the emission reductions As per equation (1), the annual emission reduction of the Project is estimated as 34,477 tCO2/year. B.6.4 Summary of the ex-ante estimation of emission reductions: >> Table 17 Ex-ante estimation of emission reductions, summary table Estimation of Estimation Estimation of Estimation of project activity of baseline leakage Years overall emission emissions emissions emissions reductions(tCO2e) (tCO2e) (tCO2e) (tCO2e) 2012 0 14,365 0 14,365 2013 0 34,477 0 34,477 2014 34,477 34,477 0 0 2015 0 34,477 34,477 0 2016 0 34,477 34,477 0 2017 0 34,477 34,477 0 2018 0 34,477 34,477 0 2019 0 20,111 0 20,111 Number of 7 crediting years Annual average over the crediting period (tCO2e/y) B.7. 34,477 Application of the monitoring methodology and description of the monitoring plan: B.7.1 Data and parameters monitored: Data / Parameter: Data unit: Description: Source of data to be ID.9/EGPJ_ADD,y MWh Quantity of net electricity generation supplied to the grid in year y by the project plant/unit that has been added under the project activity Project activity site PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 36 used: Value of data applied for the purpose of calculating expected emission reductions in section B.5 Description of measurement methods and procedures to be applied: QA/QC procedures to be applied: Any comment: 54,404 MWh The monitoring will be done by a private electricity meter, which will monitor the net electricity generation supplied to the grid by the project plant/unit that has been added under the project activity. The electricity will be measured continuously and recorded at least monthly. Maintenance and calibration of equipment will be carried out according to the instructions of the manufacturer. This is applicable as the proposed project activity involves energy generation from wind sources and option 2 in the baseline methodology is applied. B.7.2. Description of the monitoring plan: >> All monitoring procedures and requirements of the proposed project activity is in accordance with the methodology ACM0002 “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” (version 12.1.0). Metering: The quantity of net electricity generation supplied to the grid by the units that has been added under the project activity will be monitored continuously by a meter, which will be owned, installed and maintained by the Project Participant. The measurements will be made at the project site. Data obtained from measurements will be used in calculations of emission reductions. The losses before this point will be on the account of the project owner. Meter readings: Once a month, the project participant will perform data readings. The monthly results will be recorded by the project participant both manually and electronically. Data storage: Data will be stored electronically, during the crediting period and at least two years after the last issuance of credits for the wind farm project activity in the concerning crediting period. The Project Participant will be responsible for storage of data received from the measuring devices. Quality assurance and quality control: All metering devices will be calibrated by the project participant according to the specifications of the manufacturer. The specification of the meters will be in compliance with the requirements of the host country. Monitoring frequency: A high level of accuracy of the measurements will be achieved due to the use of high-precision equipment and due to strict compliance with the recommendations for calibration frequency of the equipment provider. Corrective actions and emergency preparedness: The Project Participant will regularly check the monitoring system on errors. In the case of errors, corrective actions will be undertaken by the Project Participant, or if required, by the supplier of the monitoring equipment. