Agenda Costs of emissions prevention and control of
Transkript
Agenda Costs of emissions prevention and control of
This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Costs of emissions prevention and control By Luca Mancuso, Process Director, Amec Foster Wheeler This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Agenda Costs of emissions prevention and control of: • NOx • SO2 • Particulate Material This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Costs of NOx emissions prevention and control Agenda Costs of emissions prevention and control of: • NOx • SO2 • Particulate Material This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir DeNOx control Nitrogen oxides (NOX) formed during the combustion of fossil fuels are mainly NO, NO2 and N2O. NO contributes to over 90 % of the total NOX in most combustion types • Primary measures – Developed to control NOX formation and/or reduction in the boiler • Secondary measures – End-of-pipe techniques to reduce NOX emissions • SCR • SNCR Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir DeNOx Primary measures • Low NOx Burners – Low-NOX burners (LNB) modify the means of introducing air and fuel to delay the mixing, reduce the availability of oxygen, and reduce the peak flame temperature. – LNBs retard the conversion of fuel-bound nitrogen to NOX and the formation of thermal NOX, while maintaining high combustion efficiency. The pressure drop in air ducts increases, causing more operational expenses. – Types: • • • • Air-staged low NOX burner Flue-gas recirculation low NOX burner Fuel-staged low NOX burner Last generation of low NOX burners Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) DeNOx Secondary measures SCR for NOx emission reduction • Retrofit of SCR (key factors) – Constructability: site congestion, space, soil conditions, access roads, seismic and wind requirements – Available fan capacity – Allowable pressure drop – Flow distribution – Temperature and ammonia mixing requirements – Cost and schedule – Tie-in outage timing and duration This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Example of a SCR retrofit AIG and Mixers Turning Vanes Dampers Flow Rectifier Future Catalyst Initial Catalyst Charge This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) AIG and Mixers Future Cataly st Initial Cataly st Charg e This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) CASE STUDY - Key Design Bases • Site location: Turkey, w/o specific constraints for retrofit modifications • Coal – LHV: 4.6 MJ/kg (AR) – Sulphur: 1% • Subcritical Pulverised coal power station • Thermal input ~ 430 MWth • Net power output ~ 150 MWe This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir CASE STUDY - Macro economic assumptions 80.0 Unit Data Lignite cost $/t 15 years 25 Plant life Financial leverage % debt 100 Maintenance cost % of TIC 2% Load factor % 80 CO2 emission cost $/t 0 Inflation Rate % constant 70.22 70.0 60.0 33.47 50.0 LCOE, $/MWh Item 40.0 30.0 Fuel 0.54 8.47 Variable O&M Fixed O&M Capital 20.0 27.74 10.0 0.0 PC base case Lignite: 15 $/t ; Discount rate: 8% 80% capacity factor; Constant $, 2015. This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir SCR: expected techno-economic impacts Item Unit Data $/kWe 120 (1) Loss of Power Production kWe 730 Additional 6 inch w.g. flue gas pressure drop Anhydrous Ammonia cost $/t 600 Total: 510 k$/yr $/m3 5,000 % TIC/yr 1 CAPEX (EPC cost) Catalyst cost Maintenance cost Remark Total: 18 M$ Total: 560 k$/yr (20,000 hours of life) Total: 135 k$/yr (1) Considering no major constructability contraints TOTAL CAPEX: 18 M$ TOTAL O&M cost: 1.2 M$/yr This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Levelized