د افغانستان اسالمی جمهوريت د اقتصاد وزارت د افغانستان د بيارغونی او پرمختيايی خدماتو دفتر جمهوری اسالمی افغانستان وزارت اقتصاد دفتر خدمات بازسازی و انکشافی افغانستان Islamic Republic of Afghanistan Ministry of Economy Afghanistan Reconstruction & Development Services A R D S Invitation for Bids (IFB) Islamic Republic of Afghanistan Afghanistan Urban Water Supply and Sewerage Corporation (AUWSSC) National Competitive Bidding (NCB) IFB No- AUWSSC/1914/NCB 1. The Government of the Islamic Republic of Afghanistan intends to apply parts of the National Budget to payments under Contract for Procurement of Works for Water Supply Project Phase I in Pule Alam City of Logar Province 2. Afghanistan Reconstruction and Development Services (ARDS) on behalf of Afghanistan Urban Water Supply and Sewerage Corporation (AUWSSC) now invites sealed bids from eligible and qualified bidders for Water Supply Project Phase I in Pule Alam City of Logar Province. The time allowed for the completion of the whole works is: 12 Months from start date. 3. Bidding will be conducted through the National Competitive Bidding (NCB) procedures specified in the Public Procurement Law and Circulars, and is open to all Bidders from Eligible Source Countries as defined in the Bidding Documents. 4. Interested eligible bidders may obtain further information from and inspect the bidding documents at the Afghanistan Reconstruction and Development Services (ARDS) during office hours 08:00 to 16:00 from Saturday to Wednesday at the address below. 5. Qualification requirement includes: a. The minimum required annual volume of construction work for the successful bidder in any of the last five years shall be 58,000,000 AFN b. The contractor should have executed one similar nature of construction project during the last five years. One Contract value 35,000,000 AFN c. The essential equipment to be made available for the Contract by the successful Bidder shall be: SNo. Name of Equipment 1 2 3 4 5 6 7 8 9 Excavators, 0.4 M3 > 70 KW Front Loaders, 0.4 M3 >, 70 KW Heavy Compactor Rollers, >60 KW Light Compactors Trucks 7 Tones Trucks 12 Tons Water Tankers Trucks 8 M3 Cutting Machine (for Asphalt Road Cutting) Total Station ( for Survey of Connections) Unit No. required for construction No No No No No No No No No 1 1 1 1 6 4 3 2 2 d. Project Manager, Construction Engineer, Electrical Engineer & Engineer of Water Supply and Sewerage & heater system, no less than 5 years experiences an equivalent nature and value. e. The minimum amount of liquid assets and/ or credit facilities net of other contractual commitments of the successful Bidder shall be 14,500,000 AFN 6. A complete set of bidding Documents in English may be obtained free of cost by interested bidders by downloading the same from the ARDS website www.ards.gov.af or may obtain in CD from the ARDS office (address given below). In case of any difficulty in downloading from website, interested bidders may contact at the e-mail address [email protected]. 7. Bids must be delivered to the address below by August 9, 2014 at 10:00 AM. (Kabul local time). Electronic bidding shall not be permitted. Late bids will be rejected. Bids will be opened at the address below immediately after bid submission deadline, in the presence of bidders’ representatives who chose to attend in person. All Bids must be accompanied by a Bid Security of 1,450,000 AFN or equivalent in a freely convertible currency in favor of Afghanistan Urban Water Supply and Sewerage Corporation (AUWSSC). 8. The address referred to above is: Ministry of Economy Afghanistan Reconstruction & Development Services (ARDS) Attention: Naresh Parsad Sinha 4th & 5th Floor, Malik Asghar Square, Kabul, Afghanistan Tel: +93(0) 75 20 55 746 E-mail: [email protected] copy to [email protected]
Benzer belgeler
Invitation for Bids - Rebidding
at least 70km of 220kV or higher voltage twin bundle transmission lines strung by
controlled tension method during last ten (10) years and such transmission lines should
have been operating success...