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 37 B.8. Date of completion of the application of the baseline study and monitoring methodology and the name of the responsible person(s)/entity(ies): >> Date of completing the final draft of this baseline section: 13/10/2011 Name of person/entity determining the baseline: The baseline has been prepared by OakDanışmanlık Company name: Visiting Address: Contact Person: Telephone number: E-mail: OakDanışmanlık Acıbadem Mah. Şemibey Sok. Belkıs Apt. N:3 D:6 Kadıköy / Istanbul, TURKEY Ömer Akyürek +90 216 3471671 [email protected] SECTION C. Duration of the project activity / crediting period C.1. Duration of the project activity: C.1.1. Starting date of the project activity: >> 01.11.2011 (Expected) C.1.2. Expected operational lifetime of the project activity: >> 49 years C.2. Choice of the crediting period and related information: C.2.1. Renewable crediting period: C.2.1.1. Starting date of the first crediting period: >> 01.08.2012 C.2.1.2. >> 7 years, renewable Length of the first crediting period: C.2.2. Fixed crediting period: C.2.2.1. >> Starting date: PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 38 C.2.2.2. Length: >> SECTION D. Environmental impacts >> D.1. Documentation on the analysis of the environmental impacts, including transboundary impacts: >> In line with the requirements of “Regulation on Environmental Impact Assessment”, the proposed project has been exempted from performing an Environmental Impact Assessment.42 D.2. If environmental impacts are considered significant by the project participants or the host Party, please provide conclusions and all references to support documentation of an environmental impact assessment undertaken in accordance with the procedures as required by the host Party: >> n.a. SECTION E. Stakeholders’ comments >> E.1. Brief description how comments by local stakeholders have been invited and compiled: >> As required by the Gold Standard a Local Stakeholders Consultation and a Feedback Round has to be undertaken by the project participant in order to encourage the stakeholders to express their opinion and incorporate it in the project. In this way, the project developer, together with the public, ensures a project going along the main principles of sustainability. For more details on both the Local Stakeholder Consultation (LSC) and the Stakeholder Feedback Round see the LSC report and the GS Passport43. Local Stakeholder Consultation (LSC) The proposed project activity is exempted from conducting an Environmental Impact Assesment (EIA) according to Turkish Law and Regulations however the project participant has organized a Local Stakeholders Meeting on 06.06.2011 in accordance with the requirements of the Gold Standard Foundation v2.1. The LSC meeting was held at Dualar Village near the project site. In general the participation to the meeting was good with more than 41 people and achieved a female participation of 50%. Before the meeting the following documents have been provided to the stakeholders: + Non-technical description of the project activity (also submitted along with the invitations); + Meeting evaluation forms; + Questionnaire regarding the sustainable development indicators and monitoring of the indicators along with the explanation of the indicators (also submitted along with the invitations). 