Cost Of Electricity (LCOE): +3.4 $/MWh (+4.8%) 80.0 73.60 72.81 33.63 33.63 1.56 1.56 8.77 8.67 70.22 74.40 70.0 60.0 33.47 33.63 LCOE, $/MWh 50.0 40.0 30.0 0.54 8.47 1.56 Fuel 8.88 Variable O&M Fixed O&M Capital 20.0 27.74 29.63 28.94 30.32 PC base case PC + SCR PC + SCR -40% CAPEX PC + SCR +40% CAPEX 10.0 0.0 Lignite: 15 $/t ; Discount rate: 8% 80% capacity factor; Constant $, 2015. This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) SNCR: expected techno-economic impacts Item Unit Data $/kWe 30 Total: 4.5 M$ Loss of Power Production kWe 100 Ammonia Injection system Anhydrous Ammonia cost $/t 600 Total: 510 k$/yr % TIC/yr 1 Total: 34 k$/yr CAPEX (EPC cost) Maintenance cost Remark TOTAL CAPEX: 4.5 M$ TOTAL O&M cost: 0.54 M$/yr This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Levelized Cost Of Electricity (LCOE): +1.0 $/MWh (+1.4%) 80.0 70.22 71.24 71.05 71.43 33.47 33.49 33.49 33.49 1.02 1.02 1.02 70.0 60.0 LCOE, $/MWh 50.0 40.0 30.0 0.54 8.47 Fuel Variable O&M 8.54 8.51 8.56 Fixed O&M Capital 20.0 27.74 28.18 28.02 28.35 PC base case PC + SNCR PC + SNCR -40% CAPEX PC + SNCR +40% CAPEX 10.0 0.0 Lignite: 15 $/t ; Discount rate: 8% 80% capacity factor; Constant $, 2015. This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) DeNOx primary and secondary measures All costs are case-specific – Large range of variation is possible Expected SNCR cost: Expected LNB cost: Expected SCR cost: 30 $/kWe 30 $/kWe 120 $/kWe This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Clean gas outlet Costs of PM emissions prevention and control Agenda Costs of emissions prevention and control of: • NOx • SO2 • Particulate Material Manifold pipes Tubesheet Filter bags and cages Split-gas baffle Pulse header and pulse valves Dirty gas inlet This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) De-Dusting • Two Principles – Physical barrier: Fabric Filter – Induced electrostatic charge: ESP Sensitive to resistivity of the gas • Fabric Filter – – – – • Particulate emission level <5 mg/Nm3 Porous filter surface removes particulates from gas flow Product build up on filter causes pressure loss Energy for cleaning of filter ESP – – – – Removal of 99.9% of particles Charge and gas characteristics determine removal efficiency Open gas path provides low pressure loss Energy for charging flue gas This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir DESP WESP Roof-mounted T/Rs Roofmounted T/Rs 2 or 4 pt suspen sion Roofmounted gravity rappers 2 or 4 pt suspension Shopassembled curtains Continuou s plate irrigation Rigid discharge electrodes Shopassembled curtains Effluent drain Rigid discharge electrodes This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Filter for Particulate emission reduction • Fabric Filter (key features) – Pulse cleaning equipment – High degree of customization to meet project and customer needs – Shop-Assembled and Modular Designs – Captures: 99-99.9% for PM down to sub µm size, vapor Phase SO2, SO3, HCl, Hf, Hg, dependent on ash composition and operating conditions Manifold pipes Tubesheet Filter bags and cages Split-gas baffle Pulse header and pulse valves Dirty gas inlet Clean gas outlet This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Expected Techno-economic impacts Item CAPEX (EPC cost) Unit Data $/CFM 10 (1) Total: 5.6 M$ kWe 880 Additional flue gas pressure drop - - Negligible % TIC/yr 1 Total: 42 k$/yr Loss of Power Production Other operating costs Maintenance cost Remark (1) Considering no major constructability contraints TOTAL CAPEX: 5.6 M$ TOTAL O&M cost: 42 k$/yr This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Levelized Cost Of Electricity (LCOE): +1.0 $/MWh (+1.4%) 80.0 70.22 71.27 71.02 71.52 33.47 33.67 33.67 33.67 0.54 0.54 0.54 8.60 8.57 8.63 70.0 60.0 LCOE, $/MWh 50.0 40.0 30.0 0.54 8.47 Fuel Variable O&M Fixed O&M Capital 20.0 27.74 28.46 28.24 28.68 PC base case PC + Fabric Filters PC + Fabric Filters -40% CAPEX PC + Fabric Filters +40% CAPEX 10.0 0.0 Lignite: 15 $/t ; Discount rate: 8% 80% capacity factor; Constant $, 2015. This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Comparison of PM control application Technology Captures Capture Level Dry Electrostatic Precipitator Dry Solid Particulates 95-99.9% for PM down to 2.5 µm size Dry Solid Particulate and Fabric Filter Wet Electrostatic Precipitator Vapor phase SO2, SO3, HCl, Hf, Hg, Dioxins, Furans Dry Solid Particulates and H2O droplets, H2SO4 liquid aerosol Limited to polishing applications (low inlet dust loadings ) Outlet Pollutants Expected Levels Installed Operating Footprint Maintenance (in dry stack gas @ Cost Cost Index Index Items 6% O2) ($/CFM) down to 20 mg/Nm3 8.0 1.0 1.0 TRs and rapping system down to 2 mg/Nm3 for PM 10 0.9 0.8 Bags, cages and pulse valves 17 0.6 1.2 (with effluent treatment system) 0.5 TRs and irrigation system 99-99.9% for PM down to sub µm size Vapor Phase SO2, SO3, HCl, Hf, Hg dependent on ash composition and operating conditions 75-95% for PM and aerosols between 10 µm to sub-micron size down to 2 mg/Nm3 for PM, H2O droplets, H2SO4 aerosols This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Costs of SO2 emissions prevention and control • • Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Flue Gas Out Mist Eliminators Multiple Spray Headers Flue Gas In Dual Flow Tray Agenda Costs of emissions prevention and control of: • NOx • SO2 • Particulate Material Recycle Tank Agitators Oxidation Air Recycle Pumps This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Desulfurization • Primary measures – Use of a low sulphur fuel or fuel with basic ash compounds for internal desulphurisation – Use of adsorbents in fluidised bed combustion systems • Secondary measures – Regenerative processes: the spent sorbent is re-used after thermal or chemical treatment to produce concentrated SO2 which is then usually converted to elemental sulphur. NOT GENERALLY ATTRACTIVE – Non-Regenrative processes GENERAL CHOICE Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Desulfurization • Chemical Reaction – All commercial technologies are based on a reaction between Calcium and Sulfur • Wet Type – Cooling down of flue gas below water dew point – Sorbent is limestone based [CaCO3] – Technology: Wet Scrubber • Semi-Dry Type – Cooling down of flue gas above water dew point – Sorbent is lime based [CaO] – Technologies: Spray Dry Absorber or CFB Scrubber • Dry – No cooling of flue gas – Sorbent is hydrated lime based [Ca(OH)2] – Technologies: Dry Sorbent Injection This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) WFGD for SOx emission reduction • Retrofit of FGD (key factors) – Constructability: site congestion, space, soil conditions, access roads, seismic – Fuel composition – Available fan capacity – Existing site auxiliary and support facilities – Cost and schedule – Tie-in outage timing and duration This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Typical flue gas treatment This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Typical flue gas treatment Air Absorber Fabric Filter Water Product Discharge CFB Boiler Flue Gas and Ash ID Fan Stack Lime Hydrated Lime Silo Dry Lime Hydrator Lime Silo Product Silo Recovery Optional This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir WFG: Expected Techno-economic impacts Item Unit Data $/kWe 270 (1) Total: 40.5 M$ Loss of Power Production kWe 1200 Additional 6 inch w.g. flue gas pressure drop, air fan for FGD, raw water pump consumption Limestone cost $/t 10 Total: 800 k$/yr $/m3 0.1 Total: 16 k$/yr % TIC/yr 1 Total: 304 k$/yr CAPEX (EPC cost) Water cost Maintenance cost Remark (1) Considering no particular constructability contraints TOTAL CAPEX: 40.5 M$ TOTAL O&M cost: 1.1 M$/yr This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Levelized Cost Of Electricity (LCOE): +5.9 $/MWh (+8.4%) 80 76.12 77.95 74.30 70.22 70 60 33.74 33.74 33.74 33.47 LCOE, $/MWh 50 40 30 1.31 0.54 9.14 1.31 1.31 9.38 8.90 8.47 Fuel Variable O&M Fixed O&M Capital 20 27.74 31.93 30.34 PC + FGD PC + FGD -40% CAPEX 33.51 10 0 PC base case Lignite: 15 $/t ; Discount rate: 8% 80% capacity factor; Constant $, 2015. PC + FGD +40% CAPEX This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technology and Pollutant Capture Capture Level 75-99% for SO2 30-70% for SO3 90-99+% for HCl, HF 10-70% for total Hg (across absorber) Wet FGD 90-95% for total Hg (with upstream PAC DSI system SO2, SO3, HCl, Hf, 20-60% for PM (in addition to DESP) Hg 0-30% for PM (in addition to FF) Absorbers with multiple dual flow trays typically perform at higher end of range. Open Absorber tower designs typically perform at lower end of range 75-95% for SO2 up to 1.5% fuel sulfur 90-99% for SO3 up to 1.5% fuel sulfur 75-99+% for HCl, HF 50-70% for total Hg SO2, SO3, HCl, Hf, 90-95% for total Hg with PAC Hg, Dioxins, 95-98% for Dioxins and Furans Furans 99-99.9% for PM down to sub µm size (FF) Spray Dryer Absorber Circulating Fluidized Bed Scrubber 75-99% for SO2 90-99+% for SO3 75-99+% for HCl, HF 60-80% for total Hg SO2, SO3, HCl, Hf, 90-99% for total Hg with PAC Hg, Dioxins, 95-98% for Dioxins and Furans Furans 99-99.9% for PM down to sub µm size (FF) Outlet Pollutants Levels (in dry stack gas @ 6% O2) 10-200 mg/Nm3 (3-70 ppm) for SO2 10-50 mg/Nm3 (3-15 ppm) for SO3 3 -15 mg/Nm3 (1-7 ppm) for HCl, HF 0.35-0.65 µg/Nm3 for total Hg (with upstream PAC DSI system) down to 2 mg/Nm3 for PM (upstream FF) down to 20 mg/Nm3 for PM (upstream ESP) 60-200 mg/Nm3 (20-70 ppm) for SO2 under 1-3 mg/Nm3 (0.3-1 ppm) for SO3 3 - 15 mg/Nm3 (1-7 ppm) for HCl, HF 0.5 - 1.0 µg/Nm3 for total Hg 0.35-0.65 µg/Nm3 for total Hg (with PAC) under 1 ng/Nm3 for Dioxins, Furans down to 2 mg/Nm3 for PM (FF) 60-200 mg/Nm3 (20-70 ppm) for SO2 under 1-3 mg/Nm3 (0.3-1 ppm) for SO3 under 1-15 mg/Nm3 (0.5-7 ppm) for HCl, HF 0.42 - 0.85 µg/Nm3 for total Hg 0.35-0.65 µg/Nm3 for total Hg (with PAC) under 0.1 ng/Nm3 for Dioxins, Furans down to 2 mg/Nm3 for PM (FF) Sorbent Sorbent and Stoich Cost Ratio Index Limestone 1.0 1.03 Installed Cost ($/kWe)/ Water Use/ Foot Print Index 270 1.00 1.00 Hydrated Lime 1.7 - 1.8 6.0 1.3-1.5 with PCD solids recycle Hydrated Lime 1.3-1.5 150 0.60 0.40 Maintenance Items Recycle Slurry Pumps Gypsum Absorber Slurry Nozzles Absorber Liners Scrubber Sludge Mist Eliminators (when Gypsum is not produced) Crushers, pumps, valves, belts, mixers, filters, Liquid Effluent compressors, and tanks containing within limestone prep, Chlorides, oxidation, and Metals dewatering systems Motors, compressors gearboxes, bearings, nozzle inserts, and rotary wheels Pumps, valves, slaker, agitator, tanks, compressors within lime prep and slurry systems Water nozzles 6.0 160 0.60 0.60 By Product Ash Slide and Valve Dry Solid Containing CaSO4, CaSO3, CaO, fuel ash Dry Solid Containing CaSO4, CaO, Hg, carbon, fuel ash This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technology and Pollutant Capture Wet FGD SO2, SO3, HCl, Hf, Hg Capture Level 75-99% for SO2 30-70% for SO3 90-99+% for HCl, HF 