yüksel proje a.ş.
Transkript
yüksel proje a.ş.
YÜKSEL PROJE A.Ş. Birlik Mahallesi 9. Cadde No: 41 Çankaya 06610 ANKARA Phone : ++ 90 312 495 70 00 (pbx) Fax : ++ 90 312 495 70 24 E-Mail : [email protected] Web : www.yukselproje.com.tr YÜKSEL PROJE Certificates YÜKSEL PROJE The Preface YÜKSEL PROJE was founded in 1978 and since then, with it has become the largest, fully independent engineering and consulting company in Türkiye with progressive accumulation of knowledge, human resources and business capacity, Yüksel Proje having completed numerous large-size projects in many fields of engineering, both at home and abroad, has attained a well-deserved respect in its sector. With its employees over 500, YÜKSEL PROJE provides services in the following specialities: feasibility study, planning, survey, design, construction supervision, quality control, project management, commissioning and operational training. The main objectives of Yüksel Proje are to improve its Service Quality continuously, maximize the customer satisfaction and sustain its leading position in the Turkish Consultancy sector, and to become a globally active consultant. In this catalogue, you will find YÜKSEL PROJE's success story, achievements from its inception. YÜKSEL PROJE Baraj Projeleri Altınkaya Barajı Sultansuyu Barajı Baraj Projeleri İşin Adı Baraj Projeleri Altınkaya Barajı Yeri Samsun / Türkiye İşin Adı Sultansuyu Barajı Yeri Malatya / Türkiye Başlama Tarihi 1980 Başlama Tarihi 1985 Bitiş Tarihi 1985 Bitiş Tarihi 1986 Samsun ili sınırları dahilinde, Kızılırmak nehri üzerinde inşa edilen barajın inşaat uygulama projeleri hazırlanmıştır. Malatya ili sınırları dahilinde, Sultansuyu nehri üzerinde inşa edilen barajın inşaat uygulama projeleri hazırlanmıştır. Barajın Özellikleri Amacı Gövde Tipi Yükseklik (talvegten) Göl Hacmi (normal su kotu) Göl Alanı (normal su kotu) Güç Yıllık Üretim İşletmeye Alındığı Tarih Barajın Özellikleri Amacı : Sulama Gövde Tipi : Toprak dolgu Yükseklik (talvegten) : 53 m Göl Hacmi : 53.3 hm3 Göl Alanı : 2.26 km2 Sulama Alanı : 17,614 ha İşletmeye Alındığı Tarih : 1992 : Enerji : Kaya dolgu : 140 m : 5,763 hm3 : 118.31 km2 : 700 MW : 1,632 GWh : 1988 YÜKSEL PROJE Building Projects İstanbul Halkalı Phase 3 Mass Housing Project Bingöl Area Earthquake Houses Ministry of National Education - Basic Education Schools Secondary Education Project (EFİKAP 1) Secondary Education Project (EFİKAP 2) İzmir Halkalı Sports Hall TOBB University of Economics and Technology Building Projects Building Projects İstanbul Halkalı Phase 3 Mass Housing Project Bingöl Mass Housing Project Project Name Location İstanbul / Türkiye Project Name Location Bingöl / Türkiye Contract Date 1998 Contract Date 2002 C ompletion Date 2000 C ompletion Date 2003 For the 4,006 housing units constructed in Phase 3 housing development site of 75 ha at Halkalı, İstanbul, Yüksel Proje has, prepared the preliminary designs, construction tender documents, supervised the architectural, structural, electrical and mechanical and infrastructural detailed designs prepared by the contractors, and performed the consultancy and construction supervision services. In addition, Yüksel Proje has prepared the preliminary designs and construction tender documents for the Primary Schools and Nurseries, Business Centers, Police Station, Health Home, Mosque, Fire Branch Office Building, Shopping center and Management Building, all with a total construction area of 24,628 m2. Yüksel Proje conducted the soil investigations, prepared the detailed designs and construction tender documents supervised the construction works for the mass housing units, social facilities and infrastructure at Uydukent and Ekinyolu communities in Bingöl. Project Characteristics Uydukent Houses :1,808 ea Ekinyolu Houses :208 ea Primary School :Capacity : 960 students High School :Capacity : 360 students Social Facilities :Shopping Complex, Police Station, Telecommunication Service Wastewater Treatment Plant :Package treatment for 10,000 persons Building Projects Project Name Basic Education Schools Location Türkiye Contract Date 1998 C ompletion Date 2001 For each of the Ministry of Education's 91 Primary School Building Constructions, which are located in 36 provinces and have a total floor area of 520,041 m2, the soil investigations, standard designs, the detailed designs and the tender documents are prepared. We have also provided Consultancy, Engineering and Supervision Services during the Construction and defects liability periods. Building Projects Secondary Education Project (EFİKAP 1 & 2) Project Name Location Türkiye Contract Date EFİKAP 1 : 2001 EFİKAP 2 : 2004 C ompletion Date EFİKAP 1 : 2003 EFİKAP 2 : 2006 For the construction of educational institutions in various provinces of Türkiye for the Ministry of National Education and IMKB (İstanbul Stock Exchange), Yüksel Proje has conducted the necessary soil surveys typical designs and detailed designs specific to each school, as well as construction contract documents. Then Yüksel Proje has provided Consulting, Engineering and Supervision services during the construction and warranty periods. Efikap 1 Nos. of Provinces Covered : 20 Nos. of Schools : 44 School Types : High School and Vocational High School Total Construction Area : 325,000 m2 Efikap 2 Nos. of Provinces Covered : 11 Nos. of Schools : 27 School Types : Basic Education School, High School and Vocational High School Total Construction Area : 190,000 m2 Building Projects Building Projects İzmir Halkapınar Sports Hall TOBB University of Economics and Technology Project Name Location İzmir / Türkiye Contract Date 2004 C ompletion Date 2005 İzmir Halkapınar Sports Hall having a construction area of 48,000 m2, is multi-purposed, planned to provide space for be basketball / gymnastics contests during the World Universiade 2005, to be held in İzmir, and later for concerts, circus shows and other similar activities. Yüksel Proje has made the necessary revisions to the existing detailed designs and prepared the construction tender documents and has provided consulting and supervision services during the construction period. Project Name Location Ankara / Türkiye Contract Date 2004 C ompletion Date 2005 Yüksel Proje has provided Consulting and Construction Supervision services for the construction of TOBB University of Economics and Technology in Ankara, for the Turkish Union of Chambers and Exchanges. Project Characteristics Phase 1 : Education Block Construction Area : 32,000 m² Phase 2 : Adm. Bldg., Sports Hall and Olympic Pool Construction Area : 33,000 m² YÜKSEL PROJE Marine Structures Haydarpaşa Port Marmaris Yacht Port Tüpraş Aliağa Crude Oil Jetty BTC Project - Ceyhan Sea Terminal Jetty Marine Structures Project Name Haydarpaşa Port Location İstanbul / Türkiye Contract Date1978 C ompletion Date1980 For the breakwater, loading/unloading mole quaywalls, berthing quaywalls for Ro-Ro and Ferryboat ships, which were added to the existing facilities at Haydarpaşa Port of İstanbul, one of the main ports in Türkiye, Yüksel Proje has conducted the topographical, geological and geotechnical surveys and prepared the detailed design. Characteristics Extended Breakwater Type and Length : Rockfill, 650 m Load Mole Quaywalls : -8 and -12 m concrete block length: 1,165 m Ferryboat Quaywalls : 2 ea -5.50 m concrete block length: 310 m Ro-Ro Quaywall : -8.00 m concrete block length: 74 m Commissioning Date : 1984 Marine Structures Project Name Marmaris Yacht Port Location Muğla / Türkiye Contract Date 