42 Exemption letter has been provided to the validating DOE 43 Gold Standard v.12 rules and requirements are applicable to the proposed project activity. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 39 The meeting has started with introduction of the representatives of the Project Participant Mrs. Çağla Balcı Eriş and Mrs. Sıla Kılıç, explaining the aim of the meeting. Also a brief explanation was made with regards to the documents provided before the start of the meeting. The introduction followed by the explanation of the project activity, followed by a question and answer session. Since the proposed project activity is the extension of an existing power plant, the locals were quite informed about the activities. There were no concerns on the impact of the proposed project activity to sustainable development and environmental. Stakeholder Feedback Round (SFR) This section will be updated after the completion of the feedback round E.2. Summary of the comments received: >> The details of the Stakeholders Consultation Process could be found under the GS LSC Report and the GS Passport. E.3. Report on how due account was taken of any comments received: >> The details of the Stakeholders Consultation Process could be found under the GS LSC Report and the GS Passport. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 40 Annex 1 CONTACT INFORMATION ON PARTICIPANTS IN THE PROJECT ACTIVITY Organization: Street/P.O.Box: Building: City: State/Region: Postcode/ZIP: Country: Telephone: FAX: E-Mail: URL: Represented by: Title: Salutation: Last name: Middle name: First name: Department: Mobile: Direct FAX: Direct tel: Personal e-mail: Organization: Street/P.O.Box: Building: City: State/Region: Postcode/ZIP: Country: Telephone: FAX: E-Mail: URL: Represented by: Title: Salutation: Last name: Middle name: First name: Department: Polat Enerji Sanayi Ticaret A.Ş. Büyükdere Cad. Polat Holding Mecidiyeköy / Đstanbul 34387 Turkey +90 212 2136635 +90 212 2136639 www.polatenerji.com Sıla Kılıç Mrs. Kılıç Sıla [email protected] Demirer Enerji Üretim Sanayi ve Ticaret A.Ş. Mashar Osman Sokak 9/1 Feneryolu / Kadıköy, Đstanbul Turkey +90 216 3360148 +90 216 3300654 [email protected] Çağl Balcı Eriş Mrs. Eriş Balcı Çağla PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 41 Mobile: Direct FAX: Direct tel: Personal e-mail: [email protected] / [email protected] PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 42 Annex 2 INFORMATION REGARDING PUBLIC FUNDING No public funding from the Annex I countries is provided to the proposed project. PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 43 Annex 3 BASELINE INFORMATION SETsample 2009 Plant Name Fuel Type Ak Gıda San. Ve Tic. A.Ş. (Pamukova) Aksa Akrilik Kimya San. A.Ş. (Yalova) Aksa Enerji (Antalya) Aksa Enerji (Antalya) Aksa Enerji (Antalya) Aksa Enerji (Manisa) Antalya Enerji Arenko Elektrik Üretim A.Ş. (Denizli) Bil Enerji (DG+M)(Balgat) Cam İş Elektrik Çelikler Taah. İnş. (Rixox Grand) Dalsan Alçı San. Ve Tic A.Ş. Delta Enerji Üretim ve Tic. A.Ş. Delta Enerji Üretim ve Tic. A.Ş. Desa Enerji Elektrik Üretim A.Ş. E. Şehir. End. Enerji (DG+M)(Eskişehir-2) Ege Birleşik Enerji (LPG+DG+M)(Aliağa) Entek Köseköy (İztek) Entek Köseköy (İztek) Falez Elektrik Üretim A.Ş. Global Enerji (Pelitlik) Gül Enerji Elkt. Üret. Sn. Ve Tic. A.Ş. Habaş Aliağa Hayat Kağıt Kasar Dual Tekstil San. A.Ş. (Çorlu) Ken Kipaş Elektrik Üretim (Karen) Ken Kipaş Elkt. Ür. (Karen) (K.Maraş) Maksi Enerji EeLEKTRİK Üretim A.Ş. Marmara Pamuklu Mens. Sn. Tic. A.