EMT İNŞAAT TURİZM SANAYİ VE TİCARET A.Ş.
Transkript
EMT İNŞAAT TURİZM SANAYİ VE TİCARET A.Ş.
EMT İNŞAAT TURİZM SANAYİ VE TİCARET A.Ş. EMT CONSTRUCTION TOURISM INDUSTRY AND TRADE CO. CONSTRUCTION TOURISM INDUSTRY&TRADE CO. Çetin Emeç Bulvarı 1322.Cad.(6. Cad.) 51/4 06460 A.Öveçler/ANKARA/TURKIYE Tel : 0 312 472 62 72 (Pbx)–Fax: 0 312 472 90 20 EMT EMT CONSTRUCTION TOURISM INDUSTRY&TRADE CO. ESTABLISHMENT DATE CAPITAL BANK REFERENCES ADDRESS TELEPHONE FAX WEB E-MAIL : SEPTEMBER 1996 : 650.000,00 TRY : YAPI VE KREDI BANKASI (BULVAR BRANCH) HALK BANKASI (YUKARI AYRANCI BRANCH) GARANTİ BANKASI (DİKMEN BRANCH) FİNANSBANK (BALGAT BRANCH) : ÇETN EMEÇ BULVARI 1322.CAD. NO:51/4 06460 A.ÖVEÇLER- ANKARA : +90 (312) 472 62 72 (Pbx) : +90 (312) 472 90 20 : www.emtinsaat.com.tr : [email protected] FIELDS OF ACTIVITIES: BUILDING CONTRACTING AND CONSTRUCTIONS WORKS OF ELECTRICAL AND ELECTRONIC SYSTEMS * INFRASTRUCTURAL WORKS; - CONSTRUCTION OF RUNWAY,APRON,TAX WAY - CONSTRUCTION OF INTER AIRPORT ROADS - CONSTRICTION OF HIGHWAYS - CONSTRUCTION OF MILITARY HELIPAD FIELDS - CONSTRUCTION OF WASTEWATER TREATMENTS PLANTS * SUPERSTRUCTURAL CONSTRUCTION WORKS - CONSTRUCTION OF AIRPORT TERMINAL (STATION) BUILDINGS - CONSTRUCTION OF ACCIDENT INTERVENTION &FIRE FIGHTING BUILDINGS - CONSTRUCTION OF PRIVATE BUILDINGS - CONSTRUCTION OF MILITARY BUILDING FACILITIES - CONSTRUCTION OF POWER SUPPLY STATIONS * OTHER WORKS - AGL WORKS OF AIRPORTS - ELECTRICAL WORKS OF POWER STATIONS - REMOTE CONTROL SYSTEMS - BUILDING AUTOMATION SYSTEMS - AIRPORT ELECTRONIC SYSTEMS - AIR NAVIGATION SUPPLEMENTARY SYSTEMS (VOR, DME, NDB,ILS) CONSTRUCTION TOURISM INDUSTRY&TRADE CO. Çetin Emeç Bulvarı 1322.Cad.(6. Cad.) 51/4 06460 A.Öveçler/ANKARA/TURKIYE Tel : 0 312 472 62 72 (Pbx)–Fax: 0 312 472 90 20 EMT CONSTRUCTION LIST OF KEY PERSONNEL NAME AND SURNAME Burhan DOĞAN TITLE Elect. Engineer General Manager Hasan DOĞAN Administrative Asistant of General Manager Kuvvet SAZAK Elect. Engineer Coordinator Yusuf ERDOĞAN Civil Engineer Coordinator Alaattin KARAAĞAÇ Financial Consultant Dengin DOĞAN Accounting Director Mustafa ÇEVİK Elect. Engineer Cem KARAMAN Surveying Engineer Serol AYSAN Mech.Engineer Türker SÜMER Architect Mustafa ALPSAR Civil Engineer Mehmet Metin UĞUR Civil Engineer Süreyya YAMAN Civil Engineer Mustafa TÜRKMEN Elect. Engineer Yunus SARIKAYA Civil Engineer Ömer Faruk GÜMÜŞ Civil Engineer Tevfik REYHAN Mech.Engineer M.Egemen Sever Civil Engineer Önder ÖZDEMİR Civil Engineer Anıl DOĞAN Mechatronic Engineer Rafet BİRİNCİ Surveying Engineer Nuray BOZER Accounting Official Burak KOÇAK Accounting Official Erdal DOĞAN Accounting Official Ceyla KOÇ Civil Technician Yaşar ALICI Formen Timurçin ALICI Formen Emine KAHVECİ TOP Secretary Ali Çavuş DOĞANER Accounting Official Mehmet YÜCE Driver BANK REFERENCES EMT İNŞAAT TURİZM SANAYİ VE TİCARET A.Ş. BALANCE SHEET FOR THE PERIOD OF 01.01.2010-31.12.2010 ASSETS TL 39.695.197,05 3.379.803,63 1.329.543,94 2.050.259,69 0,00 771.538,61 264.939,87 70.421,04 190.755,08 245.422,62 2.204.588,70 2.204.588,70 0,00 32.059.718,03 USD 25.676.065,36 LIABILITIES 1-Contract Progress Costs G-Prepaid Expenses and Income Accruals H-Other Current Assets 1-Deferred VAT 4-Prepaid Taxes and Funds 5-Word Advances 6-Advances to Personnel TOTAL CURRENT ASSEST II-LONG TERM ASSETS A-Trade Receivables 5-Deposits and Guarantees Given B-Other Receivables 3-Due from subsidiaries C-Financial Fixed