1985 C ompletion Date 1986 For the Marmaris Marina, which is one of the most visited places for domestic and foreign yacht tourists, Yüksel Proje has conducted: topographical and bathimetric surveys and geological and geotechnical surveys of the harbor, analyzed the wind and wave climate and prepared the detailed design for all quays and slipway as well as general infrastructure. Facility Characteristics Yacht Capacity : 800 yachts Main Breakwater : Concrete block breakwater, 305 m Concrete Quays : -12.00 m, length: 305 m : -5.00 m, length: 453 m : -4.00 m, length: 840 m : -2.00 m, length: 740 m Floating Wharf : 900 m Slipway : 1 ea Commissioning Date : 1989 Marine Structures Project Name Tüpraş Aliağa Crude Oil Jetty Location İzmir / Türkiye Contract Date1981 C ompletion Date 1985 Tüpraş Refinery is located at Aliağa in İzmir and distributes the processed oil products to markets. A jetty was constructed to load and unload the crude oil. Yüksel Proje has conducted the geological and geotechnical surveys, and prepared the structural, electrical and mechanical detailed designs and construction tender documents. Characteristics Berthing Capacity : 50.000 DWT 250.000 DWT Trestle Length : 370 m Breasting Dolphins : 2 ea Mooring Dolphins : 4 ea Loading/Unloading Platform : 1 ea Marine Structures BTC Project - Ceyhan Sea Terminal Jetty Project Name Location Ceyhan / Türkiye Contract Date 2001 C ompletion Date 2002 Yüksel Proje has performed the topographical, bathymetric, geological and geotechnical surveys, and prepared the structural and electromechanical detailed design for the tanker ship jetty constructed at Ceyhan, as the last stop of the BTC Project and for the distribution of the crude oil conveyed from Azerbaijan to international market. Characteristics Berthing Capacity :80.000 DWT 300.000 DWT Approach Embankment :360 m Trestle Length : 1,640 m Water Depth : -30 m Breasting Dolphins : 4 ea Mooring Dolphins :9 ea Loading Platforms :2 ea Raylý Sistemler Hafif Raylı Sistem P rojesi (ANKARAY) İşin Adı Ankara Yeri Ankara / Türkiye Başlama Tarihi 1992 Bitiş Tarihi 1995 Raylý Sistemler YÜKSEL PROJE İşin Adı Ankara Hafif Raylı Sistem Treatment Plants and Projesi (ANKARAY) Infrastructure Projects Yeri Ankara / Türkiye Ankara Central Wastewater Treatment Plant Başlama Tarihi 1992 İzmir Wastewater Treatment Plant Bitiş Tarihi 1995 Mersin Potable Water Treatment Plant Treatment Plants Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm olarak yapılan Ankaray-Hafif Raylı Toplu Taşım Sisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik etütler yapılmış, güzergah, güzergah yapıları, istasyonlar, depo sahası ve atölye binasına ait uygulama projeleri hazırlanmıştır. Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm Bursa West and East Wastewater Treatment Plants olarak yapılan Ankaray-Hafif Raylı Toplu Taşım Hamitler SolidSisteminin Waste Leakage Plant jeolojik ve jeoteknik inşaatıTreatment ile ilgili topografik, etütler yapılmış, güzergah, güzergah yapıları, istasyonlar, depo sahası ve atölye binasına ait uygulama projeleri hazırlanmıştır. Infrastructure Projects Tarsus Wastewater Project Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Riyad - Quassim Water Özellikleri Transmission Line and Water Reservoirs Sistemin Hat uzunluğu : 8.7 km, çift hat Yanbo - Medinah Water Transmission Line Water Reservoirs Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray Çamlıdere Dam - Ankara Water Transmission Lines İstasyon : 11 ad. (yeraltı ist.) Delme Tünel and Stormwater : 2,000Drainage m Çankaya District Wastewater Aç-Kapa Tünel : 6,000 m Kurtboğazı Dam to İvedik Treatment Water Hemzemin ve Yarma Plant : 1,000 m Maksimum hız : 80 km/saat TransmissionLine III İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Baku-Tbilisi - Ceyhan Crude Oil Pipeline Treatment Plants Raylý Sistemler İşin Adı Project Name Ankara Central Wastewater A nkara Hafif Raylı Sistem P rojesi (ANKARAY) Treatment Plant Location Yeri Ankara Ankara // Türkiye Türkiye Treatment Plants Raylý Sistemler İzmir A nkara Wastewater Hafif RaylıTreatment Sistem Plant Projesi (ANKARAY) İşin Adı Project Name Location Yeri Ankara İzmir / Türkiye / Türkiye Başlama ContractTarihi Date 1992 1993 Başlama ContractTarihi Date 1992 1996 C Date 1995 1995 ompletion Bitiş Tarihi Completion Bitiş Tarihi Date 1995 2000 Başkent Ankara'nın ulaşım Wastewater sorununa çağdaş bir çözüm Stage I of Ankara Central Treatment Plant olarak yapılan Ankaray-Hafif Raylıpopulation Toplu Taşım was built to serve an equivalent of about 4 Sisteminin ile ilgili which topografik, jeolojik ve jeoteknik million. In inşaatı this project, is one of the largest etütler yapılmış, güzergah, wastewater treatment plantsgüzergah in Europe,yapıları, Yüksel Proje has istasyonlar, depo sahası ve atölye binasına ait prepared the architectural, structural, electrical and uygulama projeleri mechanical designhazırlanmıştır. for all structures, including the operations building, laboratory and workshop buildings Sistemin Özellikleri for the entire plant. and the infrastructure Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Characteristics Besleme 3. ray m3/day Enerji Capacity ::765,000 11 ad. (yeraltı ist.) İstasyon Equivalent Population ::4,000,000 2,000 Delme AverageTünel Dry Air Flow ::8.85 m3m/sec Tünel Date ::May 6,000 m Aç-Kapa Commissioning 2000 Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 The Wastewater Başkent Ankara'nın Treatment ulaşım sorununa Plant for İzmir, çağdaş which bir çözüm is the olaraklargest third yapılan city Ankaray-Hafif in Türkiye, was Raylıplanned Toplu Taşım to protect and Sisteminin inşaatı rehabilitate the heavily ile ilgilipolluted topografik, İzmir jeolojik Bay. ve Under jeoteknik this etütler yapılmış, project Yüksel Proje güzergah, supervised güzergah the process, yapıları, structural istasyonlar, and electromechanical depo sahasıdetailed ve atölye design binasına prepared ait by the uygulama projeleri contractor, and provided hazırlanmıştır. consulting and supervision services during the construction. A biological treatment Sisteminwhich system, Özellikleri also includes the removal of biophosphor and was implemented for çift the hat process and the Hatnitrogen, uzunluğu : 8.7 km, plant was designed for three parallelyolcu/yön/saat lines. Yolcu Kapasitesi : 25,000 Enerji Besleme : 3. ray Characteristics İstasyon : 11 ad. (yeraltı ist.) Delme Average Tünel Dry Air Flow : 72,000 m³/hrm Aç-Kapa MaximumTünel Dry Air Flow : 96,000 m³/hrm Hemzemin Maximum Wet ve Yarma Air Flow : 12 1,000 m³/hr m Maksimum Commissioning hız Date : Line 80 km/saat 1: January 2000 2: September 2000 İşletme Hızı : Line 35 km/saat İşletmeye 3: August alındığı tarih : Line Ağustos 1996 2001 Treatment Plants Raylý Sistemler Treatment Plants Raylý Sistemler Mersin Ankara Potable Hafif Raylı Water Sistem Treatment Projesi (ANKARAY) Plant İşin Adı Project Name İşin Adı Project Name Location Yeri Mersin Ankara //Türkiye Türkiye 1992 Başlama ContractTarihi Date 1978 Bitiş Tarihi 1995 C Date 1996 ompletion Mersin Potable Başkent Ankara'nın Water ulaşım Treatment sorununa Plant çağdaş constructed bir çözüm to olarakthe meet yapılan waterAnkaray-Hafif requirements Raylı for theToplu citiesTaşım of Mersin and Sisteminin Tarsus, wasinşaatı completed ile ilgiliintopografik, three stages, jeolojik each ve having jeoteknik a etütler yapılmış, capacity of 130,000 güzergah, m³/day.güzergah Yüksel Proje yapıları, has prepared istasyonlar, all of the architectural, depo sahasıstructural, ve atölye electrical, binasına ait mechanical uygulama and infrastructural projeleri hazırlanmıştır. detailed design for the plant, which operates fully automatically and includes all of the Sistemin Özellikleri functional units, such as the raw water pumping station, aeration structures, coagulation Hat uzunluğu : 8.7 km,tanks, çift hatcyclo-floc type settling tanks, fast sand filters, disinfection tanks, clean Yolcu Kapasitesi : 25,000 yolcu/yön/saat water storage tanks, chemical building, chlorine building, Enerji Besleme : 3. ray sludge thickening and dewatering İstasyon : 11 ad. units. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 A Bursa nkaraWest Hafifand Raylı East Sistem Wastewater P rojesi (ANKARAY) Treatment Plants, Hamitler Solid Waste Leachate Treatment Plant Yeri Ankara / Türkiye Tarihi BaşlamaLocation 1992 Bursa / Türkiye Contract Bitiş Tarihi 1995 Date 2003 C ompletion Date 2006 Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm olarak yapılan Ankaray-Hafif Raylı Toplu Taşım Yüksel Proje supervised the process, structural and Sisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik electro-mechanical designs prepared by the contractor, etütler yapılmış, güzergah, güzergah yapıları, and provideddepo consulting supervision services istasyonlar, sahasıand ve atölye binasına ait during the construction. uygulama projeleri hazırlanmıştır. The process employed in the waste-water treatment Sistemin Özellikleri plants is the extended-aeration activated sludge process Hat uzunluğu : 8.7 km, çift hat with nitrogen and phosphorous removal and generating Yolcu Kapasitesi : 25,000 yolcu/yön/saat stable sludge. Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) The sludge from the treatment Delme Tünel : 2,000 mwill be mechanically dewatered and then limed and deposited.The leachate Aç-Kapa Tünel : 6,000 m plant built for the Hamitler: 1,000 Land fill Hemzemin ve Yarma m is planned to serve until the year 2025 with its:3-staged biological treatment Maksimum hız 80 km/saat and sludge dewatering units. İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Treatment Plants - Characteristics East Plant : 240,000 m3/day (Phase 1) 320,000 m3/day (Phase 2) West Plant : 87,500 m3/day (Phase 1) 175,000 m3/day (Phase 2) 3 Hamitler Plant : 500 m /day (seepage) Infrastructure Raylý SistemlerProjects Tarsus Ankara Wastewater Hafif Raylı Sistem Project Projesi (ANKARAY) Location Tarsus / Türkiye İşin Adı Project Name Contract Date Yeri 1998 Ankara / Türkiye Infrastructure Raylý SistemlerProjects Riyadh Ankara -Hafif Quassim Raylı Water Sistem Transmission Projesi (ANKARAY) Line and Water Yeri Reservoirs Ankara / Türkiye İşin Adı Project Name C Date 2005 Bompletion aşlama Tarihi 1992 BaşlamaLocation Tarihi Date 1984 Contract Bitiş Tarihi 1995 Bitiş Tarihi 1995 A 'Master Plan' was prepared to determine the shortterm, medium-term and long-term infrastructure Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm requirements for Tarsus. Then preliminary designs and olarak yapılan Ankaray-Hafif Raylı Toplu Taşım FIDIC-based construction tender documents were Sisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik prepared for water supply, stormwater and wastewater etütler yapılmış, güzergah, güzergah yapıları, networks and the Wastewater Treatment Plant. istasyonlar, depo sahası ve atölye binasına ait Additionally, supervision services were provided for the uygulama projeleri hazırlanmıştır. construction of infrastructure and treatment plants, which were contracted in three packages. Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat Treatment Plant Yolcu Kapasitesi 25,000 yolcu/yön/saat Treatment is based on a :mechanically activated sludge Enerji Besleme 3. rayfor carbon and nitrogen treatment process, which :allows İstasyon as well as sludge : 11stabilization. ad. (yeraltı ist.) separation, Tünel : Delme Daily Flow : 2,000 43,000mm3/day Aç-Kapa Tünel m Average Dry Air Flow : : 6,000 2,550 m³/hr ve Air Yarma m Hemzemin Maximum Dry Flow : : 1,000 3,830 m³/hr Maksimum hız : 80 km/saat Water Supply İşletme Hızı Network : 35 km/saat 133 km. of long water supply network consisting of PVC İşletmeye alındığı tarih : Ağustos 1996 and cast-iron pipes, with diameters varying between 80 and 500 mms. Stormwater Drainage and Wastewater Drainage 135 km. of long stormwater network, consisting of concrete/reinforced concrete pipes, with diameters varying between 300 and 2,200 mms, and 176 km. long wastewater collector and network consisting of HDPE pipes, with diameters varying between 250 and 1,400 mms. Riyadh 1992 / S. Arabia Completion Date 1985 Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm olarak Ankaray-Hafif Raylı Toplu Taşım Yükselyapılan Proje has carried out the topographical, geological Sisteminin inşaatısurveys, ile ilgili topografik, jeolojik ve jeoteknik and geotechnical prepared the detailed designs etütler yapılmış, güzergah, yapıları, for a transmission line and güzergah post-tensioned water tanks, istasyonlar, depo atölye binasına aittreatment built to convey thesahası water ve from Jubail seawater uygulama facilities toprojeleri Qassim hazırlanmıştır. City and Riyadh, Saudi Arabia. Characteristics Sistemin Özellikleri Transmission Line :414 km, F 1,600 mm Hat uzunluğu : 8.7 km, çift hat prestressed concrete piping Yolcu Kapasitesi : 25,000 yolcu/yön/saat :20 km, F 2,000 mm prestressed Enerji Besleme : 3. ray concrete piping İstasyon : 11 ad. (yeraltı ist.) Water Tanks :6 ea 50,000 m3, post-tensioned Delme Tünel : 2,000 m 11 ea 20,000 m3, post-tensioned Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum-hız : 80 Water km/saat Project Name Yanbu Medinah İşletme Hızı : 35 km/saat Transmission Water İşletmeye alındığı tarihLine : Ağustos 1996 Tanks Location S. Arabia Contract Date 1994 Completion Date 1996 Yüksel Proje has prepared the working drawings for the cylindrical reinforced concrete water tanks constructed to convey the seawater treated in Yanbo to inside Yanbo city, Medinah and Rayis. Characteristics Yanbu :Foundations for 4x140,000 m³ steel tanks Hamra :2 x 25,000 m³ reinforced concrete tanks Medinah and Musayjeed :12 x 50,000 m³ reinforced concrete tanks Badr :1 x 25,000 m³ reinforced concrete tanks Rayis :1 x 5,000 m³ reinforced concrete tanks Furays :1 x 1,000 m³ reinforced concrete tanks Infrastructure Raylý SistemlerProjects İşin Adı Project Name Çamlıdere DamA nkara Hafif RaylıAnkara SistemWater İşin Adı Project Name Ankara // Türkiye Türkiye Ankara 2004 1992 Transmission Lines P rojesi (ANKARAY) Location Yeri ContractTarihi Date Başlama Completion Date Bitiş Tarihi 2004 1995 Existing water transmission lines between Çamlıdere Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm Dam and Ankara İvedik Treatment Plant were surveyed olarak yapılan Ankaray-Hafif Raylı Toplu Taşım structurally and geotechically in order to determine their Sisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik rehabilitation requirements, prepare their operating plans etütler yapılmış, güzergah, güzergah yapıları, and operational safety measures, and the necessary istasyonlar, depo sahası ve atölye binasına ait investment planning. Then the detailed design for the uygulama projeleri hazırlanmıştır. alignment and cathodic protection of a 3.5 km section of the existing Çamlıdere Line 2 were prepared. In addition, Sistemin Özellikleri the communication and automation systems of the Hat uzunluğu : 8.7 km, çift hat existing line were investigated and the necessary Yolcu Kapasitesi : 25,000 yolcu/yön/saat drawings were