Ş. Mauri Maya San A.Ş. Mauri Maya San A.Ş. Modern Enerji (B. Karıştıran) MOSB Enerji Elektrik Üretim Ltd. Şti. Nuh Çimento San. Tic. A.Ş. Rasa Enerji (VAN) Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Added Installed Capacity MW 7.50 70.00 16.20 300.00 300.00 10.50 41.80 12.00 36.60 126.10 2.00 1.20 47.00 13.00 9.80 59.00 12.80 0.80 36.30 11.70 8.60 24.30 224.50 7.50 5.70 41.80 17.50 7.70 34.90 0.30 2.00 96.80 84.80 47.00 78.60 Generation MWh 61,000 539,000 124,740 2,310,000 2,310,000 83,144 302,096 84,000 255,000 1,008,000 16,000 9,000 365,817 101,183 70,000 452,000 107,000 6,366 288,876 88,000 65,665 170,000 1,796,000 56,000 38,000 180,000 75,359 55,000 271,533 2,478 16,522 595,702 329,000 500,000 PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 44 Selkasan Kağıt Paketleme Sönmez Elektrik (Uşak) Şahinler Enerji (Çorlu/Tekirdağ) TAV İstanbul Terminal İşletme A.Ş. TAV İstanbul Terminal İşletme A.Ş. Tesko Kipa Kitle Paz. Tic. Ve Gıda A.Ş. Yurtbay Elektrik Üretim A.Ş.(DG+M) Zorlu Enerji (B. Karıştıran) Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas 2009 Total Erdemir (Ereğli-Zonguldak) Habaş Bilecik Paşalar Habaş İzmir Habaş Petkim (Aliağa) Petkim (Aliağa) Silopi Elektrik Üretim A.Ş. Süper Film (G. Antep) Tire Kutsan (Tire) Tüpraş Rafineri (Aliağa/İzmir) Tüpraş O.A. Rafineri (Kırıkkale) Silopi Elektrik Üretim A.Ş. Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil 2009 Total Alkim Alkali Kimya Lignite Lignite 2009 Total İçdaş Çelik İçdaş Çelik Coal Coal Coal 2009 Total Akçay Hes Elektrik Üretim (Akçay HES) Akua Enerji (Kayalık Reg ve HES) Anadolu Elektrik (Çakırlar HES) Bağışlı REG ve HES (Ceykar Elekt.) Bağışlı REG ve HES (Ceykar Elekt.) Bereket Enerji (Koyul Hisar) Beyobası En. Ür. A.Ş. (Sırma HES) Cindere HES (Denizli) Değirmenüstü En (Kahramanmaraş) Denizli Elektrik (EGE I HES) Elestaş Elektrik (Yaylabel HES) Elestaş Elektrik (Yazı HES) Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro 9.90 8.70 26.00 3.30 6.50 2.30 6.90 49.50 1,909.40 73,000 67,057 185,000 27,612 54,388 18,000 50,000 394,970 13,602,509 39.20 18.00 36.00 222.00 52.00 44.80 25.30 8.00 24.70 10.00 135 615.00 240,000 144,000 288,000 1,554,000 364,000 315,000 203,000 37,000 171,777 70,000 945000 4,331,777 0.40 0.40 3,000 3,000 135.00 135.00 270.00 961,667 961,667 1,923,333 28.80 5.80 16.20 9.90 19.70 42.00 5.90 19.10 12.90 0.90 5.10 1.10 45,000 20,000 28,000 15,720 31,280 155,000 11,000 30,000 17,378 2,000 10,000 3,000 PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 45 Erva Enerji (Kabaca Reg ve HES) Erva Enerji (Kabaca Reg ve HES) Filyos Enerji (Yalnızca Reg ve HES) Kalen Enerji (Kalen I II HES) Karel Enerji (Pamukova) Kayen Alfa Enerji (Kaletepe HES) Kısık Lamas II IV HES (TGT Enerji Üretim) Obruk HES Öztay Enerji (Günayşe Reg ve HES) Özyakut Elek. Ür. A.Ş. (Güneşli HES) Özyakut Elek. Ür. A.Ş. (Güneşli HES) Reşadiye 3 HES (Turkon MNG Elekt.) Sarıtepe HES (Genel Dinamik Sis. El) Sarıtepe HES (Genel Dinamik Sis. El) Şirikçioğlu El. (Kozak Bendi ve HES) Taşova Yenidereköy HES (Hameka A.Ş.) Tektuğ (Erkenek) Tektuğ (Erkenek) Tocak I HES (Yurt Enerji Üretim Sn.) Tüm Enerji (Pınar Reg ve HES) Uzunçayır HES (Tunceli) Yapısan (Karıca Reg ve Darıca HES) Yapısan (Karıca Reg ve Darıca HES) Yeşilbaş Enerji (Yeşilbaş HES) ypm Gölova HES (Suşehri / Sivas) YPM Sevindik HES (Suşehri / Sivas) Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro 2009 Total 4.20 4.20 14.40 15.70 9.30 10.20 9.60 35.70 212.40 8.30 0.60 1.20 22.30 2.50 2.50 4.40 2.00 6.00 6.50 4.80 30.10 27.30 48.50 48.50 14.00 1.10 5.70 719.40 7,412 7,412 33,000 23,575 40,000 17,000 20,000 71,000 337,000 14,000 1,333 2,667 88,000 4,592 4,592 7,000 6,000 14,400 15,600 6,000 65,000 49,000 77,000 77,000 26,000 2,000 18,000 1,402,961 Gürmat Elektrik (Gürmat Jeotermal) Alize Enerji (Sarıkaya RES) (Şarköy) Baki Elektrik (Şamlı Rüzgar) Baki Elektrik (Şamlı Rüzgar) Belen Elektrik Belen Rüzgar-Hatay Belen Elektrik Belen Rüzgar-Hatay Borasko Enerji (Bandırma RES) Borasko Enerji (Bandırma RES) Cargill Tarım ve Gıda San. Tic. A.