englısh - Norm Makina
Transkript
2015 ANKARA/TURKEY NORM MAKİNA SAN. İNŞ. TİC.LTD.ŞTİ. REFERANCE LIST 2015 COMPLETED WORKS www.normmakina.com.tr NORM MAKINA SAN. INS. TIC. LTD. STI. GENERAL REFERENCE LIST APRIL 2015 COMPLETED WORKS 1. YİBİTAŞ LAFARGE ORTA ANADOLU ÇİMENTO SAN. TİC. A.Ş. / 2002 Sivas Cement Plant 1.1. Revision of the electrostatic precipitator number I and II. 1.2. Fabrication and installation of the outlet pipe of the electrostatic precipitator as well as the dismantling of the existing one. 1.3. Insulation works of the electrostatic precipitator. 2. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2002 Bastas Cement Plant 2.1. Clinker Cooler : Fabrication of the both fix and movable chassis 2.2. Fabrication of the fixation plate for crusher. 2.3. Lime Unit: Installation of the casette filter with the capacity of 5000 m3/h as well as the piping works. 2.4. Packing Unit: Installation of the casette filter with the capacity of 1250 m3/h as well as the piping works. 2.5. Loesche Mill: Fabrication of the plates ( Hardox 400 ) 2.6. Revision of the dust duct for cooling tower (Project, fabrication, installation and dismantling of the existing one) 2.7. Lime quenching unit: Fabrication of the screw conveyor (Ø 500 mm) 3. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2003 Bastas Cement Plant 3.1. General revision works for clinker cooler. 3.2. Rotary Kiln Unit: reparation of the inlet seal 3.3. Rotary Kiln Unit: renovation of the outlet seal Sayfa 1 / 26 4. OYAK ÜNYE ÇİMENTO SAN. TİC. A.Ş. / 2003 Unye Cement Plant Fabrication and installation of the steel construction of the stock hall unit 5. SET ÇİMENTO SAN TİC A.Ş. / 2003 Trakya Cement Plant General revision works for electrostatic precipitators for both clinker cooler and raw mill. 6. BPB DOĞAN ALÇI FABRİKASI ( AYMAŞ A.Ş. ) / 2003 Hasanoglan Plaster Plant Renovation work for the outlet seal ring of the rotary kiln number II. 7. IŞIKLAR ŞARAPÇILIK SAN. VE TİC. A.Ş. / 2003 Kalecik Plant Fabrication and Installation works of the tanks for waste water treatment facility. 8. BURSA ÇİMENTO FABRİKASI ( ÇİMTEK A.Ş. ) / 2003 Bursa Cement Plant Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement Plant 9.1. Fabrication, installation and insulation works for the hot gas line of the cogeneration unit. 9.2. Revision works for the hoppers of the raw metarials and polyurethane coating works (Electrostatic precipitator of the raw mill number 1 – 2 ) 10. BPB DOĞAN ALÇI FABRİKASI / 2003 Hasanoglan Plaster Plant Renovation of the outlet seal ring for the rotary kiln number I. 11. VİCAT – KONYA ÇİMENTO SAN. TİC A.Ş. / 2003 Konya Cement Plant 11.1. Fabrication of the buckets for the bucket elevator for the raw mill. Sayfa 2 / 26 11.2. Fabrication of the kiln shell (Ø 4200x825 outlet side) for the rotary kiln number II as well as the replacement of it. 12. YİBİTAŞ LAFARGE ORTA ANADOLU ÇİMENTO SAN. TİC.A. Ş. /2003 Corum Cement Plant Revision of the kiln shell of the rotary kiln. 13. AŞKALE ÇİMENTO SAN. TİC. A.Ş. / 2003 Askale Cement Plant 13.1. Fabrication of the chair pad and support plates for the tyre of the rotary kiln. 13.2. Fabrication of the caterpillar of the pan conveyor for the coal feeding 13.3. Fabrication of the bucket for the Loesche return elevator 14. OYAK – ELAZIĞ ALTINOVA ÇİM. SAN. TİC. A.Ş. ( DAL TEKNİK ) / 2003 - 2004 Elazıg Cement Plant 14.1. Erection of the rotary kiln ( KHD Ø 4,0x59 mt. ) 14.2. Fabrication of the whole local equipments like cyclones, inlet chamber dust ducts e.t.c. located on preheater tower and installation of them as well. Weight of fabrication works: 650 ton Weight of erection works: 1200 ton 15. NUH ÇİMENTO SAN. A.Ş. ( GÜLERMAK ) / 2004 Nuh Cement Plant Erection of the rotary kiln number III. ( FLS Ø 5,5x66 mt ) Weight of erection works: 1100 ton 16. BPB GYPSUM ÜRETİM VE TİC. LTD. ŞTİ. / 2004 Hasanoglan Plaster Plant Dust sealing works for the screw conveyors, belt conveyors, cyclones and pipe lines for the perlite unit. 17. ADO ÇİMENTO SAN. TİC. A.Ş. / 2004-2005 Kızılkaya Cement Plant I. Clinker Production Line 17.1. Maintenance and erection of the rotary kiln together with it’s all equipments ( Polysius Ø 4,2x60 mt. ) Sayfa 3 / 26 17.2. Installation of the coal mill unit and fabrication of the local equipments (PFEIFFER ) 17.3. Installation of the Clinker cooler unit and fabrication of the local equipments ( IKN ) Weight of the local fabrication works: 650 ton Weight of the erection works: 1350 ton 18. BETONSAN – BETON VE ÇİMENTO SAN. A.