prepared for integration with the existing Enerji Besleme : 3. ray ASKİ SCADA system. İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Çamlıdere Water Intake Facility Aç-Kapa : 6,000 Tunnels Tünel : Tunnel T1: 4m km, Tunnel T2: 3 km, Tunnel Hemzemin ve Yarma : 1,000 m T3: 16.5 km MaksimumLine hız 1 : 61 km, : 80 km/saat Çamlıdere Ø2,200 mm İşletme Hızı : 35 km/saat Çamlıdere Line 2 : 62 km, Ø2,200 mm İşletmeye alındığı tarih : Ağustos 1996 Çankaya District Wastewater and Rainwater Project Project Name Location Ankara / Türkiye Contract Date 2001 Completion Date 2001 Yüksel Proje has prepared the detailed design and the construction tender documents for the wastewater and stormwater networks in 13 district of Çankaya County. Project Characteristics Wastewater Network : 80 km, Ø300-800 mm concrete piping Stormwater Network : 33 km, Ø300-800 mm concrete piping Kurtboğazı Dam - Ankara İvedik Treatment Plant Water Transmission Line III Project Name Location Ankara / Türkiye Contract Date 2004 Completion Date Infrastructure Raylý SistemlerProjects 2004 For the new transmission line to be added to the existing transmission line between Kurtboğazı Dam, an important reservoir supplying water to Ankara, and İvedik Treatment Plant, strip map of the alignment was prepared, and geological and geotechnical surveys were conducted. Then hydraulic calculations were made of the transmission line to determine pipe type and pressure classes. Yüksel Proje also prepared detailed design, and the construction tender documents for the transmission line and the structures required on it, including a cathodic protection system. Project Characteristics: Transmission Line Length :43.3 km Pipe Type :Ø 2,200 mm steel pipe, t:18 mm A Baku nkara - Tbilisi Hafif Raylı - Ceyhan Sistem Crude P rojesi (ANKARAY) Oil Pipeline Location Yeri Ankara Ceyhan/ /Türkiye Türkiye ContractTarihi Date 1992 2001 Başlama C Date 1995 2002 ompletion Bitiş Tarihi This project intends ulaşım to convey the crude oil produced in Başkent Ankara'nın sorununa çağdaş bir çözüm the Region, principally the Azerian through olarak yapılan Ankaray-Hafif RaylıOil, Toplu Taşıma pipeline beginning Bakuileand at Ceyhan for Sisteminin at inşaatı ilgili ends topografik, jeolojikTerminal ve jeoteknik international shipping by tankers. The pipeline section etütler yapılmış, güzergah, güzergah yapıları, lying in Türkiye kms For 550 kmait part of this istasyonlar, depo1,074 sahası velong. atölye binasına section between Refahiye and Ceyhan, Yüksel Proje: uygulama projeleri hazırlanmıştır. Conducted topographical, geotechnical, seismic, Sistemin Özellikleri hydrological, and archeological survey and determined Hat uzunluğu : 8.7 km, çift hat the 22 m wide corridor and centerline of the pipeline, Yolcu Kapasitesi : 25,000 yolcu/yön/saat Conducted test pits, soil drillings, in situ and lab tests, Enerji Besleme : 3. ray Prepared 1/25,000 scale geological maps and İstasyon : 11 ad. (yeraltı ist.) Delme geotechnical Tünelreports, : 2,000 m Prepared detailed design of the alignment in Aç-Kapa Tünel : 6,000 m 1/25,000&1/5,000 scale,: 1,000 m Hemzemin ve Yarma Prepared detailed designs for crossings such as roads, Maksimum hız : 80 km/saat creeks, pipeline, etc. İşletme Hızı : 35 km/saat Prepared detailed design for valve houses as well as İşletmeye alındığı tarih : Ağustos 1996 power supply At Ceyhan Terminal, it conducted topographical and geotechnical survey and prepared the detailed designs for: 3 Steel tank foundations (7x150,000 m ), Fire fighting, laboratory, operation and transformer buildings, Control and, administrative buildings, warehouse, workshop, heating center, restaurant buildings and houses and guest houses, Infrastructure of the whole site. YÜKSEL PROJE İşin Adı Ankara Hafif Raylı Sistem Industrial Facilities Raylý Sistemler Projesi (ANKARAY) Horezm Sugar Factory Yeri Ankara / Türkiye Noksel İskenderun and Hendek Steel Pipe Factories Başlama Tarihi 1992 Kabul Bottling Factory Bitiş Tarihi 1995 Türk Tuborg Additional Bottling and Depot Building Raylý Sistemler Hafif Raylı Sistem P rojesi (ANKARAY) İşin Adı Ankara Yeri Ankara / Türkiye Başlama Tarihi 1992 Bitiş Tarihi 1995 Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm olarak yapılan Ankaray-Hafif Raylı Toplu Taşım Sisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik etütler yapılmış, güzergah, güzergah yapıları, istasyonlar, depo sahası ve atölye binasına ait uygulama projeleri hazırlanmıştır. Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm olarak yapılan Ankaray-Hafif Raylı Toplu Taşım Sisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik etütler yapılmış, güzergah, güzergah yapıları, istasyonlar, depo sahası ve atölye binasına ait uygulama projeleri hazırlanmıştır. Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Industrial Facilities Raylý Sistemler İşin Adı Project Name A Horezm nkara Hafif Sugar Raylı Factory Sistem Projesi (ANKARAY) Location Yeri Ankara Horezm/ /Türkiye Uzbekistan ContractTarihi Date 1992 1996 Başlama C Date 1995 1997 ompletion Bitiş Tarihi A sugar factory, Başkent Ankara'nın withulaşım a sugarbeet sorununa processing çağdaş capacity bir çözüm of olarak tons/day, 3,000 yapılan Ankaray-Hafif was built in Horezm Raylı Toplu city of Taşım the Republic Sisteminin of Uzbekistan inşaatı withileofilgili (21,500 topografik, m2) total jeolojik covered ve jeoteknik area. etütler yapılmış, Yüksel Proje hasgüzergah, preparedgüzergah the architectural, yapıları, structural, istasyonlar, electrical and depo mechanical sahası ve equipment, atölye binasına and infrastructural ait uygulama detailed designs. projeleri This hazırlanmıştır. factory was also the first of its kind built abroad by Türkiye using Turkish technology. Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Industrial Facilities Raylý Sistemler A Noksel nkara Hafif İskenderun Raylı Sistem and P Hendek rojesi (ANKARAY) Steel Pipe Factories İşin Adı Project Name Location Yeri Ankara İskenderun / Türkiye and Hendek / Türkiye ContractTarihi Date 1992 İskenderun Factory : 1986 Başlama Hendek Factory : 2000 Bitiş Tarihi 1995 C ompletion Date İskenderun Factory : 1986 Başkent HendekAnkara'nın Factory ulaşım : 2000 sorununa çağdaş bir çözüm olarak yapılan Ankaray-Hafif Raylı Toplu Taşım For the spirally steel pipejeolojik factories built in Sisteminin inşaatı welded ile ilgili topografik, ve jeoteknik İskenderun and Hendek by Noksel Çelik Boru Sanayi etütler yapılmış, güzergah, güzergah yapıları, A.Ş. (Nokseldepo Steelsahası Pipe Industry Co., Inc.), and istasyonlar, ve atölye binasına ait the later addition of projeleri ERW factory, Yüksel Proje has conducted the uygulama hazırlanmıştır. topographical, geological and geotechnical surveys and prepared structural electrical and mechanical and Sistemin the Özellikleri infrastructural detailed design. Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat İskenderun Factory 3. ray area Enerji Area Besleme :14,000 m2 : covered : 11 steel ad. (yeraltı İstasyon Product :Spirally welded pipe, d:ist.) 8"-120" Delme Tünel 2,000 m and t: 4-20 :mm Aç-Kapa Tünel : 6,000 m Capacity :100,000 tons/year Hemzemin ve Yarma : 1,000 m Hendek Factory Maksimum hız : 80 km/saat Area :16,000 m2 : covered area İşletme Hızı 35 km/saat Product :Spirally welded steel pipe, d: 16"-120" İşletmeye alındığı tarih : Ağustos 1996 and t: 4-26 mm Capacity :100,000 tons/year ERW Factory Area :21,000 m2 covered area Product :Longitudinally welded pipe, d: ½" - 4½" and t: 0.7-6.3 mm. Capacity :100,000 tons/year Industrial Facilities Raylý Sistemler Project İşin Adı Name A Knkara abul Bottling Hafif Raylı Factory Sistem Projesi (ANKARAY) Location Yeri Ankara Kabul / Afghanistan / Türkiye Industrial Facilities Raylý Sistemler Project İşin Adı Name A Türk nkara Tuborg Hafif Additional Raylı Sistem P Bottling rojesi (ANKARAY) and Depot Building Location Yeri Ankara İzmir / Türkiye / Türkiye ContractTarihi Date 1992 2004 Başlama ContractTarihi Date 1992 2001 Başlama Date 1995 2005 Completion Bitiş Tarihi Date 1995 2002 Completion Bitiş Tarihi Factory Ankara'nın Başkent area that is ulaşım 10,000 sorununa m2 consists çağdaş of bir Bottling çözüm Building, olarak yapılan mechanical Ankaray-Hafif building, Raylı transformer, Toplu Taşımrecreation building, Sisteminin storage inşaatıbuilding ile ilgili and topografik, administration jeolojik building. ve jeoteknik etütler yapılmış, güzergah, güzergah yapıları, The istasyonlar, topographical, depo sahası preliminary ve atölyeand binasına detailaitdesign of architectural, uygulama projeleri structural, hazırlanmıştır. mechanical and electrical works were prepared. Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 The bottling and Depot building with Precast Başkent Ankara'nın ulaşım sorununa çağdaş Reinforced bir çözüm concrete column and steel construction The area of olarak yapılan Ankaray-Hafif Raylı Topluroof. Taşım 2. topografik, jeolojik ve jeoteknik the buildinginşaatı is 6,720 Sisteminin ilemilgili etütler yapılmış, güzergah, güzergah yapıları, The geological andsahası geotechnical studies wereaitcarried out istasyonlar, depo ve atölye binasına and preliminary detail design of architectural, uygulama projeleriand hazırlanmıştır. structural, mechanical and electrical works were prepared. Construction consultancy services has been provided. Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Raylý Sistemler Hafif Raylı Sistem P rojesi (ANKARAY) İşin Adı Ankara Yeri Ankara / Türkiye Başlama Tarihi 1992 Bitiş Tarihi 1995 Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm olarak yapılan Ankaray-Hafif Raylı Toplu Taşım Sisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik etütler yapılmış, güzergah, güzergah yapıları, istasyonlar, depo sahası ve atölye binasına ait uygulama projeleri hazırlanmıştır. Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 YÜKSEL PROJE İşin Adı Ankara Hafif Raylı Sistem Transportation Projects Projesi (ANKARAY) U lMass Transit Systems İstanbul Railway Bosphorus Tube Tunnel Crossing (MARMARAY) Raylý Sistemler Yeri Ankara / Türkiye ANKARAY; Ankara Light Rail System Project Başlama Tarihi 1992 Ankara Metro, AŞTİ - Çayyolu and Ulus - Keçiören Lines Bitiş Tarihi 1995 Eskişehir Light Rail System Project Raylý Sistemler Hafif Raylı Sistem P rojesi (ANKARAY) İşin Adı Ankara Yeri Ankara / Türkiye Başlama Tarihi 1992 Bitiş Tarihi 1995 Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm İzmir Light Rail System Project olarak yapılan Ankaray-Hafif Raylı Toplu Taşım Sisteminin inşaatı ile ilgili jeolojik ve jeoteknik topografik, Eskişehir -Köseköy High Speed Railway Project etütler yapılmış, güzergah, güzergah yapıları, İstanbul Taksim istasyonlar, depo sahasıve atölye Metro, binasına ait - 4. Levent and Taksim - Yenikapı Lines uygulama projeleri hazırlanmıştır. Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm olarak yapılan Ankaray-Hafif Raylı Toplu Taşım Sisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik etütler yapılmış, güzergah, güzergah yapıları, istasyonlar, depo sahası ve atölye binasına ait uygulama projeleri hazırlanmıştır. Sistemin Özellikleri Viaducts, Interchanges, Bridges Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 İstanbul Söğütlüçeşme Viaduct Hat uzunluğu : 8.7 km, çift hat :Ankara - Balık Interchange Yolcu Kapasitesi 25,000Etyolcu/yön/saat Enerji Besleme : 3. ray İzmir Göztepe Cable Stayed Pedestrian Bridge İstasyon : 11 ad. (yeraltı ist.) Delme Tünel 2,000 m Bridge :Gülburnu Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız 80 km/saat Highways ::Ankara - Pozantı Motorway ; Kemerhisar - Eminlik Section İşletme Hızı 35 km/saat İşletmeye alındığı tarih Ağustos 1996 :Gümüşova - Gerede Motorway Black Sea Coast Road Afghanistan State Roads İstanbul Railway Bosphorus Tube Tunnel Crossing Project Name Location İstanbul / Türkiye Contract Date 2001 Completion Date 2009 In terms of Design, Construction and Management methods, this is one of the biggest projects in the world. The population growth of İstanbul and the resulting aggravating traffic problem have urged a necessity for the improvement of the rail transit systems. As a result of the Urban Transport Survey in 1988, a decision was made to implement a rail transit system to capitalize the significant passenger potential, using the railway corridor already existing in the East-West direction. The project aims at: improving the existing double-track railway system between Gebze-Haydarpaşa and Sirkeci - Halkalı to a modern and higher technological standard, and joining both sides of İstanbul with the joining of the rail lines on both sides of the Bosphorus with a tunnel, crossing underneath, to provide an uninterrupted, advanced rapid rail transit system. These improvements are expected to ease the traffic congestion, reduce pollution, and thus System Characteristics Total Line Length : 76.3 km At Grade-Section Length : 62.7 km, 3 tracks Bored & Cut-and-Cover Tunneling : 12.2 km, 2 tracks Immersed Tunneling Length : 1.4 km, 2 tracks Underground Stations : 3 At Grade Stations : 37 Power Supply : 25,000 V catenary Metro Headway : 2-10 minutes Passenger Capacity : 75,000 passengers/ hr/one direction Yeri Ankara / Türkiye Bitiş Tarihi 1995 Kartal Atalar Cevizli Maltepe Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Başak Süreyya Plajı İdealtepe Küçükyalı Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm olarak yapılan Ankaray-Hafif Raylı Toplu Taşım Sisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik etütler yapılmış, güzergah, güzergah yapıları, istasyonlar, depo sahası ve atölye binasına ait uygulama projeleri hazırlanmıştır. Bostancı Suadiye Yedikule Kazlıçeşme enhance environmental conditions. The Project includes the planning for the addition third track allocated to the intercity passengers and cargo trains, while other two will be left for the metro system. The entire sub and superstructures, E&M systems, and stations of the existing system will be replaced, and İstanbul will have a 76.3 km long modern metro system in the East-West direction. Under the Contract, preliminary design drawings, and FIDIC-based international contract documents were prepared for the contract packages planned. Throughout the Project, Yüksel Proje will be supervising the preparation of the working drawings by the contractors for construction and electromechanical works, will be the execution and quality of the same works, including commissioning tests, and providing consulting and supervision services during the trial run period. Başlama Tarihi 1992 Erenköy Yenikapı Rail Systems Zeytinburnu Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Yenimahalle Ataköy Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm olarak yapılan Ankaray-Hafif Raylı Toplu Taşım Sisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik etütler yapılmış, güzergah, güzergah yapıları, istasyonlar, depo sahası ve atölye binasına ait uygulama projeleri hazırlanmıştır. Bakırköy Bitiş Tarihi 1995 Yeşilyurt Hafif Raylı Sistem P rojesi (ANKARAY) Göztepe Yeri Ankara / Türkiye Başlama Tarihi 1992 