Assets D-Tangible Fixed Assets 1-Land 4-Plant, Machinery and Equipment 5-Motor Vehicles 6-Furniture and Fixtures 8-Accumulated Depreciation (-) E-Intangible Assets 1-Righs 5-Special Cost 7-Accumulated Amortization (-) 8-Advances to Suppliers F-Assets Subject to Amortization G-Prepaid Expenses and Accrued Income Revenue accruals 1-Prepaid Expenses for Future Years H-Other Fixed Assets 5-Prepaid Expenses and Funds TOTAL LONG TERM ASSETS 32.059.718,03 0,00 1.279.548,08 895.280,31 367.933,85 15.333,92 1.000,00 39.695.197,05 5.976.147,65 23.111,08 23.111,08 1.513.288,71 1.513.288,71 0,00 2.076.242,39 669.873,50 1.221.355,59 217.486,64 278.796,76 -311.270,10 1.360.691,58 15.636,91 164.259,67 -103.161,48 1.283.956,48 0,00 6.583,98 0,00 6.583,98 996.229,91 996.229,91 5.976.147,65 20.737.204,42 TOTAL ASSETS 45.671.344,70 29.541.620,12 LIABILITIES (SOURCES) A-Liquid Assets 1-Cash 3-Banks B-Marketable Securities C-Trade Receivables 1-Customers 2-Notes Receivables 5-Deposits and Guarantees Given 7-Doubtful Trade Receivables D-Other Receivables 5- Other Receivables E-Inventories F-Contract Progress Costs TL 45.671.344,70 38.119.712,40 0,00 4.359.324,80 2.973.825,24 1.335.780,88 35.851,62 13.867,06 133.641,90 0,00 133.641,90 0,00 33.207.663,04 33.207.663,04 USD 29.541.620,12 F-Taxes Payable and Other Fiscal Liabilities 419.082,66 1-Taxes and Funds Payable 369.672,91 2-Social Security Withholdings Payable 49.409,75 G-Provisions for Liabilities and Expenses 0,00 1-Provisions for Income Taxes and Other Legal Liabilities on Profit ( 1.339.675,21 2-Prepaid Income Taxes and Other Legal Liabilities on Profit (-) -1.339.675,21 H-Income Relating to Future Months and Expense Accruals 0,00 I-Other Short Term Liabilities 0,00 TOTAL SHORT TERM LIABILITIES 38.119.712,40 II-LONG TERM LIABILITIES 899.414,77 A-Financial Liabilities 0,00 B-Trade Payables 694.180,82 1-Suppliers 694.180,82 C-Other Liabilities 205.233,95 1-Due to Shareholders 205.233,95 D-Advances Received 0,00 E-Provisions for Debts Expenses 0,00 F-Income Relating to Future Periods and Expense Accruals 0,00 G-Other Long Term Liabilities 0,00 TOTAL LONG TERM LIABILITIES 899.414,77 III-SHAREHOLDERS EQUITY 6.652.217,53 A-Paid -In Capital 650.000,00 1-Capital 650.000,00 B-Capital Reserves 0,00 C-Profit Reserves 331.610,15 1-Legal Reserves 331.610,15 D-Retained Earnings 353.641,82 1-Retained Earnings 353.641,82 E-Losses From Previous Years (-) 0,00 F-Net Profit (Loss) For The Period 5.316.965,56 1-Net Profit of Period 5.316.965,56 TOTAL SHAREHOLDERS EQUITY 6.652.217,53 271.075,46 2.186.160,17 I-SHORT TERM LIABILITIES 859.989,61 A-Bank Loans 1.326.170,56 0,00 499.054,73 171.371,20 45.550,48 123.386,21 158.746,84 1.425.995,28 1.425.995,28 0,00 20.737.204,42 0,00 827.650,76 579.094,64 237.990,85 9.918,45 646,83 25.676.065,36 3.865.554,75 14.948,95 14.948,95 978.841,34 978.841,34 0,00 1.342.976,97 433.294,63 790.010,08 140.677,00 180.334,26 -201.339,00 880.136,86 10.114,43 106.248,17 -66.727,99 830.502,25 0,00 4.258,72 0,00 4.258,72 644.391,92 644.391,92 3.865.554,75 B-Trade Payables 1-Suppliers 2-Notes Payables 4-Deposits and Guarantees Received 5-Other Trade Payables C-Other Liabilities 1-Due to Shareholders 4-Due to Personnel D-Advances Received E-Contract Progress Income 1-Contract Progress Income LIABILITIES 45.671.344,70 24.656.993,79 0,00 2.819.744,37 1.923.560,96 864.023,86 23.189,92 8.969,64 86.443,66 0,00 86.443,66 0,00 21.479.730,30 