10-70% for total Hg (across absorber) 90-95% for total Hg (with upstream PAC DSI system 20-60% for PM (in addition to DESP) 0-30% for PM (in addition to FF) Absorbers with multiple dual flow trays typically perform at higher end of range. Open Absorber tower designs typically perform at lower end of range Dry Sorbent Injection SO2, SO3, HCl, Hf, Hg, Dioxins, Furans 50-75% for SO2 50-90% for SO3 50-95% for HCl, HF 70-95% for total Hg with PAC 70-98% for Dioxins and Furans 90-99.9% for PM Capture levels very dependent on sorbent, injection location and PCD equipment type and performance Outlet Pollutants Levels (in dry stack gas @ 6% O2) 10-200 mg/Nm3 (3-70 ppm) for SO2 10-50 mg/Nm3 (3-15 ppm) for SO3 3 -15 mg/Nm3 (1-7 ppm) for HCl, HF 0.35-0.65 µg/Nm3 for total Hg (with upstream PAC DSI system) down to 2 mg/Nm3 for PM (upstream FF) down to 20 mg/Nm3 for PM (upstream ESP) 60-200 mg/Nm3 (20-70 ppm) for SO2 15-30 mg/Nm3 (5-10 ppm) for SO3 5-15 mg/Nm3 (2-7 ppm) for HCl, HF 0.35-2 µg/Nm3 for total Hg (with PAC) 0.3-2 ng/Nm3 for Dioxins, Furans 2-50 mg/Nm3 for PM (Fabric Filter) down to 2 mg/Nm3 for PM (FF) down to 20 mg/Nm3 for PM (ESP) Outlet levels very dependent on sorbent, injection location and PCD equipment type and performance Sorbent Sorbent and Cost Stoich Ratio Index Limestone 1.0 1.03 Installed Cost ($/kWe)/ Water Use/ Maintenance Items Foot Print Index 270 1.00 1.00 By Product Recycle Slurry Pumps Absorber Slurry Gypsum Nozzles Absorber Liners Scrubber Sludge Mist Eliminators (when Gypsum is not produced) Crushers, pumps, valves, belts, mixers, Liquid Effluent filters, compressors, containing and tanks within Chlorides, Metals limestone prep, oxidation, and dewatering systems Hyd Lime PAC 6 for Hyd Lime Tronna 50 for PAC SBC 1.5 for Trona 3-5 for Individual Sorbent 45 for SBC 27 0.00 0.10 Dry Sorbent Dry Solid pneumatic transport Containing CaSO4, system, metering CaSO3, CaO, Hg, valve and injection carbon, fuel ash lances This project is co-financed by the European Union and the Republic of Turkey Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Levelized Cost Of Electricity (LCOE) - SUMMARY 100 90 80 70.22 73.60 76.12 75.69 33.74 33.27 71.27 78.75 LCOE, $/MWh 70 60 50 40 30 33.47 0.54 33.63 1.56 33.67 0.54 Fuel 1.31 9.14 1.29 9.10 2.31 Variable O&M 9.36 Fixed O&M 8.77 8.60 27.74 29.63 28.46 31.93 32.03 33.79 PC base case PC + SCR PC + Fabric Filters PC + FGD PC + FF + FGD PC + SCR + FF + FGD 8.47 Capital 20 10 33.30 0 Lignite: 15 $/t ; Discount rate: 8% 80% capacity factor; Constant $, 2015. This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001) Summary findings • Technical solutions are available for retrofitting coal-fired power plants in Turkey to comply with major EU environmental policies (IED) • Pollutant abatement technologies result in higher capital and operating costs, leading to an increase of the LCOE: – +4.8% SCR – +1.4% SNCR – +1% Fabric Filter – +8.4% FGD This project is co-financed by the European Union and the Republic of Turkey Bu Proje Avrupa Birliği ve Türkiye Cumhuriyeti tarafından finanse edilmektedir Questions? Technical Assistance for Better Air Quality by Transposing the Large Combustion Plants Directive (TR2010/0327.04-01/001)
Benzer belgeler
Technical Requirements for LCPs
Compliance with Rate of Desulphurisation
DeNOx Technologies
Particulates
Large Combustion Plant (LCP) Directive Flexibility Mechanisms
the combustion of fossil fuels are
mainly NO, NO2 and N2O.
NO contributes to over 90 % of the
total NOX in most combustion types
Regulatory Impact Assessment
Technical Assistance for Better Air Quality by
Transposing the Large Combustion Plants
Directive (TR2010/0327.04-01/001)