Ankara İşin Adı Feneryolu Ankara Üsküdar Hafif Raylı Sistem P rojesi (ANKARAY) İşin Adı Sirkeci Raylý Sistemler Söğütlüçeşme Raylý Sistemler Rail Systems Raylý Sistemler Hafif Light Raylı Rail System Sistem P (ANKARAY) rojesi (ANKARAY) Project İşin Adı Name Rail Systems Raylý Sistemler A Ankara nkara Hafif MetroRaylı Sistem AŞTİ - Çayyolu (M2) and P rojesi (ANKARAY) Ulus Keçiören (M4) Yeri Ankara / Türkiye Project İşin Adı Name Location Yeri Ankara / Türkiye A Ankara nkara Location Ankara / Türkiye Başlama Tarihi 1992 Date M2 : 2003 M4 : 2004 Contract Bitiş Tarihi 1995 C M4 : 2007 ompletion Date M2 : 2005 Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm Yüksel Proje has conducted the topographical, olarak yapılan Ankaray-Hafif Raylı Toplu Taşımgeological and geotechnical surveys for the construction of the Sisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik AŞTİ-Çayyolu (M2) and Ulus-Keçioren (M4) sections of etütler yapılmış, güzergah, güzergah yapıları, Ankara Metro, hassahası prepared the detailed designs istasyonlar, depo ve atölye binasına ait for the alignment, structures, stations, the yard and the shop uygulama projeleri hazırlanmıştır. building during the staged implementation, as well as the final drawings for the Electromechanical Works. Sistemin Özellikleri Hat uzunluğu : 8.7 km, çift hat System Characteristics : 25,000 yolcu/yön/saat Yolcu Kapasitesi Passenger Capacity : 65,000 passengers/ Enerji Besleme : 3. ray direction/hr İstasyon : 11 ad. (yeraltı ist.) Power Supply : 750 m V DC, 3. rail Delme Tünel : 2,000 Maximum Speed : 80 km/hr Aç-Kapa Tünel : 6,000 m Operating Speed : 35 km/hr Hemzemin ve Yarma : 1,000 m Maksimum hız (M2) : 80 km/saat KızılayÇayyolu İşletme Line Length Hızı : 35 : 9.39 km/saat km, double track İşletmeye Stations alındığı tarih : Ağustos : 7 (underground) 1996 Bored Tunneling : 2,000 m Cut-and-Cover Tunneling : 7,190 m Grade and Cut Sections : 200 m ContractTarihi Date 1992 Başlama Date 1995 Completion Bitiş Tarihi Başkent çağdaş çözüm Ankaray Ankara'nın - Light Rail ulaşım Transit sorununa System, which wasbirinvented olarak yapılan Ankaray-Hafif Toplu Taşım as a contemporary solution toRaylı the transport problems in Sisteminin ile ilgili topografik, jeolojik jeoteknik the capitalinşaatı city Ankara. Yüksel Proje has ve conducted etütler yapılmış,geological güzergah, güzergah yapıları, topographical, and geotechnical surveys, and istasyonlar, depo sahası ve atölye binasına ait related prepared the detailed design for the alignment, uygulama structures,projeleri stations,hazırlanmıştır. service yard and the shop building. Sistemin Özellikleri System Characteristics : 8.7 km,km, çiftdouble hat track Hat Lineuzunluğu Length : 8.7 Kapasitesi : 25,000 yolcu/yön/saat Yolcu Passenger Capacity : 25,000 passengers/ Enerji Besleme : 3. ray direction/hr : 11: 3. ad.rail (yeraltı ist.) İstasyon Power Supply Tünel : 2,000 m Delme Stations : 11 (underground) Tünel : 6,000 mm Aç-Kapa Bored Tunneling : 2,000 ve Yarma : 1,000 mm Hemzemin Cut-and-Cover Tunneling : 6,000 hız Sections : 80: 1,000 km/saat Maksimum Grade and Cut m Hızı : 35: 80 km/saat İşletme Maximum Speed km/hr tarih : Ağustos 1996 İşletmeye Operating alındığı Speed : 35 km/hr Commissioning Date : August 1996 Ulus-Keçiören (M4) Line Length : 9.60 km, double track Stations : 9 (underground) Bored Tunneling (NATM) : 3,300 m Bored Tunneling (TBM) : 3,000 m Cut-and-Cover Tunneling : 3,300 m Ankara Light Rail System Project ANKARAY LRST M4 Section M2 Section M1 Section Gazino Dutluk Macunköy Sincan Hastane Yenimahalle Kuyubaşı Ostim Mecidiye İvedik Demetevler Meteoroloji Akköprü Batıkent Dışkapı Kültür Merkezi Belediye Aski Ulus Beşevler Tandoğan Bahçelievler Emek Köy Hizmetleri Çayyolu 1 Çayyolu 2 Çayyolu 3 Ümitköy Beytepe Bilkent Maltepe Demirtepe AŞTİ ODTÜ Söğütözü MTA Sıhiye Kolej Kızılay Milli Kütüphane Necatibey Dikimevi Kurtuluş Rail RaylýSystems Sistemler Eskişehir A nkara Hafif Light Raylı RailSistem Projesi (ANKARAY) Project System Project İşin Adı Name Yeri Ankara / Türkiye Location Eskişehir / Türkiye Rail RaylýSystems Sistemler İşin Adı Project Name İzmir A nkara Hafif Raylı Sistem Light Rail System Project Projesi (ANKARAY) Location İzmir / Türkiye Contract Date Yeri Ankara 1995 / Türkiye Başlama 1992 ContractTarihi Date 2003 Date 1992 1999 C Bompletion aşlama Tarihi Bitiş Tarihi Date 1995 2005 Completion In the Eskişehir Başkent Ankara'nınLight ulaşım Rail sorununa Project,çağdaş to connect bir çözüm the olarak yapılan Ankaray-Hafif northwest/southeast and southwest/northeast Raylı Toplu Taşım areas of Sisteminin the city, Yüksel inşaatıProje ile ilgili has topografik, supervised jeolojik the ve contractor's jeoteknik etütler yapılmış, detailed designs güzergah, for construction güzergah and yapıları, electromechanical istasyonlar, works, the depo execution sahası and ve quality atölye binasına of the same ait works uygulama during construction, projeleri hazırlanmıştır. including commissioning tests, and has provided consulting and supervision services during Sistemin the trial runÖzellikleri period. Hat uzunluğu : 8.7 km, çift hat System Characteristics : 25,000 yolcu/yön/saat Yolcu Kapasitesi Line EnerjiLength Besleme : 3. ray :16.5 km, double track Passenger İstasyon Capacity : 11 :9,800 ad. (yeraltı passengers/ ist.) direction/hr Delme Tünel : 2,000 m Aç-Kapa Power Supply Tünel : 6,000 :750 m V DC, catenary Stops Hemzemin ve Yarma : 1,000 :26mgrade level Maximum MaksimumSpeed hız : 80 :70 km/saat km/hr Operating İşletme Hızı Speed : 35 :25 km/saat km/hr Yard İşletmeye Area alındığı tarih : Ağustos :60,000 1996 m2 2 Operations and Shop Bled. :6,600 m covered area Commissioning Date :December 2004 Bitiş Tarihi 1995 In the Üçyol-Bornova section (comprising Stage 1) of the İzmir Light Rail Project, which was planned as a Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm contemporary solution to the transport problems of İzmir, olarak yapılan Ankaray-Hafif Raylı Toplu Taşım the third largest cityilgiliintopografik, Türkiye, jeolojik Yüksel ve Proje has Sisteminin inşaatı ile jeoteknik supervised: the detailed design prepared by the Contractor etütler yapılmış, güzergah, güzergah yapıları, for civil and electro-mechanical works, the execution and istasyonlar, depo sahası ve atölye binasına ait quality of the same works during construction, including uygulama projeleri hazırlanmıştır. commissioning tests, and the consulting and supervision services the trial run period. Under the same Sisteminduring Özellikleri Hat uzunluğu : 8.7provided km, çift the hattopographical, contract, Yüksel Proje has also Yolcu Kapasitesi : 25,000 yolcu/yön/saat geological and geotechnical surveys and prepared the Enerji Besleme : 3. ray report and contract preliminary designs, a feasibility İstasyon : 11 ad. (yeraltı ist.) (Merkez) documents for the Bornova (Hastane)-Bornova Delme Tünel and Üçyol-F. Altay section.: 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma System Characteristics : 1,000 m Maksimum hız : 80 km/saat Line Length :11,133 km, double track İşletme Hızı : 35 km/saat Passenger Capacity :45,000 passengers/ İşletmeye alındığı tarih : Ağustos 1996 direction/hr Power Supply :3. rail Stations :10 Bored Tunneling (EPBM) :1,352 m Bored Tunneling (NATM) :1,597 m Cut-and-Cover Tunneling :1,443 m Bridges, Viaducts :4,712 m Grade and Cut Sections :2,545 m Yard Area :55,500 m2 Shop Building :10,500 m2 covered area Maximum Speed :80 km/hr Operating Speed :45 km/hr Commissioning Date :August 2000 Rail RaylýSystems