21.479.730,30 239.115,72 31.959,73 0,00 866.542,83 -866.542,83 0,00 0,00 24.656.993,79 581.768,93 0,00 449.017,35 449.017,35 132.751,58 132.751,58 0,00 0,00 0,00 0,00 581.768,93 4.302.857,39 420.439,84 420.439,84 0,00 214.495,57 214.495,57 228.746,33 228.746,33 0,00 3.439.175,65 3.439.175,65 4.302.857,39 29.541.620,12 Some of the Completion CertIFICATES REPUBLIC OF TURKEY MINISTRY OF TRANSPORTATION, MARITIME AFFAIRS AND COMMUNICATIONS General Directorate of Railways Ports and Airports Construction ANKARA Number: B.11.0.DLH.0.16.00.01/23065 Subject: Work Experience Certificate (Work Completion) 07/12/2011 WORK EXPERIENCE CERTIFICATE (Contractor – Work Completion) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Owner of the Work Name and tender registry number, if any, of the Work Place where the work has been executed Building Technique Applied : : Name, surname or trade name of the contractor TR ID Number / Tax identification No. Partnership ratios if it is a business partnership First contract price Total contract price Amount of the work realized Contract Date If the contract was assigned a. Assignment Date b. Amount of the work on assignment date c. Amount of the work after the assignment Provisional acceptance/liquidation or settlement date of the work Amount of the document : Infrastructure Construction, Concrete-Covered PAT Areas (Runway, Apron, Taxi route, Boundary Wire Fence, Boundary Way, Runway Lighting System, Boundary Lighting, Low Tension and Middle Tension Electrical Works) EMT İnş. Tur. San. ve Tic. A.Ş. : 334 008 4722 Metropolitan Tax Office : -- : : : : TL 20,817,006.47 TL 24,978,999.48 TL 24,978,999.36 08.12.2009 : : ----- : --- : 01.11.2011 : TL 24,978,999.36 (Twenty four million nine hundred seventy eight thousand nine hundred ninety nine lira thirty six kuruş) : : General Directorate of DLH Construction Construction of Iğdır Airport Infrastructure Supply and Miscellaneous Works Iğdır This document was issued based on the petition of the contractor EMT İnş. Tur. San. ve Tic. A.Ş. dated 22/11/2011 and number 02-12/BD-20011/054. <signature and seal> Erol ÇITAK Deputy General Manager On behalf of Minister GENERAL DIRECTORATE OF STATE AIRPORTS AUTHORITY Department of Construction and Real Estate December 20th, 2010 No Subject : B.11.2.DHM.0.80.03.00-755-(68945)-11805 : Business Experience Certificate <SEAL> BUSINESS EXPERIENCE CERTIFICATE (Contractor – Work Completion) 1. Client (a) 2. Name of the Work and Tender Registration Number, if any 3. Location of the Work : General Directorate Of State Airports Authority : Renovation of Runway-Apron-Taxiing Field of Erzincan Airport : Erzincan Airport : Construction of Runways and Taxiways, Qualified 4. Applied Construction Technique Concrete, Hot Bituminous Mixture, Stone Mastik (b) Asphalt, Electrical Infrastructure and Lighting, Underground Drainage 5. Name and Surname or Trade : Joint Venture of EMT İnş.Turz-San.ve Tic.A.Ş. and Name of the Contractor YUMA İnş.Tic.ve San.Ltd.Şti. 6. T.R. Identity Number / : Baskent Tax Administration 334 050 7485 Taxpayer Identification Number 7. If Joint Venture, Partners and Partner Shares EMT İnş.Turz.San.ve Tic.A.