Ş. Ortadoğu Enerji (Kömürcüoda) Ortadoğu Enerji (Oda Yeri) Ortadoğu Enerji (Oda Yeri) Ütopya Elektrik (Düzova RES) Geothermal Wind Wind Wind Wind Wind Wind Wind Biogas Waste Waste Waste Wind Renewable 2009 Total 47.40 28.80 36.00 33.00 15.00 15.00 21.00 24.00 0.10 5.80 4.20 5.70 15.00 253.80 313,000 96,000 176,000 161,333 47,500 47,500 83,533 95,467 700 45,000 33,071 44,882 46,000 1,189,986.09 3,768.00 22,453,566 2009 Total PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 46 2008 Plant Name Fuel Type MB Şeker Nişasta San A.Ş Aksa Enerji (Antalya) Aksa Enerji (Manisa) Antalya Enerji (İlave) Ataç İnşaat San. A.S.B. (Antalya) Bahçivan Gıda (Lüleburgaz) Can Enerji (Çorlu Tekirdağ) (İlave) Four Seasons Otel (Atik Paşa Tur A.Ş.) Fritolay Gıda San. Ve Tic. A.Ş. (İlave) Melike Tekstil (Gaziantep) Misis Apre Tekstil Boya En. San. Modern Enerji (Lüleburgaz) Polat Turz (Polat Reniassance Ist. Ot.) Yıldız Sunta (Uzunçıftlik Köseköy) Sönmez Elektrik Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas 2008 Total Karkey (Silopi 5) (154kV) (İlave) Fuel Oil Fuel Oil 2008 Total Akköy Enerji (Akköy I HES) Alp Elektrik (Tınaztepe) Antalya Cansu Elektrik (Murgul/Artvin) Çaldere Elk. (Çaldere HES) Dalaman Muğla Daren HES Elkt. (Seyrantepe Barajı ve HES) Değirmenüstü En. (Kahramanmaraş) Gözede HES (Temsa Elektrik) Bursa H.G.M. Enerji (Keklicek HES) (Yeşilyurt) Hamzalı HES (Turkon MNG Elektrik) Hidro KNT. (Yukarı Manahoz Reg. Ve HES) İç-En Elk. (Çalkışla Regülatörü ve HES) Kalen Enerjş (Kalen II Regülat. Ve HES) Maraş Enerji (Fırnıs Regülatörü ve Hes) Sarmaşık I HES (Fetaş Fethiye Enerji) Sarmaşık II HES (Fetaş Fethiye Enerji) Torul Yeşil Enerji Elektrik (Tayfun HES) Zorlu Enerji (Mercan) Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro 2008 Total Added Installed Capacity MW 8.80 183.80 52.38 17.46 5.40 1.17 52.38 1.17 0.01 1.58 2.00 13.40 1.60 22.63 8.73 372.50 Generation MWh 0 133,736 79,183 85,341 10 0 255,164 0 0 0 5,324 70,453 490 136,018 61 765,780 14.78 14.78 16,362 16,362 101.94 7.69 9.18 8.74 49.70 25.70 2.40 8.67 16.70 22.40 7.66 15.65 7.22 21.04 21.58 105.60 0.82 1.28 433.97 21,608 9,245 12,518 11,153 14,370 0 6,107 120 2,936 13,772 3,364 10,281 0 1,472 1,221 18,551 0 1,427 128,145 PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 47 2008 Total 821,25 910.286 9.10 5.20 0.70 0.10 0.10 0.10 0.50 0.60 1.30 1.80 2.10 2.10 0.50 3.90 3.20 1.00 1.60 3.90 73.00 16.40 5.00 3.50 2.90 2.20 0.10 43.00 34.80 28.30 48.00 142.80 5.90 1.60 445.30 72,800 38,717 5,567 806 727 263 6,250 5,000 11,000 14,000 17,000 17,000 4,000 33,000 25,000 8,000 11,000 33,000 514,000 43,075 40,000 26,814 7,617 15,200 697 354,802 278,000 233,510 396,059 1,071,000 47,000 13,000 3,343,903 0.80 0.10 7.20 25.60 34.10 24.30 24.40 0.70 2,504 802 54,964 190,000 106,734 180,000 180,000 4,623 2007 HABAŞ (Aliağa-ilave) Moder Enerji Arenko Altınmarka Gıda Tekboy Enerji Velsan Akrilik Acıbadem Sağlık Kadıköy Acıbadem Sağlık Kozyatağı Acıbadem Sağlık Bursa Akateks Tekstil Sanayi Flokser Tekstil Poliser Flokser Tekstil Süetser Fritolay Gıda Kıvanç Tekstil Kil San Superboy Boya San Swiss Hotel TAV Esenboğa Nuh Enerji 2 Boğazlıyan Şeker Kartonsan Eskişehşir End. Enerji Eskişehir Şeker İgsaş Bil Enerji BİS Enerji Üretim Aliağa Çakmaktepe Enerji Bis Enerji Üretim BİS Enerji Üretim Bosen Enerji Elektrik Sayenerji Elektrik Üretim A.