Sistemler Project İşin Adı Name Askişehir E nkara Hafif - Köseköy High Raylı Sistem P Speed rojesiRailway (ANKARAY) Project Rail Systems Raylý Sistemler Location Yeri Eskişehir Ankara / Türkiye / Türkiye ContractTarihi Date 2003 Başlama 1992 Date 1995 2005 Completion Bitiş Tarihi Başkent Ankara'nın ulaşımsection sorununa çağdaş bir çözüm For the Eskişehir-Köseköy of the Ankara-İstanbul olarakSpeed yapılan Ankaray-Hafif Raylı Toplu Taşım High Railway Project, which intends to reduce the Sisteminin ile ilgili to topografik, ve jeoteknik travel time inşaatı from Ankara İstanbul jeolojik to 3 hours and 16 etütler yapılmış, güzergah,geological güzergah yapıları, minutes, topographical, and geotechnical istasyonlar, depo sahası veand atölyedetailed binasınadesigns ait surveys were conducted and uygulama projeleri construction tenderhazırlanmıştır. documents were prepared for the alignment, the viaducts, the tunnels, stations and underSistemin Özellikleri passes and overpasses. Hat uzunluğu : 8.7 km, çift hat Yolcu Kapasitesi System Characteristics : 25,000 yolcu/yön/saat Line EnerjiLength Besleme : 187 3. ray km, double track Power İstasyon : 25,000 11 ad. (yeraltı ist.) Supply V, catenary Design Delme Tünel : 250 2,000 m Speed km/hr Aç-Kapa : 3,500 6,000 m m Minimum Tünel Curve Radius: Maximum HemzeminGradient ve Yarma : % 1,000 0.16m Stations Maksimum hız : 880 km/saat Bored İşletmeTunnels Hızı : 39 35 ea; km/saat total length 40 km Viaducts İşletmeye alındığı tarih : 20 Ağustos 1996 ea; total length 11.4 km İstanbul Metro A nkara Hafif Raylı Sistem Taksim 4. Levent and P rojesi -(ANKARAY) Taksim Yenikapı Sections Yeri Ankara / Türkiye Project İşin Adı Name BaşlamaLocation Tarihi İstanbul / Türkiye 1992 Date Taksim-4 Levent :1991 Yenikapı-Taksim : 1995 Contract Bitiş Tarihi 1995 Completion Date Taksim-4 Levent :1998 Yenikapı-Taksim : ----Başkent Ankara'nın ulaşım sorununa çağdaş bir çözüm olarak yapılan Raylı Toplu Taşım For Taksim - 4.Ankaray-Hafif Levent and Taksim-Yenikapı sections of Sisteminin inşaatı ile ilgiliYüksel topografik, jeolojik ve jeoteknik the İstanbul Metro, Proje performed the etütler yapılmış,geological güzergah, güzergah yapıları, surveys, topographical, and geotechnical istasyonlar, depo sahası ve atölye design, binasınaprepared ait upgraded the existing preliminary the uygulama projeleri final design for the hazırlanmıştır. alignment, alignment structures and stations; and tender documents for construction and Sistemin Özellikleri works. It has also provided electromechanical construction services Hat uzunluğu supervision : 8.7 km, çift hat during the construction and the commissioning periods. Yolcu Kapasitesi : 25,000 yolcu/yön/saat Enerji Besleme : 3. ray System Characteristics : 11 ad. (yeraltı ist.) İstasyon Passenger Capacity :70,000 passengers/direction/hr Delme Tünel : 2,000 m Power Supply :3.:rail Aç-Kapa Tünel 6,000 m Maximum Speed :80: km/hr Hemzemin ve Yarma 1,000 m Operating Speed :40: km/hr Maksimum hız 80 km/saat İşletme- Hızı : 35 km/saat Taksim 4. Levent alındığı tarih : Ağustos 1996 İşletmeye Section Length :8.5 km, double track Stations :6 (underground) Bored Tunneling :18,500 m Commissioning Date:August 2000 Yenikapı - Taksim Section Length :5.2 km, double track Stations :3 (underground) and 1 (viaduct) Bored Tunnels :2 x 3,380 m, 270 m, single tube Bridges :Golden Horn Crossing Bridge, 460 m and Access Bridge, 250 m Interchanges, Bridges, Viaducts Raylý Sistemler Interchanges, Bridges, Viaducts Raylý Sistemler Project İşin Adı Name Project İşin Adı Name İstanbul Söğütlüçeşme A nkara Hafif Raylı Sistem rojesi (ANKARAY) P Viaduct Location Yeri Ankara İstanbul/ /Türkiye Türkiye Ankara A nkara Et - Balık Hafif RaylıInterchange Sistem P rojesi (ANKARAY) Yeri Ankara / Türkiye Location ContractTarihi Date 1992 1978 Başlama Başlama ContractTarihi Date 1992 1997 Date 1995 1978 Completion Bitiş Tarihi Completion Bitiş Tarihi Date 1995 1997 Söğütlüçeşme Başkent Ankara'nın Viaduct, ulaşım is the sorununa first prestressed çağdaş bir reinforced çözüm olarak yapılan concrete railway Ankaray-Hafif bridge constructed Raylı Toplu in Türkiye. Taşım Yüksel Sisteminin Proje has conducted inşaatı ile ilgili the topografik, topographical, jeolojik geological ve jeoteknik and etütler yapılmış, geotechnical surveys güzergah, and prepared güzergah theyapıları, detailed designs. istasyonlar, depo sahası ve atölye binasına ait uygulama System Characteristics projeleri hazırlanmıştır. Total Length :504 m Sistemin Özellikleri Railway Tracks :4 lines Bridge Hat uzunluğu Spans : 8.7:18 km, xçift 28hat m each Construct. Yolcu Kapasitesi Completion Date : 25,000 :October yolcu/yön/saat 1979 Enerji Besleme : 3. ray İstasyon : 11 ad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 This 3-level Başkent Ankara'nın interchange ulaşımprovides sorununafor çağdaş an underpass, bir çözüm olarak yapılan overpass and grade Ankaray-Hafif crossingRaylı at theToplu same Taşım point. Yüksel Sisteminin Proje has inşaatı conducted ile ilgili traffic topografik, counts jeolojik and topographical, ve jeoteknik etütler yapılmış, geological and geotechnical güzergah, güzergah surveys yapıları, and prepared the istasyonlar, detailed designs. depo At sahası the interchange, ve atölye binasına a viaduct aitwas used uygulama for the Konya-Samsun projeleri hazırlanmıştır. access, an underpass for the Ulus-İstanbul transition and grade crossings for all of the Sistemin left turns. Özellikleri Hat uzunluğu : 8.7 km, çift hat System Characteristics : 25,000 yolcu/yön/saat Yolcu Kapasitesi Enerji Viaduct Besleme : 3.: 233 ray m İstasyon Interchange Arm Bridges : 11 : 94 ad.m(yeraltı ist.) Delme Underpass Tünel : 2,000 : 104 m m Aç-Kapa U-Section Tünel : 6,000 : 205 m m Hemzemin Opened to Traffic ve Yarma : 1,000 : 1997m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Raylý Interchanges, Sistemler Bridges, Viaducts Project İşin Adı Name A İzmir nkara Göztepe Hafif Raylı Cable Sistem Stayed rojesi (ANKARAY) P Pedestrian Bridge Yeri Ankara / Türkiye Location İzmir / Türkiye Interchanges, Bridges, Viaducts Raylý Sistemler Gülburnu Bridge A nkara Hafif Raylı Sistem P rojesi (ANKARAY) Project İşin Adı Name Location Yeri Ankara Giresun/ /Türkiye Türkiye Başlama ContractTarihi Date 1992 1997 ContractTarihi Date 1992 2005 Başlama Completion Bitiş Tarihi Date 1995 1997 Date 1995 2007 Completion Bitiş Tarihi An inclined Başkent Ankara'nın suspension ulaşım pedestrian sorununa bridge çağdaş wasbir built çözüm over olarak the road yapılan parallel Ankaray-Hafif to the the sea Raylı at Toplu Göztepe/İzmir, Taşım which Sisteminin was the first inşaatı of itsile kind ilgili topografik, in Türkiye.jeolojik YükselveProje jeoteknik has etütler yapılmış, performed the güzergah, topographical, güzergah geological yapıları, and geoistasyonlar, technical surveys depo sahası and prepared ve atölye thebinasına detailed designs. ait uygulama projeleri hazırlanmıştır. System Characteristics Sistemin Özellikleri :126 m Total Length Type Hat uzunluğu :Cable : 8.7 Stayed km, çiftPedestrian hat Bridge Girder Yolcu Kapasitesi :Steel : 25,000 yolcu/yön/saat Pylon Enerji Height Besleme :28: m 3. ray Main İstasyon Span :90: m 11 ad. (yeraltı ist.) Commissioning Delme Tünel Date:1997 : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Gülburnu Bridge, which will sorununa be positioned at Km Başkent Ankara'nın ulaşım çağdaş bir 20+362 çözüm between Giresun and EspiyeRaylı in scope the Black Sea olarak yapılan Ankaray-Hafif TopluofTaşım Coast Road Improvement