Ş. % 51 If Consortium, Partners and YUMA İnş.Tic.ve San.Ltd. Şti. % 49 Realized Portions and Respective (c) Amounts 8. Initial Contract Value (ç) : 21,279,726.15TL (d) 9. Total Contract Value : 25,535,671.38 TL 10. Realized Amount of Work (e) : 25,335,671.38TL (Progress Payment No: 10) 11. Contract Date : October 23rd, 2009 12. If the Contract is Transferred; :-------------------(f) a. Transfer Date (g) b. Amount of Business at the Date of Transfer (ğ) c. Amount of Business after the Date of Transfer (h) 13. provisional acceptance/Settlement or Abode Date of the Work (ı) 14. Certificate Amount :-------------------:-------------------:-------------------August 25th, 2010 (Provisional Acceptance Date) 25,335,671.38TL (Progress Payment No: 10) <signature> Funda OCAK Deputy General Manager <signature> Orhan BİRDAL General Manager <SEAL> Konya Yolu 06330 Etiler /ANKARA, Contact to Salih GÜNAY Civil Technician for detailed information Tel: (0 312) 204 23 17 Fax: (0 312) 212 22 06 e-mail: [email protected] Web: www.dhmi.gov.tr REPUBLIC OF TURKEY PRIME MINISTRY HOUSING DEVELOPMENT ADMINISTRATION OF TURKEY WORK EXPERIENCE CERTIFICATE (Contractor - Work Completion) 25.05.2012 034408 Date: … / … / …… Date: B.02.1.KNT.0.15.08.00/755.07.03[061402] - 2130 1. Employer 2. Name of the project and tender registration number, if any 3. Location of the work performed 4. Construction technique applied 5. Name and surname or trade name of the contractor 6. Turkish ID No / Tax ID No 7. Partners and partnership shares for joint ventures, partners and their performed portion and sum of work for consortiums 8. Initial contract value 9. Total contract value 10. Amount of total performed work 11. Contract date 12. In case of contract assignment a. Assignment date b. Amount of work by the assignment date c. Amount of work after the assignment date 13. Date deemed for provisional acceptance 14. Sum of the certificate Republic Of Turkey, Prime Ministry, Housing Development Administration Of Turkey 50-Bed Hospital Construction and Infrastructure and Landscaping Project in ereflikoçhisar Ankara (Tender Registration Number: 2009/ 143497) Ankara Conventional reinforced concrete framework construction (Total Construction Area = 16,925 m²) EMT . Tur. San. ve Tic. A. . Ba kent Tax Office, Ankara - 334 008 4722 TL 11,996,386 (Eleven million nine hundred and ninety-six thousand three hundred and eighty-six Turkish Liras) TL 11,996,386 (Eleven million nine hundred and ninety-six thousand three hundred and eighty-six Turkish Liras) TL 11,292,268.94 (Eleven million two hundred and ninety-two thousand two hundred and sixty-eight Turkish Liras and ninetyfour kurus) 14.01.2010 05.01.2012 TL 11,292,268.94 (94.13%) (Eleven million two hundred and ninety-two thousand two hundred and sixty-eight Turkish Liras and ninetyfour kurus) {seal of Housing Development Administration Of Turkey} HOUSING DEVELOPMENT ADMINISTRATION OF TURKEY Mr. Ahmet Haluk KARABEL Chairman 24.05.2012 {Signature} Ms. Ay e ÇALKAN Vice Chairman 24.05.2012 24.05.2012 24.05.2012 Specialist Department Chief Department Head A. AKARCA S. BALABAN M. SOYLU mza} { mza} mza} EMT CONSTRUCTION TOURISM INDUSTRY&TRADE CO. LIST OF ONGOING PROJECTS No: Country Employer Name and Place of Work Last payment report total Year Subject of the Work 1 Turkiye DHMİ Turkish Airports Authority Esenboga Airport 47.990.000,00 TL 2012 ESENBOGA Airport Apron and Rapid Exit Taxiway Construction (SERA&EMT) 2 Turkiye Bingöl Airport 11.444.786,18 TL 2010 BİNGÖL Airport Substructure Works and Various Construction 3 Turkiye Kozan-Feke-Saimbeyli 21.269.807,14 TL 2009 KOZAN-FEKE-SAİMBEYLİ 6.böl.hb.road between