Ş. / 2005 Lalahan Cement Grinding Facility. Alignment works for the gear box and bearings of the Cement mill 19. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2005 Konya Cement Plant Both Fabrication and installation works for the raw metarial feeding line of the Raw mill. Weight of the local fabrication works: 350 ton Weight of the erection works: 600 ton 20. DENİZLİ ÇİMENTO SAN.TİC. A.Ş. / 2005 Denizli Cement Plant 20.1. Revision of the ESP number II( Changing of the discharge electrodes, maintenace of the hammers e.t.c.) 20.2. Replacement of the light kiln shell, heavy kiln shell with tyre, rollers and adjustment of the gear and drive unit for the rotary kiln number II. 21. ÇİMENTAŞ KARS ÇİMENTO SAN. TİC. A.Ş. / 2005 Kars Cement Plant General revision works for clinker cooler, crusher, raw and coal mill e.t.c. 22. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2005 Kayseri Cement Plant Erection of the Rotary Kiln ( FLS Ø 3,6x55 mt. ) 23. İZAYDAŞ İZMİT ATIK VE ARTIKLARI DEĞERLENDİRME A.Ş. / 2005 Revision of the rotary kiln. ( Ø 4,2x12 mt. ) Sayfa 4 / 26 24. ADO ÇİMENTO SAN. A.Ş. / 2005 Antalya Cement Grinding Facility Replacement of gears for the gearbox of the cement. 25. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. ( TİMSAN A.Ş. ) / 2005-2006 Denizli Cement Plant Fabrication of the local equipments for the clinker stock hall with the capacity of 90.000 ton and installation of them. 26. SANKO – ÇİMKO ÇİMENTO VE BETON SAN. TİC. A.Ş. / 2005 - 2006 Adıyaman Cement Plant Erection and fabrication works of the cement mill unit.( UDCM / Ø 3,8x13 ) Weight of the local fabrication worksi: 1050 ton Weight of the Installation works: 1500 ton 27. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2006 Bastas Cement Plant 27.1. Maintenance works for the clinker cooler 27.2. Maintenance works for the stacker and reclaimer 28. TÜRKERLER İNŞ. TURİZM MADENCİLİK TİC. SAN. A.Ş. / 2006 Ladik Cement Plant Fabrication of the inlet gas duct of the electrostatic precipitator as weel as the expansion joint. 29. AS ÇİMENTO SAN. TİC. A.Ş. / 2006 Kızılkaya Cement Plant - LM 56.3+3. Fabrication and installation works for Loesche cement mill unit ( 210 ton/h Weight of the local fabrication worksi: 440 ton Weight of the Installation works: 1228 ton 30. YİBİTAŞ LAFARGE ORTA ANADOLU ÇİMENTO SAN.TİC.A.Ş. /2007 Corum Cement Plant Fabrication and installation works for the modification works of the clinker cooler. Weight of the local fabrication works : 35 ton Weight of the erection works : 90 ton Sayfa 5 / 26 31. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. (DAL TEKNİK)/ 2007 Mardin Cement Plant 31.1. Erection of the Rotary Kiln Unit ( HUMBOLDT Ø 4,33x65 mt. ) 31.2.Fabrication of the cyclones located on preheater tower ( OMAG ) Weight of the local fabrication works: 550 ton Weight of the erection works: 900 ton 32. OYAK BOLU ÇİMENTO SAN. A.Ş. / 2007 Saraykoy Grinding Facility. Replacement of the trunnion for cement mill 33. VİCAT KONYA ÇİMENTO SAN. A.Ş. / 2007 Konya Cement Plant Fabrication and replacement of the beams for the raw mill(Loesche LM 45-4 ) 34. VİCAT – KONYA ÇİMENTO SAN. A.Ş. ( 2006 – 2007 ) Konya Cement Plant Installation of the cement mill unit (FCB – Horomill 2 Ø 3800 ) Weight of the local fabrication works: 1200 ton Weight of the erection works: 2100 ton 35. SANKO – ÇİMKO ÇİMENTO FABRİKASI ( EKON – PROKON ). / 2007 Kahramanmaras Cement Plant 35.1. Installation of the rotary kiln unit.( Polysius Ø 5,6x87 mt ) 35.2. Installation of the raw mill. (Polysius RM 51 / 26 ) ( 3 units ) 35.3. Installation of the coal mill unit (Polysius RMK 25 / 12) ( 2 Units ) 35.4. Installation of the other equipments Fans / Elevators Weight of the erection works : 5500 ton 36. AS ÇİMENTO SAN. TİC. A.Ş. / 2007 Kızılkaya Cement Plant Replacement of the kiln shell for rotary kiln number I (PolysiusØ 4,0 x60 mt.) Sayfa 6 / 26 37. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2007 Bastas Cement Plant Replacement of the seperator of the raw mill named Loesche LM 45-4 and some revision works. 38. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2007 - 2008 Eskisehir Cement Plant 38.1. Erection of the rotary kiln unit (FLS Ø 3,6x55 mt ) 38.2. Erection of the Clinker cooler unit ( FLS ) 38.3. Erection of the electrostatic presipitator fort he Clinker cooler ( FLS ) 38.4. Erection of the clinker transport lines. Total weight of the erection works: 1600 ton 39. AS ÇİMENTO SAN. VE TİC. A.