Project, will be the largestSisteminin inşaatı ile ilgili topografik, jeolojik ve jeoteknik span bridge güzergah in Türkiye.yapıları, Yüksel Proje has etütlerpost-tensioned yapılmış, güzergah, performed the topographical, istasyonlar, depo sahası ve atölyegeological binasına ait and has geotechnical surveys and prepared the detailed design uygulama projeleri hazırlanmıştır. for this bridge using the balanced cantilever method. Sistemin Özellikleri Project Characteristics : 8.7 km, çift hat Hat uzunluğu :330 m Total YolcuLength Kapasitesi : 25,000 yolcu/yön/saat Width +1.00) = Carriageway Enerji Besleme : 3.:2x(2.50+11.00 ray 2 x14.50 m ist.) İstasyon : 11 ad. (yeraltı :82.5m+ 165 + 82.5 m Spans Delme Tünel : 2,000 Cross-section Heights : 6,000 :825m cm at the supports Aç-Kapa Tünel and 350 cm at the center Hemzemin ve Yarma : 1,000 m :12,000 Superstructure Maksimum hızWeight : 80 km/saattons (for one bridge) İşletme Hızı : 35 km/saat andtarih Nos.: Ağustos :Friction1996 Pendulum Supports İşletmeyeType alındığı (2x2 = 4 ea) (for one bridge) Foundation Type and Size :Pile foundation, 22 x 32 x 2.50 m Highways Raylý Sistemler Hafif - Pozantı RaylıMotorway; Sistem P rojesi (ANKARAY) Kemerhisarhisar - Eminlik Section Project İşin Adı Name A Ankara nkara Yeri Ankara Türkiye Location Niğde / /Türkiye Highways Raylý Sistemler Raylı Gerede Sistem Motorway P rojesi (ANKARAY) Project İşin Adı Name A Gümüşova nkara Hafif- Location Yeri Ankara Bolu / Türkiye / Türkiye Başlama ContractTarihi Date 1992 2001 ContractTarihi Date 1992 1987 Başlama Completion Bitiş Tarihi Date 1995 2007 Date 1995 2006 Completion Bitiş Tarihi For Kemerhisar Başkent Ankara'nın - Eminlik ulaşım section sorununa of çağdaş Ankara bir - Pozantı çözüm olarak yapılan Motorway, consulting Ankaray-Hafif servicesRaylı are being Toplu provided, Taşım which Sistemininthe includes inşaatı supervision ile ilgili topografik, and quality jeolojik control ve jeoteknik of the etütler yapılmış, construction and güzergah, electromechanical güzergah works. yapıları, istasyonlar, depo sahası ve atölye binasına ait uygulama Project Characteristics projeleri hazırlanmıştır. Length :55 km Sistemin Viaduct Özellikleri :1 ea, 522.50 m Overpass Hat uzunluğu Bridge :1 ea : 8.7 km, çift hat Underpass Yolcu Kapasitesi Bridges :10:ea 25,000 yolcu/yön/saat Underpasses Enerji Besleme :41:ea 3. ray Hydraulic İstasyon Structures:126 : 11 eaad. (yeraltı ist.) Delme Tünel : 2,000 m Aç-Kapa Tünel : 6,000 m Hemzemin ve Yarma : 1,000 m Maksimum hız : 80 km/saat İşletme Hızı : 35 km/saat İşletmeye alındığı tarih : Ağustos 1996 Gümüşova-Gerede Başkent Ankara'nın ulaşım sectionsorununa is located çağdaş on bir Anatolian çözüm olarak yapılan Motorway which Ankaray-Hafif connects Europe Raylı Toplu to Asia, Taşım Yüksel Proje Sisteminin has supervised inşaatıthe ile detailed ilgili topografik, designsjeolojik prepared ve jeoteknik by the etütler yapılmış, contractor and has güzergah, provided, güzergah consulting yapıları, and supervision istasyonlar, services for depo the construction, sahası ve atölye commissioning binasına aittests and uygulamaperiod. warranty projeleri A hazırlanmıştır. 90-km section of the road has been completed and opened to traffic. Another 26-km section SisteminKaynaşlı between Özellikleri and Çaydurt, which is called the Bolu Mountain Crossing, will be:completed 2006. Hat uzunluğu 8.7 km, çiftinhat Yolcu Kapasitesi : 25,000 yolcu/yön/saat Project Characteristics : 3. ray Enerji Besleme Road İstasyon Length : :116 11 km ad. (yeraltı ist.) Nos. Delme of Tünel Lanes : :2x3 2,000 lanes m Aç-Kapa Viaducts Tünel : :Totaling 6,000 m 7,746 m Tunnels Hemzemin ve Yarma : :Tube 1,000 1 :m3,243m Maksimum hız Tube : 80 km/saat 2 : 3,307m Bridges İşletme Hızı : :100 35 ea km/saat Small İşletmeye Structures alındığı tarih: :227 Ağustos ea 1996 Maintenance Centers : 3 ea Parking Areas : 2 ea Toll Plazas : 6 ea Highways Raylý Sistemler Project İşin Adı Name A Black nkaraSea Hafif Coast RaylıRoad Sistem rojesi (ANKARAY) Location P Black Sea Region / Türkiye Contract Date Yeri Ankara 2001 / Türkiye Highways Raylý Sistemler Project İşin Adı Name A Afghanistan nkara Hafif State Raylı Roads Sistem Projesi (ANKARAY) Location Yeri Ankara Afghanistan / Türkiye Date 1992 2006 C Bompletion aşlama Tarihi ContractTarihi Date 1992 2003 Başlama Date 1995 2005 Completion Bitiş Tarihi Bitiş Tarihi 1995 For various sections of the Black Sea Coast Road, the topographical and bathymetric mappingçağdaş both onbirland and Başkent Ankara'nın ulaşım sorununa çözüm at sea, and the geological and geotechnical surveys were olarak yapılan Ankaray-Hafif Raylı Toplu Taşım performed theile detailed designs for tunnels, bridges, Sisteminin and inşaatı ilgili topografik, jeolojik ve jeoteknik viaducts and other road structures as well etütler yapılmış, güzergah, güzergah yapıları, as the alignments interchanges, were binasına prepared.ait istasyonlar, and depo sahası ve atölye uygulama projeleri hazırlanmıştır. Espiye - Çarşıbaşı Total Road Length :69 km (2x2) Sistemin Özellikleri Carriageway Width :6 m Hat uzunluğu : 8.7:100 km, çift hat Design Speed km/hr Grade-Separated Yolcu Kapasitesi Crossings:13 : 25,000 yolcu/yön/saat ea Enerji Crossings Besleme : 3. ray Level :7 ea Total İstasyon ad. (yeraltı ist.) Nos. of Bridges : 11 :34 Delme Tünel : 2,000 m Tunnels :Kiliseburnu (220 m), Aç-Kapa Tünel : 6,000 m Tirebolu-1 (2,140 m), Hemzemin ve Yarma : 1,000 m Tirebolu-2 (620 m), Maksimum hız : 80 km/saat (500 m) Eynesil İşletme Shore Hızı Crossing: 35 km/saat Trabzon Total İşletmeye Roadalındığı Lengthtarih : Ağustos :7 km1996 (2x3) Carriageway Width :32 m Design Speed :100 km/hr Grade-Separated Crossings:7 ea Total Nos. of Bridges :7 Giresun-Espiye State Road Tunnels Aksu Tunnel :195 m (single tube) Geçilmez Tunnel :323 m (single tube) Uluburun Tunnel :214 m (double tube) Arıdurak Tunnel :330 m (double tube) Çayeli - Ardeşen - Hopa Road Tunnels Pazar Tunnel :1,152 m (double tube) Pazar 2 Tunnel :639 m (double tube) Kıyıcık Tunnel :1,100 m (double tube) For 750-km section ofulaşım the highways which were contracted Başkent Ankara'nın sorununa çağdaş bir çözüm by USAID, the Ankaray-Hafif World Bank and theToplu AsianTaşım Development olarak yapılan Raylı Bank for theinşaatı redevelopment of Afghanistan, Proje Sisteminin ile ilgili topografik, jeolojikYüksel ve jeoteknik has the topographical, geological and etütlerconducted yapılmış, güzergah, güzergah yapıları, geotechnical surveys andve prepared the detailed istasyonlar, depo sahası atölye binasına ait designs for the alignment, the pavement, and bridges and uygulama projeleri hazırlanmıştır. hydraulic structures. Sistemin Özellikleri Project Sections Hat uzunluğu : 8.7 km, çift hat Kabul-Kandahar Yolcu KapasitesiRoad : 25,000 yolcu/yön/saat Section B :49 km - USAID Enerji Besleme : 3. ray Kabul-Kandahar Road : 11 ad. (yeraltı ist.) İstasyon Section C :85mkm - USAID Delme Tünel : 2,000 Aç-Kapa Kabul-Dushi Road :75mkm - World Bank Tünel : 6,000 Kabul-Gardez :42mkm - USAID Hemzemin ve Road Yarma : 1,000 Pul-e Khumri-Hairatan Road :265 km - ADB Maksimum hız : 80 km/saat Balkh-Andkhoy :180 km - ADB İşletme Hızı Road : 35 km/saat Shibirgan Pultarih Road :53 km - USAID İşletmeye Sar-e alındığı : Ağustos 1996
Benzer belgeler
Marine algae and seagrasses of Tekirdağ (Black Sea, Turkey) 1
In this study, marine algae and seagrasses in the upper infralittoral zone of the Black
Sea coast of Tekirdağ (Turkey) were investigated. A total 156 taxon (153 algae and
3 seagrasses) in species o...