km:48+80058+800 and between km:61+900-70+151g/66+56082+300 bridges,substructure and various contruction works DLH Turkish Ministry of Transportation General Directorate of Highways 5.th Division EMT CONSTRUCTION TOURISM INDUSTRY&TRADE CO. LIST OF COMPLETED PROJECTS Country Employer Name and Place of Work Last payment report Total Year Subject of the Work 1 Turkiye Republic of Turkiye Prime Ministery Housing Development Administration of Turkiye (TOKİ) Ankara Şereflikoçhisar 11.996.386,00 TL 2010 Şereflikoçhisar wiıth 50 Beds Hospital Constructıon Infrastructure and Landscapıng Ankara/TURKIYE 2 Turkiye DLH Turkish Ministry of Transportation IĞDIR Airport 20.817.006,47 TL 2011 IĞDIR Airport Substructure Works and Various Constructİon 3 Turkiye DLH Turkish Ministry of Transportation BALIKESİR Körfez Airport 24.737.482,56 TL 2011 BALIKESİR KÖRFEZ AIRPORT Runway Construction and Other Substructure Works 4 Turkiye DLH Turkish Ministry of Transportation MARDİN Airport 3.066.604,66 TL 2009 MARDİN AIRPORT Technical Building and ATC Building Construction 5 Turkiye DLH Turkish Ministry of Transportation ERZİNCAN Airport 21.279.726,00 TL 2009 ERZİNCAN AIRPORT Renowation of Apron Areas 6 Turkiye DHMİ Turkish Airports Authority MALATYA Airport 17.379.027,96 TL 2008 MALATYA AIRPORT New Runway Construction 7 Turkiye TCDD Genel Müdürlüğü ESKİŞEHİR Hasanbeyli 17.639.000,00 TL 2008 ESKİŞEHİR HASANBEYLİ Triage Station Construction 8 Turkiye DLH Tturkısh Mınıstry of Transportatıon ELAZIĞ Airport 5.185.462,89 TL 2008 ELAZIĞ AIRPORT Security Facilities Construction 9 Turkiye DLH Turkish Ministry of Transportation ANTALYA 5.232.123,59 TL 2007 National Cost Guard Command Building Construction in ANTALYA 10 Turkiye YUMA İnşaat Tic. ve San. Ltd.Co. MARDİN Airport 154.232,39 TL 2007 MARDİN AIRPORT Renovation and Expansion of Aprons AGL Works 11 Turkiye YUMA İnşaat Tic. ve San. Ltd.Co. VAN Airport 923.184,23 TL 2007 VAN AIRPORT Renovation and Expansion of Aprons and Construction of Turn Pad 12 Turkiye DHMİ Turkish Airports Authority SİNOP Airport 595.258,54 TL 2007 SİNOP AIRPORT Renovation of Aprons 13 Turkiye Kazova İnşaat Tur.San. ve Tic. Co. GATA Hospital 820.000,00 TL 2006 The Electric Works of the Construction of Gata Camlıca Bakımevi 14 Turkiye Doğusan Doğu Demir Co.Ltd. İZMİT NAVAL 1.225.000,00 TL 2006 İZMİT NAVAL Base Renovation of the Runway 15 Turkiye DHMİ Turkish Airports Authority Kahramanmaraş Airport 889.570,00 TL 2006 KAHRAMANMARAŞ AIRPORT Enhancement of Airport Approach Systems According to the ICAO Requirements 16 Turkiye DHMİ Turkish Airports Authority Çanakkale Airport 344.400,00 TL 2006 ÇANAKKALE AIRPORT Renewal of Aprons and Runway Including Airport Ground Lighting System No: DETAILS OF CERTIFICATION HELD VeriQuality CERTIFICATION Conformity of management system of the mentioned establishment with the requirements of the below stated standards has been supervised and approved by VERİCERT Belgelendirme ve Gözetim Hizmetleri Ltd. Şti. TS EN ISO 9001: 2008 QUALITY MANAGEMENT SYSTEMS ESTABLISHMENT: EMT İNŞAAT TURİZM SANAYİ VE TİCARET ANONİM ŞİRKETİ Aşağı Öveçler Mahallesi Çetin Emeç Bulvarı 1322. Cadde No: 51/4 – Çankaya – ANKARA TÜRKİYE Scope of management system Construction, Road, Bridge Infrastructure and Superstructure, Construction Contracts. Electric Works, Airport Buildings Works (Runway and Apron Works, Illumination, Thermal Building – Up, Expansion Maintenance and