Ş. / 2007 - 2008 Kızılkaya Cement Plant Clinker production line number II 39.1. Erection of the raw mill unit and local fabrication works ( PFEIFFER AG / MPS 5300 ) 39.2. Erection of the coal mill unit and local fabrication works ( PFEIFFER AG / MPS 3070 ) 39.3. Erection of the rotary kiln unit. (CITIC Ø 5,6x87 mt. ) 39.4. Erection of the clinker cooler unit ( IKN ) Weight of the local fabrication works : 2100 ton Weight of the erection works : 5050 ton 40. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2008 Konya Cement Plant Replacement work of the casing of the cement mill number I ( FCB – Horomill 1 Ø 3800mm ) 41. AS ÇİMENTO SAN. TİC. A.Ş./ 2008 Kızılkaya Cement Plant. Erection of the Clinker silo with the capacity of 30000 ton and local fabrication works Weight of the local fabrication works: 1200 ton Weight of the erection works: 2200 ton Sayfa 7 / 26 42. KİPAŞ KAHRAMANMARAŞ ÇİMENTO SAN. TİC. A.Ş.(SARHAN)/ 2008 Kahramanmaras Cement Plant Clinker production line number 1. 42.1. Erection of the rotary kiln unit. ( KHD Ø 4,6x54 mt. ) 42.2. Erection of the clinker cooler unit and transport line. (KHD – Pyrofloor ) 42.3. Erection of the raw mill. ( PFEIFFER AG / MPS 4500 ) Total weight of the erection works : 2400 ton 43. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2008 Eskisehir Cement Plant 43.1. Local fabrication ,dismantling and installation works for the modernization of the coal transportation system of the clinker production line. 43.2. Replacement of the impeller of the ID fan. 43.3. Replacement of the impeller of the fan for the electrostatic presipitator of the raw mill. 44. SET ÇİMENTO SAN. TİC.A. Ş / 2008 Balıkesir Cement Plant Replacement of the heavy kiln shell with tyre and rollers. (HUMBOLDT - Ø 3.6 x 54 mt.) 45. LAFARGE VAN ÇİMENTO A.Ş./ 2008 Van Cement Plant Fabrication of the light and heavy kiln shell ( Ø 3,6 x 11 mt. ) 46. SET ÇİMENTO SAN. TİC.A. Ş / 2008 Ankara Cement Plant Replacement of the kiln shell for the rotary kiln number 3 and some revision works ( FCB- Ø 4,4 x 64 mt. ) Fabrication of the cyclone for the hot gas line of the coal mill and installation. 47. CİMPOR ÇORUM ÇİMENTO SAN. TİC. A.Ş. /2008 Corum Cement Plant Replacement of the casing of the mill number III ( KHD / Ø 2,2 x 13 mt ) Sayfa 8 / 26 48. NUH ÇİMENTO SAN. A.Ş. (ANDRİTZ) / 2008-2009 Nuh Cement Plant Solid waste disposal facility (sludge drying) Both fabrication and installation of some equipments. 49. AS ÇİMENTO SAN. TİC. A.Ş./ 2008-2009 Kızılkaya Cement Plant Erection of the raw mill unit. ( Hefei – HRM / 3700 E ) Total weight of the erection works: 350 ton. 50. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2008-2009 Bastas Cement Plant Solid waste burnning and stocking facility Weight of the local fabrication works: 168 ton Weight of the erection works: 225 ton 51. ETİ ALUMİNYUM A.Ş / 2009 Seydisehir Aluminium Facilities Revision of the rotary kiln number II (Rus / Ø 3,6 x 75 mt. ) Fabrication of the chair pad for the tyre 52. BETA MAKİNA / 2009 Ankara gendarmes sewing workshops Erection of the steel construction - 265 ton 53. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. /2009 Yozgat Cement Plant Replacement of the casing and impeller of the fan for raw mill. 54. CİMPOR SİVAS ÇİMENTO SAN. TİC. A.Ş. /2009 Sivas Cement Plant 1.Fabrication of the structure holding the burner pipe of the rotary kiln and replacement of the burner pipe. 2. Replacement of the trunnion of the raw mill. Sayfa 9 / 26 55. SURİYE TARTOUS ÇİMENTO FABRİKASI / 2009 Replacement of the heavy kiln shell with tyre and rollers and adjustment of the gear. ( Ø 4,6 * 69 mt ) 56. AS ÇİMENTO SAN. VE TİC. A.Ş. / 2009 Kızılkaya Cement Plant Revision works for clinker silo. Revision works for Rotary kiln line 1 Installation of the packing unit. Revision of the elevator for tras dryer. Fabrication of the screw conveyors under the filter. ( 60 ton/h – 5 units ) Fabrication of the chair pad for the tyre of the rotary kiln. Fabrication of the driver and carrier shafts for crusher. Erection of the Mass machine cement cooler unit 57. VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2009 Bastas Cement Plant Fabrication of the beams for Loesche mill Fabrication of the discahrge chute Fabrication rotary valve for waste burnning facility. Replacement of the valves at the waste burnning facility Fabrication of the upper pulley of the elevator for the cement mills number 1 and 2. 58. OYAK BOLU ÇİMENTO SAN. A.Ş. / 2009 Ankara Grinding Facility. Fabrication of the bucket for packing unit. (400mm-500mm-630mm) 59. SET ÇİMENTO SAN. VE TİC. A.