Ş. T Enerji Üretim A.Ş. Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Liquid + Natural Gas Liquid + Natural Gas Liquid + Natural Gas Liquid + Natural Gas Liquid + Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas 2007 Total Akteks Süper filmcilik Zorlu Eenerji Kayseri Siirt Mardin Kızıltepe Karen İdil 2 Desa Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Fuel Oil Naphta PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 48 Dentaş Ataer Enerji Naphta Naphta Fuel Oil 2007 Total Uşak Şeker Lignite Lignite 2007 Total Borçka HES Tektuğ YPM Ener Yat A.S. Altıntepe Hidro YPM Ener Yat A.S. Beypınar Hidro YPM Ener Yat A.S. Konak Hidro Kurteks Tekstil Iskur Tekstil Özgür Elek. A.Ş. Özgür Elek. A.Ş. (ilave) Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro 2007 Total 2007 Total 0.30 0.10 117.60 2,280 566 722,473 1.70 1.70 3,084 3,084 300.60 5.00 4.00 3.60 4.00 2.40 4.60 6.30 6.30 336.80 600,000 20,000 10,000 9,000 1,000 19,000 4,000 27,216 27,216 717,432 901.40 4.786.892 1.93 1.37 21.89 7.52 26.08 8.73 47.62 3.16 17.46 0.45 7.52 8.73 14.25 1.58 34.92 15.04 1.17 126.10 6.18 49.16 1.32 6.91 6.91 416 14,015 9,750 158,302 60,160 180,059 62,499 378,198 24,688 125,712 3,179 54,144 70,241 33,881 12,838 245,140 108,288 8,738 1,008,000 39,897 389,715 11,203 50,072 54,078 3,102,795 2006 Ekoten Tekstil GR-I Erak Giyim GR-I Alarko Altek GR-III Aydın Örme GR-I Nuh Enerji 2 GR-II Marmara Elektrik (Çorlu) GR-I Entek GR-IV Else Tekstil (Çorlu) GR-I II Sönmez Elektrik (Çorlu) GR-I II Denizli Çimento (Düzeltme) Kastamonu Entegre (Balıkesir) GR I Boz Enerji GR I Amylum Nişasta (Adana) Şık Makas (Çorlu) GR I Antalya Enerji GR I II III IV Hayat TEM ve Sağlık GR I II Eroğlu Giyim (Çorlu) GR I Cam İş Elktrik (Mersin) GR I Yıldız Ent. Ağaç (Kocaeli) GR I Çerkezköy Enerji GR I Çırağan Sarayı GR I Akmaya (Lüleburgaz) GR I Burgaz (Lüleburgaz) GR I Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas Natural Gas 2006 Total PROJECT DESIGN DOCUMENT FORM (CDM PDD) - Version 03 CDM – Executive Board page 49 Elbistan B GR III Elbistan B GR II Elbistan B GR IV Lignite Lignite Lignite Lignite 2006 Total Menderes Elektrik GR-I Adana Atıksu Arıtma Tesisi Ekolojik Enerji (Kemerburgaz) GR I Ertürk Elektrik Tepe RES GR I Geothermal Biogaz LFG Wind Renewable 2006 Total Seyhan I II Şanlıurfa GR I II Bereket Enerji Gökyar HES 3 Grup Molu En. Zamantı Bahçelik GR I II Su Enerji (Balıkesir) GR I II Bereket Enerji (Mentaş Reg) GR I II Ekin (Başaran HES) (Nazilli) Ere (Sugözü rg. Kızıldüz HES) GR I II Ere (Aksu Reg. Ve Şahmallar HES) GR I II Tektuğ (Kalealtı) GR I II Bereket EN. (Mentaş Reg) GR III Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro Hydro 2006 Total 2006 Total 360.00 360.00 360.00 1,080.00 2,340,000 2,340,000 2,340,000 7,020,000 7.95 0.80 0.98 0.85 11 55,657 6,023 5,880 1,889 69,448 0.30 51.80 11.62 4.22 4.60 26.60 0.60 15.43 14.00 15.00 13.30 157 1,171 0 28,048 10,501 4,203 93,333 2,900 7,916 6,600 11,000 46,667 212,339 1,664.06 10,404,583 8.73 50.00 58.73 65,000 350,000 415,000 6.75 6.75 52,000 52,000 65.48 467,000 2005 AKÇA ENERJİ GR-III BOSEN GR-III Natural Gas Natural Gas Natural Gas 2005 Total KARKEY(SİLOPİ-4) GR-V Fuel Oil Fuel Oil 2005 Total 2005 Total Annex 4 MONITORING INFORMATION -----
Benzer belgeler
(GS) Annual Report
PLF= Annual Gen. / Installed Cap. * (working hours)
=23,907 MWh / (7 MWe * 8760 hours)