Repair) Sector Code: EA 28 This certification is valid as long as the establishment is in compliance with the certification and supervision requirements of VERİCERT. Document No VQTR010158 First Certification Date 25.05.2010 Issuance Date 25.05.2010 Signature Vericert Belgelendirme ve Gözetim Hizmetleri Ltd. Şti. Acıbadem Cad. Tekin Sk. No: 24/13 Acıbadem Kadıköy / Istanbul Turkey T. +90 216 325 2501 F. +90 216 325 7379 www.vericert.com.tr [email protected] Valid Until 10.05.2013 VeriQuality CERTIFICATION Conformity of management system of the mentioned establishment with the requirements of the below stated standards has been supervised and approved by VERİCERT Belgelendirme ve Gözetim Hizmetleri Ltd. Şti. TS EN ISO 14001: 2004 ENVIRONMENT MANAGEMENT SYSTEMS ESTABLISHMENT: EMT İNŞAAT TURİZM SANAYİ VE TİCARET ANONİM ŞİRKETİ Aşağı Öveçler Mahallesi Çetin Emeç Bulvarı 1322. Cadde No: 51/4 – Çankaya – ANKARA TÜRKİYE Scope of management system Construction, Road, Bridge Infrastructure and Superstructure, Construction Contracts. Electric Works, Airport Buildings Works (Runway and Apron Works, Illumination, Thermal Building – Up, Expansion Maintenance and Repair) Sector Code: EA 28 This certification is valid as long as the establishment is in compliance with the certification and supervision requirements of VERİCERT. Document No VQTR020158 First Certification Date 25.05.2010 Issuance Date 25.05.2010 Signature Vericert Belgelendirme ve Gözetim Hizmetleri Ltd. Şti. Acıbadem Cad. Tekin Sk. No: 24/13 Acıbadem Kadıköy / Istanbul Turkey T. +90 216 325 2501 F. +90 216 325 7379 www.vericert.com.tr [email protected] Valid Until 10.05.2013 VeriQuality CERTIFICATION Conformity of management system of the mentioned establishment with the requirements of the below stated standards has been supervised and approved by VERİCERT Belgelendirme ve Gözetim Hizmetleri Ltd. Şti. OHSAS 18001 OCCUPATİONAL HEALTH AND SAFETY MANAGEMENT SYSTEM ESTABLISHMENT: EMT İNŞAAT TURİZM SANAYİ VE TİCARET ANONİM ŞİRKETİ Aşağı Öveçler Mahallesi Çetin Emeç Bulvarı 1322. Cadde No: 51/4 – Çankaya – ANKARA TÜRKİYE Scope of management system Construction, Road, Bridge Infrastructure and Superstructure, Construction Contracts. Electric Works, Airport Buildings Works (Runway and Apron Works, Illumination, Thermal Building – Up, Expansion Maintenance and Repair) Sector Code: EA 28 This certification is valid as long as the establishment is in compliance with the certification and supervision requirements of VERİCERT. Document No VQTR040158 First Certification Date 03.06.2010 Issuance Date 03.06.2010 Signature Vericert Belgelendirme ve Gözetim Hizmetleri Ltd. Şti. Acıbadem Cad. Tekin Sk. No: 24/13 Acıbadem Kadıköy / Istanbul Turkey T. +90 216 325 2501 F. +90 216 325 7379 www.vericert.com.tr [email protected] Valid Until 20.05.2013 ON-GOING PROJECTS ELAZIG AIRPORT COMPLETED PROJECTS ANKARA S.KOCHISAR WITH 50 BEDS CONSTRUCTION, INFRASTRUCTURAL AND LANDSCAPING WORKS TURKIYE MARDIN AIRPORT TECHNICAL BUILDING AND ATC BUILDING CONSTRUCTION ERZINCAN AIRPORT RENOVATION OF APRON AREAS MALATYA AIRPORT NEW RUNWAY CONSTRUCTION BALIKESIR KÖRFEZ AIRPORT RUNWAY CONTRUCTION AND OTHER SUBSTRUCTURE WORKS ESKISEHIR HASANBEYLI TRIAGE RAILWAY STATION CONSTRUCTION NATIONAL COST GUARD COMMAND BUILDING CONSTRUCTION IN ANTALYA
Benzer belgeler
Replacement Parts List
IDS Decoder Controller Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
ET...