Ş. / 2009 Balıkesir Cement Plant General revision work for the clinker cooler. ( IKN ) Fabrication and erection works. Modification works for the bag filter with the capacity of 15.000 m2/h Insulation works for the hot gas pipe. Sayfa 10 / 26 60. ÇİMKO ÇİMENTO VE BETON SAN. A.Ş. / 2009 Kahramanmaras Cement Plant Fabrication works for the pan conveyor number L11.01.01 and L11.01.02 Measuring works for rotary kiln Revision of the inlet seal for the rotary kiln. Revision of the electrostatic presipitator for klinker cooler. Fabrication of the expansion joint for cooling tower. ( Ø3020*1260 ) Execution of the cement transport line( Project, fabrication ,installation ) Execution of the elevator for the cement transportation and it’s tower ( 200 t/h, 28 mt – Project ,fabrication ,installation) Fabrication of the outlet kiln shell of the rotary kiln ( Ø5500*1450mm ) Replacement of the burner pipe. Fabrication of the air-slide ( 630 mm ) Replacement of the rotor for crusher. Replacement of the sleeve of the raw mill 61. CİMPOR ÇORUM ÇİMENTO SAN. TİC. A.Ş. /2009 Corum Cement Plant Replacement of the cement ball mill shell (3,8*13mt) Fabrication and installation of the base frame of the gearbox and motor of the Raw mill. ( KHD / Ø 2,2 x 13 mt. ) Cold Measuring the alignment of the Rotary Kiln Replacement of the chair pad under the tyre of the rotary kiln. 62. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2009-2010 Konya Cement Plant Fabrication and replacement of the outlet kiln shell of the rotary kiln number II ( Ø 4200x825 mm. ) 63. AŞKALE ÇİMENTO SAN. TİC. A.Ş. /2009 Trabzon Cement Plant Fabrication of the beam under the rail for the overhead crane in the stockhall. Fabrication of the pulley of the cooling ventilator Fabrication of the seperation valve for air-slide ( 300mm. 2 units) Fabrication of the casing and buckets of the Aumund elevator (5 units ) Fabrication of the ventilator pulley of the elevator number 3 Sayfa 11 / 26 64. SET ÇİMENTO SAN. TİC.A. Ş /2009-2010 Pınarhisar Cement Plant Extension of the lenght of the precalcination for the rotary kiln number II. ( Project-Fabrication-Erection ) 65. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2010 Denizli Cement Plant Modification works for the cyclone DF1 SO4 Fabrication and installation works for the hot gas duct between cogeneration and raw mill number 3 66. AS ÇİMENTO SAN. TİC. A.Ş. / 2010 Kızılkaya Cement Plant Replacement of the outlet trunnion of the cement mill number II and adjustment of the drive unit. Installation of the rotary scale for the packing unit number IV Fabrication and installation works of the steel silo and transport lines ( 1500 ton ) Fabrication and installation works of the steel silo and transport lines ( 1000 ton ) Revision of the gearbox of the raw mill number MPS 5300 Revision of the rotary kiln number 2 and replacement of the burner pipe of the rotary kiln 67. AŞKALE ÇİMENTO SAN. TİC. A.Ş. / 2010 Askale Cement Plant. Fabrication of the casing of the crusher of the trass Fabrication of the weighing hopper of raw mill. Fabrication of the casing of the crusher for the rotary kiln number II. 68. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2010 Kahramanmaras Cement Plant Fabrication of the outlet kiln shell of the rotary kiln ( Ø 5.6 x 1.45 mt. ) Fabrication of the slide gate valve ( DN 800 ) Fabrication of the retaining ring for rotary kiln Fabrication of the protector for switch Revision works for the clinker production line. Sayfa 12 / 26 Belt conveyor ( 200T/h - 3 unit )(project, fabrication, installation) Fabrication of the seperation valve for air slide ( 315 mm. ) Fabrication of the valves for the feeding pipes in preheater tower. Fabrication of the sealing and extension parts of the tertiary air duct. Replacement of the louvres of the seperators for the cement mills number I.II. III. Execution of the overhead cranes and bridges ( 20 Ton, 2Ton, 1Ton ) ( Project , fabrication, installation ) Various steel and platform works (55 Ton) Various steel and platform works (36 Ton) Fabrication of the casing of the air slide ( 315 mm. ) Cement transportation line and bridges for the air slides 69. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2010 Mardin Cement Plant Revision of the rotary kiln number I and replacment of the kiln shell and tyre Revision of the elektrostatic presipitator for raw mill, replacement of the collecting and discharge electrodes. General revision works for preheater tower Fabrication of the chair pad for rotary kilns number I.and II. Fabrication of the base frame for the ventilator of the gas of chimney. 70. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2010 Konya Cement Plant Revision of the electrostatic precipitator for raw mill. ( Redecam). Fabrication of the casing of the gear box for the overhead crane. 71. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2010 Mersin Cement Plant Adjustment of the drive unit and gear of the rotary ( FLS - Ø 5.5 x 87 mt. ) 72. SET ÇİMENTO SAN. TİC.A. Ş / 2010 Ambarlı Cement Grinding and packing Facility Revision of the cement mills number I. and II. Sayfa 13 / 26 73. SET ÇİMENTO SAN. TİC.A. Ş / 2010 Pınarhisar Cement Plant Revision of the rotary kiln number II. ( Replacement of the heavy kiln shell together with tyre ) Revision of the IHI raw mill and replacement of the rotor of the seperator 2. Manufacturing and installation of Cement Mill body outlet side (Ø 3,8*11 mt) Replacement of the outlet bearing of the cement mill number 2 SET ÇİMENTO SAN. TİC.A. Ş / 2010 Ankara Cement Plant Fabrication and installation of the hot gas pipe of the clinker cooler for the rotary kiln number 3 74. CİMPOR ÇORUM ÇİMENTO SAN. TİC. A.Ş. / 2010 Corum Cement Plant Revision of the rotary kiln 75. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. / 2010 Yozgat Cement Plant General modification works for clinker cooler unit ( Fabrication and installation of the both fix and movable frames e.t.c.) 76. OYAK BOLU ÇİMENTO SAN. TİC. A.Ş. / 2010 Eregli Cement Grinding Facility – Loesche LM 53. 3+3 Local fabrication and installation works for the grinding Weight of the local fabrication works: 400 ton Weight of the installation works. : 1350 ton 77. VİCAT-KONYA ÇİMENTO SAN.A.Ş. – 2010 Konya Cement Plant Fabrication and installation works for the clinker transporatation system Weight of the local fabrication works: 142 ton Weight of the installation works: 215 ton Sayfa 14 / 26 78. RENAİSSANCE CONSTRUKSİON / RUSYA. 2010 / 2011 – ( NORM-CCM ) Verhnebakansky Cement Plant -6200 Tpd. 6200 Tpd. Fabrication and Installation Works For The Complete Cement Production Line Raw mill feeding Erection of the electrostatic presipitator for raw mill Installation of the equipments located on the preheater tower Installation of the rotary kiln unit Installation of the clinker cooler unit and electrostatic presipitator Fabrication of the cyclones and gas ducts ( 2250 ton ) 79. SET ÇİMENTO SAN. TİC.A. Ş / 2010 Ankara Cement Plant Revision of the rotary kiln number II ( Ø 4.2*60 ) Replacement of the heavy kiln shell together with tyre 80. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2010 Mardin Cement Plant Fabrication of the chair pad and support plates for tyre. 81. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2010-2011 Eskisehir Cement Plant Extension of the calcination in facility I. Fabrication works: Installation works: 425 ton 380 ton Dismounting works: 106 ton 82. VİCAT-KONYA ÇİMENTO SAN.A.Ş. / 2010-2011 Konya Cement Plant Both fabrication and installation of the beams for Loesche raw mill 83. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2010-2011 Kahramanmaras Cement Plant Fabrication of the guillotine valve with actuator (2440*2440mm) - 3 units (1700*1200mm) - 4 units (P200 *300mm )- 4 units Sayfa 15 / 26 84. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2010-2011 Mersin Cement Plant Replacement of the kiln shell on which Girth Gear is located ( FLS Ø 5.2*6mt. ) 85. VİCAT-KONYA ÇİMENTO SAN.A.Ş. / 2010-2011 Konya Cement Plant. Fabrication and replacement of the heavy kiln shell together with tyre and also fabrication and installation of the inlet and outlet section of the rotary kiln number I (KHD – 4.2mt. ) 86. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2010-2011 Eskisehir Cement Plant Replacement of the heavy kiln shell inlet and outlet side together with tyre. ( MİAG - Ø 3.6mt) 87. OYAK BOLU ÇİMENTO SAN. TİC. A.Ş. / 2011 Eregli Cemnet Grinding Facility. Execution of the cement silo with the capacity of 550 ton (2 units) 88. CİMPOR ANKARA ÇİMENTO SAN. TİC. A.Ş. / 2011 Ankara Hasanoglan Cement Plant Replacement of the burner pipe of the rotary kiln. 89. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. / 2011 Yozgat Cement Plant Replacement of the burner pipe of the rotary kiln 90. AŞKALE ÇİMENTO SAN. TİC. A.Ş. / 2011 Askale Cement Plant Revision of the raw mill. Revision of the rotary kiln and preheater tower. Replacement of the beams and maintenace works for the clinker stock hall. Sayfa 16 / 26 91. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2011 Kahramanmaras Cement Plant Dismounting ,maintenance and installation of the gear box of the raw mii number 3. Replacement of the fans for clinker cooler. Replacement of the gear of the main drive of the rotary kiln 92. VİCAT-KONYA ÇİMENTO SAN.A.Ş. / 2011 Konya Cement Plant Execution of the 150 m3 coal silo (Project, Fabrication and installation) Weight of the fabrication works: 125 ton Weight of the installation works: 140 ton Weight of the dismounting works: 10 ton 93. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2011 Eskisehir Cement Plant Installation of the HOT DISK REACTOR for the facility number 2 and fabrication of some equipment for this Project. Weight of the fabrication works : 115... ton Weight of the installation works : 360... ton Weight of the dismounting works : 120… ton 94. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2011 Nigde Cement Plant Revision of the rotary kiln. ( KHD - Ø 3.8*54mt.) 95. OYAK BOLU ÇİMENTO SAN. TİC. A.Ş. / 2012 Bolu Cement Plant Revision of the rotary kiln ( Ø 4.6*64mt- KHD ) Replacement of the both tertiary air duct and kiln hood Replacement of the outlet part of the rotary kiln, outlet side tyre and rollers. Adjustment of the girth gear Maintenance of the cyclones in the preheater tower Dismounting of the cyclones number O1 and V1 and installation of the new ones. Sayfa 17 / 26 97. BEUMER MaschienenfabrikGMBH.- 2012 Fabrication of the various kind of elevator casing-160 ton 98. CİMPOR SİVAS ÇİMENTO SAN. TİC. A.Ş. / 2012 Sivas Cement Plant Replacement of the burner pipe of the rotary kiln 99. RENAİSSANCE CONSTRÜKSİYON / RUSYA. 2012 / 2013 – ( NORM-CCM ) Sebryakov Cement Plant - Mihailovka. Fabrication and installation of the clinker production line (4000 Tpd. ) Site Fabrication Fabrication of the cyclones and ducts – 1250 ton Workshop Fabrication Fabrication of the some equipments in our workshop located on AnkaraTURKEY ( Light kiln sections of the rotary kiln ,stacker-reclaimer,Apron conveyor,belt conveyors ) - 600 ton Erection Erection of the raw mill unit. Erection of the equipments in preheater tower Erection of the rotary kiln unit Erection of the clinker cooler unit and electrostatic precipitator for clinker cooler. Erection of the electrostatic precipitator for raw mill. 100. RENAİSSANCE CONSTRÜKSİYON / RUSYA. 2012 / 2013 – ( NORM-CCM ) Novocement Cement Plant-Novorosisky. Installation of the some units for clinker production line ( 4000 Tpd. ) Total weight of the installation : 3000 ton. 101. KİPAŞ KAHRAMANMARAŞ ÇİMENTO SAN. TİC. A.Ş./ 2012/2013/2014 Kahramanmaras Cement Plant Fabrication and installation works for the clinker production line number II . Fabrication of the steel structure : 6 500 ton Fabrication of the technological equipments : 4 000 ton (Casing of the filters ,some parts for the clinker cooler ,cyclones , Sayfa 18 / 26 . hoppers, gas ducts ,chimney e.t.c. ) Fabrication of the mechanical Equipments : 1 500 ton (Casing of the coal, cement and raw mills ,seperators ,base frame of the rollers for the rotary kiln ,base frame of the roller press and their accessories ,valves ,expansion joints ,air slides and e.t.c.) Total weight of the installation works : 15 000 ton Insulation works : 20 000 m2 Cladding works : 35 000 m2 General installation works for air, water and lubrication 102. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2012 Denizli Cement Plant Cladding works for the roof of the cement silo Weight of the fabrication works : 46 ton Weight of the installation works : 46 ton Weight of the dismounting works : 5 ton Cladding of the roof : 600m² 103. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2012 Eskisehir Cement Plant Fabrication and installation works for the transport line of the raw metarial Weight of the fabrication works : 220 ton Weight of the installation works : 235 ton Weight of the dismounting works : 120 ton Insulation works : 132 m2 Cladding Works : 1350 m2 104. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. 2012 / 2013 Mersin Cement Plant Installation of the HAC (Cement facility with Calcium aluminate ) Weight of the fabrication works : 485 ton Weight of the installation works : 570 ton Weight of the dismounting works : 120 ton Insulation works : 295 m2 Cladding Works : 4 500 m2 Sayfa 19 / 26 105. VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2013 Bastas Cement Plant Installation and fabrication works for the Roller Press Unit labelled BK -2 Weight of the fabrication of the technological equipments : 161 ton Weight of the fabrication of the steel construction : 877 ton Weight of the fabrication of the mechanical equipments : 45 ton Weight of the installation of the both technological and process equipments : 1230 ton Installation of the steel construction : 877 ton Cladding works : 7600 m² Insulation works : 3180 m² 106. ÖZBEKİSTAN DZHİZAK ÇİMENTO FABRİKASI.(DAL TEKNİK) / 2013 Fabrication of the paddle box for cement mill Fabrication of the temporary support for rotary kiln Fabrication of the support for the fan lines of the burner pipe 107. OYAK ÜNYE ÇİMENTO SAN. TİC. A.Ş. / 2014 Unye Cement Plant Fabrication of the dryer shell and gas line equipments for the ATY system and maintenance , installation ,commisionning works ( Ø3.0*25mt ) 108. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2014 Konya Cement Plant Converting the chair pads to sliding system. ( Ø4.2mt ) 109. YURT ÇİMENTO SAN A.Ş./ 2014 Mus Cement Plant Replacement of the kiln shell (Ø 4.15 x 1.0 mt) 110. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2014 Kayseri Cement Plant Dismounting and installation works for ID fan Sayfa 20 / 26 111. LAFARGE EREĞLİ ÇİMENTO SAN VE TİC A.Ş./ 2013 / 2014 Eregli Cement Grinding Facility Replacement of the shell of the cement mill and the girth gear- pinion 112. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2014 Kayseri Cement Plant Installation and fabrication works for the transport line of the clinker with trass 113. DENİZLİ ÇİMENTO SAN. A.Ş./ 2012 – 2013 Denizli Cement Plant Fabrication and replacement of the kiln shell for the rotary kiln number 1 (Ø 4.6*7.5 mt / Ø 4.6*2.6mt) 114. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2013 Mardin Cement Plant Fabrication and replacement of the outlet kiln shell ( Ø 4.6*1.6mt) 115. NUH ÇİMENTO SANAYİ A.Ş. / 2013 Preperation of the heavy kiln shell together with tyre for the rotary kiln number 3 on the ground as a spare part. FLS (Ø 5.5*2.8 mt. and Tyre) 116. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2013 Mardin Cement Plant Fabrication and replacement of the kiln shell for the rotary kiln number 1. (Ø 4.6*2.6mt) 117. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. / 2013 Yozgat Cement Plant Fabrication of the two way valve for the inlet of the raw mill 118. DENİZLİ ÇİMENTO SAN. A.Ş./ 2014 Denizli Cement Plant Fabrication and replacement of the kiln shell for the rotary kiln number 1. (Ø 4.6*6.3 mt ) Sayfa 21 / 26 119. TRAÇİM ÇİMENTO SANAYİ VE TİCARET A.Ş . 2013/2014 Fabrication, installation and commisionning works of the roller press unit for the cement mill number 1 Project : SINOMA-CHINA Model : TRD 140/140 Capacity : 500/650 ton 120. SANÇİM ÇİMENTO SANAYİ VE TİCARET A.Ş. / 2014 Bilecik Cement Plant Fabrication of the kiln shell ( Ø 4.6*1.0mt) 121. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2014 Kahramanmaras Cement Plant Replacement of the outlet kiln shell (Ø 5.5 x 1.45 mt) 122. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2014 Eskisehir Cement Plant Replacement of the kiln shell (Ø 3.6 x 18 mt) Firma: FLS Ø 3,6x55 mt Fabrication and installation of the tertiary air duct 123. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2014 Eskisehir Cement Plant Modernization of the pipes of the ID fan for the facility number 1. 124 . ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2014 Eskisehir Cement Plant Civil and mechanical works of the kiln feeding system for the facility number 1 125. ÜST YAPI MADENCİLİK A.Ş. / 2014 Kav-Cim Kavak Cement Plant Fabrication and installation works of the stacker and reclaimer system for the coal stock hall Sayfa 22 / 26 Fabrication and installation works of the stacker and reclaimer system for the raw metarial stock hall Fabrication and installation works of the stacker and reclaimer system for the additive stock hall 126. ÜST YAPI MADENCİLİK A.Ş. / 2014 Kav-Cim Kavak Cement Plant Fabrication and installation of the kiln shells. ( Ø 4.65*59mt) 127. TOROS TARIM A.Ş. /2014 Samsun Plant Fabrication and replacement of the tyres, kiln shells under the tyre and pulley of the dryer for the NPK unit NPK ( Ø 3.6*1.3mt+Ring) / ( Ø 3.6*1.8mt+Ring) 128. ÇİNKOM ÇİNKO KURŞUN METAL VE MADENCİLİK SAN.TİC.A.Ş. /2014 Kayseri Plant Fabrication of the kiln shell fort he teksif rotary kiln ( Ø 2.6*14.85mt) 129. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2014 Mardin Cement Plant Fabrication of the outlet kiln Shell fort he rotary kiln number II ( Ø 4.35*1.6mt) 130. VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2014 Bastas Cement Plant Replacement of the chair pads for the rotary kiln number II Replacement of the cyclones Replacement of the pipes located on the preheater tower ( +120 m. from the ground level.) Fixation and installation of the screw conveyor inside the hopper for the wasting system Fabrication of the steel and technological equipments related to this job and insulation works for this project. Sayfa 23 / 26 131. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2014 Kahramanmaras Cement Plant Replacement of the outlet kiln shell ( Ø 5.6*1.45mt) Replacement of the inlet sealing of the rotary kiln. Modification of the expansion joint at the tertiary air duct. Installation of the weighing machine for clinker and modification of the feeding station. Modification of the system fans for the coal mill. Replacement of the movable louvres of the coal mills. 132. VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2014 Baştaş Çimento Fabrikası Fabrication and installation of the hopper for the roller press unit BK-2 133. NUH ÇİMENTO SANAYİ A.Ş. / 2015 Installation of the heavy kiln shell section of the rotary kiln number 3 together with the tyre FLS (Ø 5.5*2.8 mt ) 134. NUH ÇİMENTO SANAYİ A.Ş. / 2015 Revision of the inlet chamber of the electrostatic precipitator for clinker cooler for the clinker production line number 3 135. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2015 Kahramanmaras Cement Plant Fabrication of the outlet kiln shell section 136. ( Ø 5.6*1.6mt) ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2015 Kayseri Cement Plant Fabrication and installation works for the dust coal 137. VOTORANTİM ÇİMENTO SAN. TİC. A.Ş. / 2015 Samsun Cement Grinding facility. Revision of the concrete support for the main drive unit of the cement mill and replacement of the gear. Sayfa 24 / 26 138. TÜRKMEX ÇİNKO OKSİT VE ÇİNKO SÜLFAT FABRİKASI A.Ş./ 2015 Izmir Aliaga Facility. Fabrication and installation of the dryer shell ( Ø 3.0*18.288mt) 139. OYKA KAĞIT AMBALAJ SANAYİ VE TİCARET A.Ş./ 2015 Caycuma Plant Fabrication of the Trommel used for peeling of the trunks for making paper( Ø 4.0*18.0mt) 140. ORMAKSAN HİDROLİK VE MAKİNE SAN VE TİC LTD. ŞTİ / 2015 Equatorial Guinea. Fabrication of the BSD Equipments for one of the FLS Project. ( Rotary kiln sections, casing of the raw mill, casing of the seperator e.t.c.) Weight of the fabrication works : 678 Ton. 141. ERMADEN ERDEMİR MADENCİLİK SAN. VE TİC. A.Ş./ 2015 Divrigi Facility Replacement of the part on the shell of the ball mill (Ø4400*7020mm) Sayfa 25 / 26 NORM MAKINA SAN. INS. TIC. LTD. STI. MARCH 2015 ONGOING PROJECTS BATIÇİM BATI ANADOLU ÇİMENTO SAN. A.Ş./ SARTA LTD. ŞTİ./2015 1. Soke Cement Plant Fabrication and installation works for the roller press unit Weight of the fabrication works: 452 Ton. Weight of the installation works:600 Ton. 2. BATIÇİM BATI ANADOLU ÇİMENTO SAN. A.Ş./ SARTA LTD. ŞTİ./2015 Soke Cement Plant Fabrication and installation works of the fly ash silo (2750 m³ ) Weight of the fabrication works :234 Ton. Weight of the installation works : 250 Ton. 3. ÜST YAPI MADENCİLİK A.Ş. / 2015 Kav-Cim Kavak Cement Plant Fabrication and installation works for the local equipments of the raw mill ( Ø5,2*13mt-Polysius) Fabrication and installation of the electrostatic precipitator for the raw mill and clinker cooler and cooling tower as well. 4. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2015 Eskisehir Cement Plant Civil and mechanical works for the dedusting system of the wagon loading system for the facility number II. 5. VİTKOVİCE GEARWORKS A.Ş. / 2014 Erection of Bridge Scraper Machine – MBSK 600 Sayfa 26 / 26
Benzer belgeler
wellness
sports machines. As a company established by people who professionally dedicated
their lives to sports, Esjim improved it’s products in order to develop the efficiency as
a result of many researche...
İndir - Laisy
strategies, customer satisfaction and brand awareness. In 2002, Köseoğlu DTM began production with spare felted ironing board cover, by improving the production; the firm producing ironing boards, ...
Birikim Mühendislik Endüstriyel Yüklenim Limited Şirketi
Birikim is a young company based upon personal
experience of more than 35 years in the above
mentioned sectors.
Within the past 13 years, Birikim has been evolved to a
company performing complete i...
çimento sanayi referans listesi
Revision of the inlet seal for the rotary kiln.
Revision of the electrostatic presipitator for klinker cooler.
Fabrication of the expansion joint for cooling tower. ( Ø3020*1260 )
Execution of the ...